2/28/24 |
STBG-4901(652) |
County of St. Louis, City of Shrewsbury - Resurface roadway, new sidewalk, upgrade existing sidewalk & curb ramps |
Spencer Owens |
3/13/24 |
2/14/24 |
STBG 5555(617) |
City of Des Peres, Des Peres Road, Replace and widen sidewalk, replace curb ramps that have not previously been upgraded to PROWAG standards, etc. |
Steve Meyer |
3/29/24 |
2/14/24 |
TAP-7303(623) |
St. Charles County, Multiple Roads in Frenchtown, New and reconstructed sidewalk, bike climbing lane, curb bump outs, new ADA curb ramps. |
Jonathan Swagman |
3/4/24 |
2/14/24 |
STBG-7302(704) |
St. Charles County, Fox Hill Road, Asphalt pavement rehabilitation for existing 36’ wide roadway. New 5’ wide ADA sidewalks with green space buffer on both sides, new ADA curb ramps. |
Jonathan Swagman |
2/29/24 |
2/14/24 |
STBG-5617(605)
CMAQ-5617(606)
|
Great Rivers Greenway, Grand Boulevard/Cass Avenue, Improve Road Conditions and safety/Construction Surveying and Staking, etc. |
Lonny Boring |
2/29/24 |
2/14/24 |
CMAQ-7302 (708) |
St. Charles County, Route N and Hopewell / Duello Intersection and Path Improvements Project |
Kurt Mandernach |
2/29/24 |
2/14/24 |
STBG-5595(619) |
City of Florissant, St Catherine Street, N New Florissant Rd to Waterford Drive, St Catherine Street Improvements |
Thomas J Goldkamp |
3/6/24 |
2/14/24 |
STBG-7302(711) |
City of St. Peters, Jungermann Road Resurfacing Phase 2 - McClay Road to MO 364
Addendum 1
|
|
3/11/24 |
2/14/24 |
CMAQ-7302(703) |
St. Charles County, Tom Ginnever/N Cool Springs Inter, Construction of a roundabout including pedestrian improvements. |
Paul Talimonchuk |
2/29/24 |
2/7/24 |
STBG-5602(627) |
St. Louis City, Loughborough Avenue Bridge over Union Pacific Railroad, bridge replacement |
Helen Bryant |
2/28/2024 |
2/7/24 |
CMAQ-9901(699) |
St. Louis City, Traffic Management Enhancements Phase 6, signal upgrades, fiber optic interconnect, traffic monitoring cameras, and signal timing and optimization along Dr. Martin Luther King Drive between Hodiamont Avenue and Grand Boulevard |
Helen Bryant |
2/28/2024 |
1/25/24 |
STBG - 6200(617) |
City of Union, Denmark Road at Progress Parkway, Intersection improvements, pavement repair, add ADA compliant sidewalk and pedestrian improvements, lighting. |
J.D. Kelley |
2/9/24 |
1/24/24 |
CMAQ-6400(628) |
City of Washington, Hwy 100/Rabbit Trail Intersection Improvement and Phoenix Center Drive Relocation |
Charles Stankovic |
2/9/24 |
1/24/24 |
CMAQ-5456(619) |
Citizens for Modern Transit is teaming up AARP in St. Louis, community-engaged design collaborator/artist/creative person. |
|
2/16/24 |
12/28/23 |
STBG-6401(603) |
City of Washington, Third Street from Jefferson St. to High St, A two-inch asphalt resurfacing with full with cold mill, removal and replacement of all sidewalks |
Charles Stankovic |
1/9/24 |
1/8/24 |
STBG-6401(603) |
City of Washington, Third Street from Jefferson St. to High St, A two-inch asphalt resurfacing with full with cold mill, removal and replacement of all sidewalks |
Charles Stankovic |
1/12/24 |
1/27/23 |
STBG-4901(652) |
City of Shrewsbury, Weil Avenue, resurface roadway, new sidewalk, upgrade existing sidewalk & curb ramps. |
Spencer Owens |
1/31/24 |
12/13/23 |
CMAQ-5456(618) |
Citizens for Modern Transit (CMT), St. Louis Region, Building Ridership on Transit. |
Kimberly Cella |
1/4/24 |
11/22/23 |
TAP-9901(695) |
St. Louis District, St. Louis City, Louisiana Avenue Calm Street Phase 2 between Holly Hills Avenue and Meramec Street |
Helen Bryant |
12/20/23 |
11/22/23 |
TAP-7303 (625) |
City of St. Peters - Mid Rivers Mall Drive Multi-Use Path - Rte. N to MO 364 |
|
12/13/23 |
11/22/23 |
STBG-7302(711 |
City of St. Peters - Jungermann Road Resurfacing Phase 2 - McClay Road to MO 364 |
|
12/13/23 |
11/22/23 |
STBG-7302(702) |
St. Charles County - City of O'Fallon - Hoff Road - Reconstruction of Hoff Road |
Thomas Kelley |
12/20/23 |
12/19/23 |
STBG-7302(702) |
St. Charles County - City of O'Fallon - Hoff Road - Reconstruction of Hoff Road |
Thomas Kelley |
12/20/23 |
11/22/23 |
TAP-5504(606) |
Manchester /Saint Louis County Carman Road – LaBonne – Dougherty Ferry Rd -
Carman Road Pedestrian Improvements
|
Errol Tate |
12/8/23 |
11/8/23 |
CMAQ-5456(619) |
Citizens for Modern Transit, City MetroBus stop for the design and development of a site-specific Transit Transformation project |
|
12/8/23 |
10/25/23 |
Sl0181/S503078 |
City of Olivette, Request for Qualifications for Professional Services related to the Olive Blvd Intersections Improvement Project |
