240920-A01 JNW0002 Route 59 Buchanan County. Grading and pavement from Sta. 55+00.00 near Virginia Street to Sta. 12+95.00 at West Cliff Street, the total length of improvement being 0.476 miles.
240119-B01 J2P3062 Route 61 CLARK County. Raising pavement from 0.3 mile south of the Iowa State line to east of Rte. 136 near Alexandria, the total length of improvement being 1.354 miles. Virtual Pre-Bid Meeting
240119-D03 (1): Job J5P3467 Route 54 COLE County. 2 Bridge rehabilitations over W. McCarty and Route 50, the total length of improvement being 1.198 miles. (2): Job J5S3464 Route B COLE County. Bridge rehabilitation over the Moreau River south of Jefferson City, the total length of improvement being 0.572 miles. Virtual Pre-Bid Meeting
240119-B03 J2S3324, Route A, Scotland County, Bridge rehabilitation over BNSF Railroad, 0.3 Miles East of Route M near Rutledge, J2S3326, Route T, Scotland County, Bridge rehabilitation over North Fork Middle Fabius River, 1.9 Miles West of Route 15 near Bible Grove, Virtual Pre-Bid Meeting
230915-H04 Job JSE0160 Route C, Madison County, Soil nail wall 0.1 mile west of Saint Francis River near Saco, the total length of improvement being 0.02 miles