Bruce McGregor |
11/14/23 |
10/25/23 |
STBG-7302(697) |
STL District, County St. Charles, Regency Parkway Way from Veterans Memorial Parkway to Zumbehl Rd, New pavement with 2-11’ lanes and 12’ center turn lane, 5’ wide ADA sidewalks with green space buffer on both sides, New ADA curb ramps, and new street lighting at intersections. |
Jonathan Silver |
11/8/23 |
10/25/23 |
|
City of Washington, Busch Creek along W. Eight Street from Elm Street to Sunnyside Street, Install Guardrail |
Charles Stankovic |
11/13/23 |
10/11/23 |
SL0119/SL0161 |
STL District, St. Charles County, I-70 North Outer Road Extension Cost Share Project |
Kurt Mandernach |
11/2/23 |
10/11/23 |
CMAQ-7302 (705) |
STL District, St. Charles County, Consultant Services for St Charles County Signal Performance Measures Module and Signal Improvements including signal optimization |
Jacob Becher |
11/3/23 |
10/11/23 |
TAP-5502(616) |
City of Kirkwood (St. Louis County), South Taylor Avenue Road and East Monroe Avenue, Pedestrian and bicyclist connection from the Historic Kirkwood Train Station in Downtown Kirkwood to the existing Kirkwood trailhead near the intersection of Holmes Avenue and Leffingwell Avenue. |
Rachel Shelley |
10/25/23 |
10/11/23 |
STBG-5401(722) |
The City of St. Ann, Remove & reconstruct a portion of Pear Tree Ln. and all of Country Ln |
Ryan Meyer |
11/10/23 |
10/11/23 |
CMAQ-5456(619) |
Citizens for Modern Transit, St. Louis Region, Increase in Ridership on the St. Louis Transit System |
Kimberly Cella |
10/30/23 |
9/27/23 |
STBG-5618(602) |
St. Louis County, Pierside Lane, Pierside Lane Roadway improvements to include full depth concrete road repairs, concrete curb & gutter repairs, etc... |
Mike Hartwig |
11/9/23 |
9/27/23 |
STBP-7302(701) |
City of Lake Saint Louis, Lake Saint Louis Boulevard S Phase 2 Improvement Project, This project proposes widening Lake Saint Louis Blvd from 2 to 3 lanes, new curb and gutters, closed drainage length of project, 6’ and 10’ shared path sidewalks. |
Terry Rigdon |
10/19/23 |
9/27/23 |
STBG-7302(710) |
City of St. Paul, St. Paul Picnic Grounds, Bridge Replacement and Miscellaneous Road and Drainage Improvements |
John J. Choinka |
11/1/23 |
9/28/23 |
STBG-7302(710) |
City of St. Paul, St. Paul Picnic Grounds, Bridge Replacement and Miscellaneous Road and Drainage Improvements |
John J. Choinka |
11/1/23 |
8/23/23 |
|
Franklin County, Missouri Eastern Railroad (MER) Union Transload Facility, professional engineering, consulting, and related services, Coordinate with permitting agencies to update property owners’ legal information, etc. |
|
9/6/23 |
8/23/23 |
STP-9901(655) |
City of Vinita Park, Midland Blvd & North and South Rd Sidewalk Improvements |
Brent Bury |
9/22/23 |
8/23/23 |
TAP-5410(636) |
STL County, City of Chesterfield, Schoettler Road Sidewalk, Sidewalk with a retaining wall relocation. |
Steve Merk |
9/21/23 |
8/9/23 |
CMAQ-5456(618) |
St. Louis Region, Increase in Ridership on the St. Louis transit system |
Kimberly Cella |
8/23/23 |
8/9/23 |
STBG-5401(723)
STBG-9901(696)
STBG-9901(697)
STBG-9901(698)
STBG-5527(603)
|
St. Louis County – Five-Project Bundle
STBG-5401(723) - Chambers Road - Bellefontaine Road to STL City Limits
STBG-9901(696) - Howdershell Road - Utz to Lynn Haven
STBG-9901(697) - Lucas-Hunt Road Bridge No. 157
STBG-9901(698) - Schuetz Road - Gandy to Lindbergh
STBG-5527(603) - Vernon Avenue - Midland to Westgate
Mill & Overlay, Shared-Use Paths, Bridge Replacement, ADA Improvements, and Traffic Signal Upgrade/Replacement
ADDENDUM 1 - Revisions To Schedule
|
Shandrika Combs |
9/15/23 |
7/12/23 |
TAP-4900(644)
TAP-4900(645)
TAP-4900(643)
TAP-5613(612)
|
St. Louis County – Four-Project Bundle:
St. Louis County, Mehl Avenue Sidewalk Improvements TAP-4900(644), TIP No. 7281D-24
St. Louis County, North and South Road Sidewalk Improvements TAP-4900(645), TIP No. 7281C-24
St. Louis County, Hoffmeister Avenue Sidewalk Improvements TAP-4900(643); TIP# 7281B-24
St. Louis County, Airport Road Multimodal Improvements TAP-5613(612), TIP No. 7281A-24
|
Shandrika Combs |
8/11/23 |
7/25/23 |
TAP-4900(644)
TAP-4900(645)
TAP-4900(643)
TAP-5613(612
|
St. Louis County – Four-Project Bundle: - Addendum 1
St. Louis County, Mehl Avenue Sidewalk Improvements TAP-4900(644), TIP No. 7281D-24
St. Louis County, North and South Road Sidewalk Improvements TAP-4900(645), TIP No. 7281C-24
St. Louis County, Hoffmeister Avenue Sidewalk Improvements TAP-4900(643); TIP# 7281B-24
St. Louis County, Airport Road Multimodal Improvements TAP-5613(612), TIP No. 7281A-24 Addendum 1
|
Shandrika Combs |
8/11/23 |
7/25/23 |
TAP-4900(644)
TAP-4900(645)
TAP-4900(643)
TAP-5613(612)
|
St. Louis County – Four-Project Bundle: - Addendum 1
St. Louis County, Mehl Avenue Sidewalk Improvements TAP-4900(644), TIP No. 7281D-24
St. Louis County, North and South Road Sidewalk Improvements TAP-4900(645), TIP No. 7281C-24
St. Louis County, Hoffmeister Avenue Sidewalk Improvements TAP-4900(643); TIP# 7281B-24
St. Louis County, Airport Road Multimodal Improvements TAP-5613(612), TIP No. 7281A-24 Addendum 1
|
Shandrika Combs |
8/11/23 |
7/12/23 |
|
City of Washington, Project: Main Street Reconstruction and ADA Compliance Project, Total roadway reconstruction |
Charles Stankovic |
7/28/23 |
7/12/23 |
STBG-5408(609) |
City of Hazelwood, Teson Road, Road Resurfacing |
Nikki Miller |
8/26/23 |
7/12/23 |
STBG-9901(672) |
County of St. Charles, Eggering Drive from Sonderen Street to St. Matthew Avenue, Reconstruction of existing roadway, addition of curb ramps and sidewalk, repair of curb ramps and sidewalk, new curb & gutter, share the road markings |
Paul Talimonchuk |
8/1/23 |
6/30/23 |
CMAQ-5456(618) |
City of St. Louis, Increase in Ridership on the St. Louis transit system |
Kimberly Cella |
7/14/23 |
5/24/23 |
TAP-7303(622) |
City of Saint Charles, Frenchtown Great Streets: N. 2nd St Improvements & Main St Extension |
Jonathan Silver |
6/16/23 |
4/26/23 |
CMAQ 7305(625) |
City of St. Peters, Harvester Road at Queensbrooke Blvd, Signal Replacement |
|
5/12/23 |
5/9/23 |
CMAQ 7305(625) |
City of St. Peters, Harvester Road at Queensbrooke Blvd, Signal Replacement Addendum 1 |
|
|
4/12/23 |
STP-7305(623) |
City of St. Peters, Jungs Station Road Resurfacing |
|
4/27/23 |
4/25/23 |
STP-7305(623) |
City of St. Peters, Jungs Station Road Resurfacing Addendum 1 |
|
|
4/12/23 |
CMAQ-5456(619) |
Citizens for Modern Transit, St. Louis Region - Increase in Ridership on the St. Louis transit system |
Kimberly Cella |
4/28/23 |
3/23/23 |
STP-4901(650) |
City of Florissant, Mullanphy Road, Patterson Road to Shackelford Road, resurfacing the roadway, replacement of damaged or deteriorated curb and sidewalk, construction of accessible curb ramps, and new sidewalk to improve pedestrian safety and mobility |
Thomas J Goldkamp |
4/13/23 |
3/8/23 |
CMAQ-54445(609) |
City of Arnold, Route Richardson Rd, Intersection Relocation. |
Judy Wagner |
3/24/23 |
2/22/23 |
CMAQ-5456(618) |
City of St. Louis, Increase in Ridership on the St. Louis transit system |
Kimberly Cella |
3/10/23 |
2/22/23 |
CMAQ-9901(671) |
American Lung Association, lead agency for the Clean Air Partnership, Reduced air pollution due to transportation emissions |
Susannah Fuchs |
3/8/23 |
3/3/23 |
CMAQ-9901(671 |
American Lung Association, lead agency for the Clean Air Partnership, Reduced air pollution due to transportation emissions
Changes included: more detail regarding project budget and scope and new deadline date
|
Susannah Fuchs |
3/24/23 |
3/15/23 |
CMAQ-9901(671 |
SUPPLEMENT SHEET TO RFP for support for CMAQ 9901(671) |
Susannah Fuchs |
3/20/23 |
2/8/23 |
STP-7305(623) |
City of St. Peters, Jungs Station Road Resurfacing. |
|
2/23/23 |
2/8/23 |
STP-7305(622) |
City of St. Peters, Barkwood Trails Drive Reconstruction. |
|
2/23/23 |
2/8/23 |
STP-4950(605) |
City of St. Peters, Route Mexico Road at Dardenne Creek, Bridge Rehabilitation and Widening. |
|
2/23/23 |
2/8/23 |
STP-5410(635) |
City of Sunset Hills, Route W Watson Road, Improve Drainage and Base, add sidewalk. |
Bryson E. Barker |
|
2/8/23 |
STP-5504(605) |
City of Manchester, Route Hanna Road, Pavement pedestrian upgrades |
Errol Tate |
3/7/23 |
2/8/23 |
STBG-5445(608) |
City of Arnold, Route Pomme Rd, Reconstruction and addition of Sidewalks |
Judy Wagner |
2/28/23 |
2/8/23 |
CMAQ-5445(609) |
City of Arnold, Route Richardson Rd, Intersection relocation. |
Judy Wagner |
2/28/23 |
1/25/23 |
RFQ 23-007 |
City of O'Fallon, Widening of Diehr Road with a dedicated turn lane. |
Paul Talimonchuk |
2/23/23 |
1/25/23 |
RFQ 23-005 |
City of O'Fallon, Route W. Terra Lane, Realignment of W. Terra Lane |
Paul Talimonchuk |
2/23/25 |
1/25/23 |
CMAQ-9901(677) |
County of St. Charles, seeking assistance of a qualified consultant for design, project management, and integration support for Automated Traffic Signal Performance Measures (ATSPM) for traffic signals along the corridors Elm St, Fifth St, First Capitol Dr/ Kingshighway Blvd, and Zumbehl Rd. |
Kurt Mandernach |
2/23/25 |
2/10/23 |
CMAQ-9901(677) |
County of St. Charles, seeking assistance of a qualified consultant for design, project management, and integration support for Automated Traffic Signal Performance Measures (ATSPM) for traffic signals along the corridors Elm St, Fifth St, First Capitol Dr/ Kingshighway Blvd, and Zumbehl Rd. Addendum 1 |
Kurt Mandernach |
2/23/23 |
1/25/23 |
CMAQ-9901(676) |
County of St. Charles, seeking assistance of a qualified consultant for design, project management, and integration support for Automated Traffic Signal Performance Measures (ATSPM) for traffic signals along the Main St corridor in the city of O’Fallon. |
Kurt Mandernach |
2/23/23 |
2/10/23 |
CMAQ-9901(676) |
County of St. Charles, seeking assistance of a qualified consultant for design, project management, and integration support for Automated Traffic Signal Performance Measures (ATSPM) for traffic signals along the Main St corridor in the city of O’Fallon. Addendum 1 |
Kurt Mandernach |
2/23/23 |
1/25/23 |
CMAQ-9901(675) |
County of St. Charles, seeking assistance of a qualified consultant for design, project management, and integration support for Automated Traffic Signal Performance Measures (ATSPM) for traffic signals along the corridors Jungermann Rd, Spencer Rd, and Salt Lick Rd. |
Kurt Mandernach |
2/23/23 |
2/10/23 |
CMAQ-9901(675) |
County of St. Charles, seeking assistance of a qualified consultant for design, project management, and integration support for Automated Traffic Signal Performance Measures (ATSPM) for traffic signals along the corridors Jungermann Rd, Spencer Rd, and Salt Lick Rd. Addendum 1 |
Kurt Mandernach |
2/23/23 |
1/25/23 |
STP-5583(610) |
City of Ferguson, Reconstruct & upgrade sidewalks - N. Florissant Road to N. Elizabeth Ave. |
Koray Gilbert |
2/17/23 |
1/25/23 |
STP-9901(686) |
Pennsylvania Avenue Phase 1: resurfacing, sidewalk upgrades, and lane reduction |
Shandrika Combs |
2/17/23 |
1/25/23 |
STP-9901(679) |
Big Bend Road resurfacing, sidewalk upgrades, and lane reduction |
Shandrika Combs |
2/17/23 |
1/25/23 |
STP-9901(682) |
Howdershell Road resurfacing, sidewalk upgrades, and signal improvements |
Shandrika Combs |
2/17/23 |
2/3/23 |
STBG-9901(682) |
Howdershell Road resurfacing, sidewalk upgrades, and signal improvements Addendum 1 |
Shandrika Combs |
2/17/23 |
1/19/23 |
CMAQ-9901(690) |
City of St. Louis, services of roadway infrastructure improvements on Delmar Boulevard |
Helen Bryant |
2/9/23 |
12/14/22 |
STBG-541(635) |
City of Sunset Hills, St. Louis County, 2" Mill and 2.5" Overlay, Improve Drainage and Base, Add 5' Sidewalk |
Bryson E. Baker |
1/25/23 |
12/14/22 |
STP-7304(618) |
City of Wentzville, St. Charles County, Mexico Road, Shouldering, Pavement Repairs, Resurfacing, Safety Improvements, Pedestrian Facility Improvements |
Jeffrey D. Lenk |
1/11/23 |
12/14/22 |
STBG-5419-616 |
City of Pacific, 4th Street from W. Osage Street (Business Loop I-44) Intersection South to Denton Road, Full Depth Pavement Widening and Resurfacing |
Steve Roth |
1/9/23 |
1/17/23 |
STBG-5419-616 |
City of Pacific, 4th Street from W. Osage Street (Business Loop I-44) Intersection South to Denton Road, Full Depth Pavement Widening and Resurfacing |
Steve Roth |
2/3/23 |
11/23/22 |
STP-5502(615) |
City of Kirkwood, Route: North Kirkwood Road Improvement Project |
Rachel Shelley |
12/13/22 |
11/9/22 |
|
Citizens for Modern Transit (CMT) is requesting the services of a graphics design, Building Ridership on Transit |
Kimberly Cella |
11/23/22 |
10/26/22 |
SL0091 |
City of Wildwood, Route 100 J-Turns of Interest |
|
11/18/22 |
10/26/22 |
SL0092 |
City of Wildwood, Route 100 Left Turn Lanes Project |
Dan Rahn |
11/18/22 |
10/26/22 |
STP-5502(614) |
City of Kirkwood, Clay Avenue from Adams Avenue to Woodbine Avenue, Improvement Project, Raised Intersection at Argonne & Jefferson, Resurfacing, upgrade sidewalks |
Rachel Shelley |
11/10/22 |
10/26/22 |
STP-7302(692) |
City of St. Charles, Muegge Road Rehabilitation |
Alex Weidenbenner |
11/16/22 |
10/26/22 |
STP-5414(643) |
City of St. Charles, Duchesne Drive Reconstruction |
Alex Weidenbenner |
11/16/22 |
10/12/22 |
STP-9901(683) |
County of St. Louis, Jennings Station Road from Halls Ferry Road to St. Louis City Limit, Resurfacing, ADA Upgrades, Shared-Use Path, Signal Upgrades, Sidewalk Improvements and Bus Pad Installation |
Shandrika Combs |
11/2/22 |
10/31/22 |
STP-9901(683) |
ADDEDNUM NO.1 |
Shandrika Combs |
11/9/22 |
10/12/22 |
STP-9901(681) |
County of St. Louis, Hawkins Road - New Sugar Creek Road from Rockwood School District Entrance to Jefferson County Line, Resurfacing, ADA Upgrades, Shared-Use Path, and Signal Upgrades |
Shandrika Combs |
11/2/22 |
10/31/22 |
STP-9901(681) |
ADDEDNUM NO. 1 |
Shandrika Combs |
11/9/22 |
10/12/22 |
STP-5613(611) |
County of St. Louis, Hanley Road from West Bruno Avenue to Dale Avenue, Resurfacing, ADA Upgrades, Widening/Median Installation, and Signal Upgrades |
Shandrika Combs |
11/2/22 |
10/31/22 |
STP-5613(611) |
ADDENDUM NO.1 |
Shandrika Combs |
11/9/22 |
10/12/22 |
STP-9901(680) |
County of St. Louis, Dorsett Road from Marine Avenue to McKelvey Road, Resurfacing, ADA Upgrades, New Shared-Use Path, and Signal Upgrades |
Shandrika Combs |
11/2/22 |
10/31/22 |
STP-9901(680) |
ADDENDUM NO.1 |
Shandrika Combs |
11/9/22 |
10/12/22 |
CMAQ-9901(684) |
County of St. Louis, Yaeger Road at Milburn Road Roundabout |
Shandrika Combs |
11/2/22 |
10/31/22 |
CMAQ-9901(684) |
AADENDUM NO.1 |
Shandrika Combs |
11/9/22 |
9/28/22 |
STP-7302(690) |
City of O'Fallon, Main Street - Phase III |
Paul Talimonchuk |
10/21/22 |
9/14/22 |
TIP 7178(023) |
City of Dellwood, Missouri Street Resurfacing and Pedestrian Improvements Project |
Terry Wilson |
9/28/22 |
8/31/22 |
TAP 5418(624) |
City of Lake Saint Louis, Technology Drive (Lake Saint Louis Boulevard to Technology Drive Loop) |
Terry Rigdon |
9/29/22 |
8/10/22 |
STP-9901(667) |
City of Maplewood/St Louis County, Greenwood Blvd, Reconstruction, Sidewalks, Curb Ramps |
Anthony Traxler |
8/25/22 |
6/22/23 |
STP-4940(607) |
City of Washington, Front Street ADA Improvements Project |
John Nilges, PE |
7/13/22 |
6/8/22 |
CMAQ 5414(639) |
St. Charles Smart Parking Management System |
Kurt Mandernach |
6/22/22 |
5/25/22 |
STP-4940 (608) |
City of Washington, High Street from Fifth Street to Front Street, Asphalt Resurfacing, Sidewalk Replacement, Retaining Walls |
John Nilges, PE |
6/10/22 |
5/25/22 |
STP-5503(609) |
City of Frontenac, Spoede Road, Bridge Replacement Over Deer Creek |
Jeff Wappelhorst |
6/10/22 |
5/25/22 |
STP-5402(618) |
City of University City, Canton from North and South to N Hanley, Resurfacing, Sidewalks, and Curb & Gutter Improvements |
Sinan Alpaslan |
6/8/22 |
5/11/22 |
STP5568(604) |
City of Glendale, N. Sappington Road Preservation |
Terry Jones |
6/2/22 |
4/27/22 |
CMAQ-4950(604) |
County of St. Charles, St Charles County Signal Performance Measures Module and Signal Improvements including Signal Optimization |
Kurt Mandernach |
5/12/22 |
4/27/22 |
CMAQ-7302(695) |
County of St. Charles, for St Charles County Signal Performance Measures Module and Signal Improvements including signal optimization |
Kurt Mandernach |
5/12/22 |
4/5/22 |
CMAQ-5456(618) |
Citizens for Modern Transits (CMT) St. Louis Region, Increase in Ridership on Transit, Seeking a Graphic Design Consultant to Assist CMT with their Campaign |
Kimberly Cella |
4/29/22 |
3/31/22 |
CMAQ 5615(602) |
City of St. Peters, Mid Rivers Mall Dr - St. Peters Howell Rd Lane Improvements |
Amanda L. Rich |
4/21/22 |
3/30/22 |
CMAQ 5456(618) |
Citizens for Modern Transit (CMT), St. Louis Region, Increase in Ridership on the St. Louis Transit System design/build |
Kimberly Cella |
4/20/22 |
3/25/22 |
CMAQ 5456(618) |
Citizens for Modern Transit (CMT), St. Louis Region, Increase in Ridership on the St. Louis Transit System |
Kimberly Cella |
4/29/22 |
3/9/22 |
TAP-5502613 |
City of Kirkwood, Train Station Rehabilitation
City of Kirkwood, Train Station Rehabilitation Addendum 1
|
Cassandra James |
3/21/22 |
2/24/22 |
STP-5622(603) |
City of Florissant, Rue St. Denis Street Improvements |
Thomas J Goldkamp |
3/11/22 |
2/22/22 |
STP5445(603) |
County of Jefferson, Flucom Road Improvements |
Daniel Naunheim |
3/25/22 |
2/22/22 |
STP5445(604) |
County of Jefferson, Harmony Hills Road Bridge Replacement |
Daniel Naunheim |
3/25/22 |
2/22/22 |
STP5445(605) |
County of Jefferson, Old Hwy M Improvements |
Daniel Naunheim |
3/25/22 |
2/7/22 |
TAP-5500(688) |
City of Wildwood, Old State Road Shared Use Path Project |
Daniel P. Rahn, P.E. CFM |
3/1/22 |
1/18/22 |
STP-5613(610) |
County of St. Louis, Hanley Road-Leclede Station Road Resurfacing |
Kori Neely, P.E. |
2/16/22 |
1/18/22 |
STP-5547(603) STP-5559(602) |
County of St. Louis, Baumgartner Road Resurfacing, and Bennington Place Resurfacing |
Kori Neely, P.E. |
2/16/22 |
1/18/22 |
STP-4901(651) |
County of St. Louis, Laclede Station Road Resurfacing, Watson to Weil |
Kori Neely, P.E. |
2/16/22 |
1/18/22 |
STP-5523(625) |
County of St. Louis, Dorsett Road Resurfacing -270 to Old Dorsett |
Kori Neely, P.E. |
2/16/22 |
1/18/22 |
STP-5506(604) |
County of St. Louis, Charbonier Road Resurfacing |
Kori Neely, P.E. |
2/16/22 |
1/10/22 |
CMAQ-5419(615) |
City of Pacific, 1st and Osage Intersection Improvements (Re-Posting) |
Steve Roth |
1/31/22 |
1/7/22 |
STP-5662(603) |
City of Florissant, Rue St. Denis Improvements Phase II |
Thomas J. Goldkamp |
1/24/22 |
1/5/22 |
STP-4901(646) |
City of Shrewsbury, Street Resurfacing and Pedestrian Improvements Project |
Elliot Brown |
1/31/22 |
12/29/21 |
SOQ #22-042 |
City of Wentzville, Route Z Widening and Signalization |
Alice Winkelman, Procurement Manager |
1/21/22 |
12/21/21 |
Citizens for Modern Transit |
St. Louis Region, Increase in Ridership on the St. Louis Transit System |
Kimberly Cella |
1/19/22 |
12/15/21 |
CMAQ-7302 |
City of OFallon, Weldon Spring Road Phase 1 |
Paul Talimonchuk |
01/07/22 |
12/15/21 |
J6S3668 |
City of O'Fallon, Cost Share Route K and N |
Chris Clercx |
01/07/22 |
12/14/21 |
STP-5419(615) |
City of Pacific, 1st and Osage Intersection Improvements |
Steve Roth |
12/30/21 |
12/10/21 |
STP-7302(685) |
City of O'Fallon, Main Street Phase 2 Roadway Resurfacing, Sidewalk/Pedestrian Improvements to Meet ADA Compliance |
Julie Moellering |
12/31/21 |
12/10/21 |
No Current Federal Aid |
City of O'Fallon, Sommers Road, Road Widening/Improvements, Pedestrian Improvements, Resurfacing |
Julie Moellering |
12/31/21 |
12/10/21 |
No Current Federal Aid |
City of O'Fallon, Crestview Drive Roadway Improvements, Storm Water Improvements, Pedestrian Improvements |
Julie Moellering |
12/31/21 |
11/30/21 |
CMAQ-5456(617) |
St. Louis Region, Increase in Ridership on the St. Louis Transit System |
Kimberly Cella |
12/17/21 |
11/18/21 |
STP-5402(619) |
City of University City, Canton Avenue Phase II Road Project |
Errol Tate |
12/15/21 |
10/18/21 |
STP5414(640) |
City of Saint Charles, Second Street Reconstruction |
Jonathan Silver, PE |
11/4/21 |
9/13/21 |
STP-5502(611) |
City of Kirkwood, St Louis County, North Kirkwood Road Improvement Project |
Cassandra James |
10/7/21 |
9/3/21 |
STP-5502-(612) |
City of Kirkwood, St. Louis County, Lindeman Road from Dougherty Ferry Road to Des Peres City Limits |
Cassandra James |
9/23/21 |
8/26/21 |
STP-5502(612) |
City of Kirkwood, St. Louis County Route: Lindeman Road Improvement Project |
Cassandra James |
9/23/21 |
8/13/21 |
TAP 5407(619), TIP 7161-(022) |
City of O’Fallon, Dardenne Greenway Connector Project
City of O'Fallon, Dardenne Greenway Connector Project Addendum 1
|
Julie Moellering |
9/3/21 |
8/11/21 |
STP-5602-(625) |
City of Wildwood, Route 109 and Route BA South Roundabout, New Roundabout with Shared Use Path |
Daniel Rahn |
9/9/21 |
6/23/21 |
CMAQ-5456(617) |
City of St. Louis, Citizens for Modern Transit ("CMT"), Workforce Development Try & Ride |
Kimberly Cella |
7/18/21 |
6/17/21 |
STP-9901(642) |
City of Vinita Park, North and South Road between Page and Midland Boulevard, New Sidewalk, Curb and Gutter, and ADA Curb ramps |
Brent Bury |
7/7/21 |
6/9/21 |
CMAQ-5456(617) |
City of St. Louis, St. Louis Region, Increase in Ridership |
Kimberly Cella |
6/28/21 |
6/9/21 |
STP-9901(633) |
City of New Haven, Downtown Front, Miller, Main and Olive reconstruction and Improvements of Existing Roadways |
Kathleen A Trentmann |
7/6/21 |
6/1/21 |
TAP 5418(622) |
City of Lake Saint Louis, Lake Saint Louis Blvd. 100 Ft South of Veterans Memorial Drive |
Derek Koestel, P.E. |
6/24/21 |
4/30/21 |
CMAQ-7305(621) |
County of St. Charles, Mid Rivers Mall Drive Signal Performance Measure Module
County of St. Charles, Mid Rivers Mall Drive Signal Performance Measure Module Addendum 1
County of St. Charles, Mid Rivers Mall Drive Signal Performance Measure Module Addendum 2
|
Kurt Mandernach |
5/26/21 |
4/30/21 |
CMAQ-7302(688) |
County of St. Charles, Bryan Road Wentzville Parkway Signal Performance Measure
County of St. Charles, Bryan Road Wentzville Parkway Signal Performance Measure Addendum 1
County of St. Charles, Bryan Road Wentzville Parkway Signal Performance Measure Addendum 2
|
Kurt Mandernack |
5/26/21 |
4/30/21 |
STP-5602(624) |
City of Crestwood, Whitecliff Park Lane, Remove and Replace Bridge |
James E. Gillam |
5/26/21 |
4/21/21 |
|
City of Ferguson, Resurfacing South Dade Avenue from Airport Road to Suburban Avenue |
Don Boyce |
5/3/21 |
4/12/21 |
TAP-4901(648) |
County of St. Louis, Transportation Public Works, Old Jamestown Road Sidewalk - Phase III |
Pam Thebeau, P.E. |
5/11/21 |
3/23/21 |
STP-6406(607) |
City of Washington, Jefferson Street, Roadway and ADA Compliance Project |
John Nilges |
4/9/21 |
3/4/21 |
STP-4940(606) |
St Louis County Transportation Public Works, Reavis Barracks & Green Park Bridge Replacement
St. Louis County Transportation Public Works, Reavis Barracks & Green Park Bridge Replacement - Addendum 1
|
Pam Thebeau, P.E. |
3/18/21 |
2/25/21 |
|
City of O' Fallon, Request for Qualifications – Lake St. Louis Blvd. Ph. 3. **Non LPA Project** |
Thomas Kelley |
3/19/21 |
2/25/21 |
1483 |
City of University City, Stormwater Master Plan, **Non LPA Project** |
|
3/16/21 |
3/4/21 |
STP-5613(609) |
North Hanley Road (F) Resurfacing
North Hanley Road (F) Resurfacing Addendum 1
|
Pam Thebeau, P.E. |
3/16/21 |
2/18/21 |
STP-9901(659) |
Sulphur Spring Road Resurfacing
Sulphur Spring Road Resurfacing Addendum 1
|
Pam Thebeau, P.E. |
3/16/21 |
2/18/21 |
STP-4901(647) |
West Florissant Avenue (A) Resurfacing
West Florissant Avenue (A) Resurfacing Addendum 1
|
Pam Thebeau, P.E. |
3/16/21 |
2/18/21 |
STP-1956(604), STP-5526(651), STP-9901(660) |
Lackland Road Resurfacing, Olive Boulevard Resurfacing, Woodson Road Resurfacing
Lackland Road Resurfacing, Olive Boulevard Resurfacing, Woodson Road Resurfacing Addendum 1
|
Pam Thebeau, P.E. |
3/16/21 |
10/30/19 |
CMAQ-5456(615) |
Citizens for Modern Transit (CMT), St Louis Region, Seeking Design Consultant to assist with Ten Toe Express campaign |
Kimberly Cella |
12/4/19 |
10/24/19 |
STP-5645(603) |
City of St. Charles, St. Charles County, Zumbehl Road Culvert Replacement |
Kierstyn Lorince |
11/12/19 |
10/22/19 |
STP 5418(618) |
City of St. Ann, Geraldine Avenue Bridge, Reconstruct Bridge |
Ryan Meyer |
11/7/19 |
10/15/19 |
STP-4989(614) |
City of Fenton, Rudder Road Roadway Improvements |
Matthew Budd |
11/7/19 |
10/9/19 |
STP-6401(602) |
City of Washington, Third Street Overlay and Improvements Project |
John Nilges |
11/1/19 |
9/26/19 |
STP-4900(640) |
St Louis County, Bridge Replacement J.S. McDonnell Boulevard over Coldwater Creek |
Pamela Thebeau |
10/14/19 |
9/26/19 |
STP-4900(639) |
St Louis County, Heintz Road Bridge No. 513 replacement |
Pamela Thebeau |
10/14/19 |
8/22/19 |
STP-5418(616) |
City of Lake Saint Louis, Hawk Ridge Trail and Ronald Reagan Drive Improvement Project |
Terry Rigdon |
9/5/19 |
7/15/19 |
STP 5502(608) |
City of Kirkwood, Geyer Road Resurfacing - Phase 1 |
Cassandra James |
8/16/19 |
6/28/19 |
CMAQ-7302(680) |
Regional ITS Data Sharing Initiative - Phase 1
Regional ITS Data Sharing Initiative - Phase 1 Addendum 1 Posted 7/25/19
Regional ITS Data Sharing Initiative - Phase 1 Addendum 2 Posted 8/2/19
Regional ITS Data Sharing Initiative Phase 1 Updated Addendum 3 8/15/19 posted 8/13/19
|
Kurt Mandenach |
8/16/19 |
6/17/19 |
CMAQ 9901(650) |
St. Louis Metro, Reduced air pollution due to transportation emissions |
Susanna Fuchs |
7/8/19 |
5/22/19 |
BRO-B096(004) & BRO-B096(006) |
St. Louis County, Bridge Rehabilitation, Hudson Drive & Vorhof Drive over Black Jack Creek
St. Louis County, Bridge Rehabilitation, Hudson Drive& Vorhof Drive over Black Jack Creek - Addendum 1 posted 5/31/19
|
Pamela R. Thebeau, P.E. |
6/11/19 |
5/22/19 |
BRO-B096(004) & BRO-B096(006) |
St. Louis County, Bridge Replacement, New Ballwin Road over Kiefer Creek
St. Louis County, Bridge Replacement, New Ballwin Road over Keifer Creek - Addendum 1 posted 5/31/19
|
Pamela R. Thebeau, P.E. |
6/11/19 |
5/22/19 |
BRO-B096(007) |
St. Louis County Bridge Replacement, Wyncrest Drive over Branch of Grand Glaize Creek
St. Louis County Bridge Replacement, Wyncrest Drive over Branch of Grand Glaize Creek - Addendum 1 posted 5/31/19
|
Pamela R. Thebeau, P.E. |
6/11/19 |
5/10/19 |
CMAQ-5414(633)
CMAQ-5414(634)
|
Gateway Green Light (GGL) Phase 5 and Phase 6 – PE Package B |
Kurt Mandernach |
5/30/19 |
4/30/19 |
CMAQ-5414(635) |
St. Charles County, Missouri 94 Roadway and Signal Improvements
St. Charles County, Missouri 94 Roadway and Signal Improvements, Addendum #1 Posted 5/15/19
|
Amanda Brauer |
5/14/19 |
4/3/19 |
CMAQ-5438(614) |
City of Clayton, Brentwood Boulevard Resurfacing Project Addendum 1
City of Clayton, Brentwood Boulevard Resurfacing Project (updated 4/9/19)
City of Clayton, Brentwood Boulevard Resurfacing Project
|
Matt Malick, PE |
4/10/19 |
3/15/19 |
BRO-B115(018) |
City of St. Louis, Reconstruction of Hamilton Bridge over Metrolink. |
Helen Bryant |
|
3/4/19 |
STP-4939(608) |
City of Ballwin, Holloway Road Resurfacing and Sidewalk Replacement |
Andy Hixon |
4/4/19 |
2/15/19 |
SOQ #19-110 |
City of Wentzville, Wentzville Parkway South Extension Phases 1 and 2 |
Jeffrey D. Lenk |
2/27/19 |
2/14/19 |
|
City of Dardenne Prairie, General Engineering Services for the Missouri Route 364 at Technology Drive |
|
2/27/19 |
2/11/19 |
STP-5403(691)-Combined |
Jefferson County Bridge Replacement, Armbruster road, Doss Hollow Road, and Harness Road |
Jason Jonas |
3/15/19 |
2/11/19 |
|
City of Dardenne Prairie, Land Acquisition Services for Hanley Road Reconstruction and Improvements (Non-LPA) |
Kimberlie Clark |
3/1/19 |
2/5/19 |
STP-7202-604 |
Jefferson County, Seckman Road at Mastodon State Park, Safety Improvements |
Jason Jonas |
3/8/19 |
2/5/19 |
STP-5403-691 |
Jefferson County, Armbruster Road Bridge over Haverstick Creek
Bundled Project
|
Jason Jonas |
|
2/5/19 |
STP-5403-693 |
Jefferson County, Hillsboro House Springs Road Bridge over Bourne Creek |
Jason Jonas |
3/8/19 |
2/5/19 |
|
Jefferson County, Harness Road Bridge over Tributary to Hocum Hollow Creek
Bundled Project
|
Jason Jonas |
|
2/5/19 |
STP-5403-692 |
Jefferson County, Doss Hollow Road Bridge over Plattin Creek
Bundled Project
|
Jason Jonas |
|
2/5/19 |
|
City of O'Fallon, Guthrie Road Improvement Project
City of O'Fallon, Guthrie Road Improvement Project Addendum 1
|
Ruth Field |
2/20/19 |
2/1/19 |
CMAQ-4917(602) |
City of St. Charles,
Little Hills Expressway and Mel Wetter Roundabout Project
|
Matt Seggerman |
2/18/19 |
1/28/19 |
STP-5490(615) |
Franklin County, Boeuf Creek Road, Bridge Replacement |
Ronald J. Williams |
2/22/19 |
1/15/19 |
STP-5503(607) |
City/County - Frontenac/St. Louis County Route - Gerer Road, New sidewalks curb/gutter, pavement and, storm water control. |
Jeff Wappelhorst |
2/1/19 |
12/20/18 |
STP-5402-616 |
City of University City, Department of Public Works and Parks, Westgate Ave pavement, parking, and sidewalk upgrades
City of University City, Department of Public Works and Parks, Westgate Ave pavement, parking, and sidewalk upgrades Addendum 1
City of University City, Department of Public Works and Parks, Westgate Ave pavement, parking, and sidewalk upgrades Addendum 2
|
Chris Kalter |
1/11/19 |
12/19/18 |
STP-4901(644) |
City of Eureka, Allenton Bridge over Union Pacific Railroad |
Craig E. Sabo |
1/17/19 |
12/19/18 |
STP-5451(602) |
City of St. Louis, Board of Public Service, Compton Avenue Bridge Reconstruction |
Helen Bryant |
1/17/19 |
12/17/18 |
STP-5417(605) and CMAQ-5417(604 |
City of St. Louis, Board of Public Service, I-64 at Jefferson - City streets improvements |
Helen Bryant |
1/10/19 |
11/30/18 |
STP-4901(643) |
St. Louis County, Bridge Replacement, Meramec Bottom Road over Lemay Creek |
Scott R. Norris |
1/7/19 |
11/27/18 |
STP 5418 (613) |
City of St. Ann, Ashby Road, Mill and Overlay w/ADA complaint handicap ramps |
Vince Hamm |
12/27/18 |
11/27/18 |
STP 5565 (610) |
|
Vince Hamm |
12/27/18 |
11/19/18 |
STP-5558(610) |
McKelvey Road Resurfacing and Sidewalks – Phase 2 Glenpark Drive to Creve Coeur Mill Road |
Kori Neely |
12/11/18 |
10/15/18 |
|
City of Valley Park, pavement reconstruction, curb and gutters, sidewalks, St. Louis Avenue from Third Street to Seventh Street. |
Gerald Martin |
11/7/18 |
10/15/18 |
STP-7302(670) |
City of O'Fallon, Road resurfacing and drainage improvements, pedestrian improvements, Winghaven Blvd., from south of highway N to south of Hammock Drive intersection |
Chris Clercz |
11/5/18 |
10/23/18 |
City of O'Fallon, Road resurfacing and drainage improvements, pedestrian improvements, Winghaven Blvd., from south of highway N to south of Hammock Drive intersection Addendum #1 |
|
|
09/24/18 |
STP-5418(615) |
City of Lake Saint Louis, Intersection of Lake Saint Louis Boulevard/Veterans Memorial Parkway/ I-70. roadway improvement includes constructing a six-legged roundabout at the intersection of Lake Saint Louis Boulevard and Veterans Memorial Parkway. Construction of 6’ ADA compliant concrete sidewalk and curb ramps |
Terry Rigdon |
10/19/18
12:00 pm
|
08/14/18 |
STP-5412(604) |
City of Richmond Heights, Lovella Avenue Bridge over Claytonia Creek, Bridge replacement and adjacent roadway construction |
Chris Boyd, P.E. |
08/31/18
12:00 PM
|