2025 Central District Construction Guide

With hundreds of projects across the 18 counties of MoDOT’s Central District, drivers may encounter some type of construction this year on many of the routes they use daily. While the list is extensive, it does not include every project for 2025 but instead focuses on those with traffic impacts that are being done by contractors.

Most of these are taking care of the existing system, including projects that rehabilitate bridges, replace signals, improve intersections, and resurface roadways. To see the current active work zones, visit Traveler.modot.org. Make sure you click the 'future workzones' layer on the left-hand menu to see work scheduled to be performed by both MoDOT personnel and contractors in the next seven days. 

The work listed below totals a nearly $1.8 billion investment in the region’s roads and bridges, as well as a substantial investment by the state legislature in the region as part of the Improve I-70 Program

Don’t see a project listed below for a road you’re concerned about? Check the STIP page for upcoming planned projects through 2029. 

Some of the 2025 work and impacts include:

Image
Nighttime girder placement

Boone County

  • Interstate 70 and U.S. Route 63 – Improve I-70 program.
  • U.S. Route 63 and Route AC – Interchange improvements.
  • Outer Road 63 – Resurfacing from Route VV to the end of state maintenance.
  • Route E – Resurfacing from Missouri Route 124 to Blackfoot Road.
  • Route F – Resurfacing entire route from U.S. Route 63 to Missouri Route 124.
  • Route HH – Resurfacing entire route from Route B to Route Z.
  • Route N – Resurfacing from Missouri Route 163 to the end of state maintenance.
  • Route OO – Resurfacing entire route from Route B to Route Z.
  • Route PP – Resurfacing from east of Ballenger Lane to the end of state maintenance.
  • Route T – Resurfacing entire route from Route F to Route B in Randolph County.
  • Route TT (Broadway) – Resurfacing from Missouri Route 740 (Stadium) to Fairview in Columbia.
  • Route U – Resurfacing from Missouri Route 124 to the end of state maintenance.
  • Route V – Resurfacing from Missouri Route 22 to Route U.
  • Route VV – Resurfacing entire route from Outer Road 63 to the end of state maintenance.
  • Route WW – Resurfacing from U.S. Route 63 to Route J.
  • Route Z – Resurfacing from Gano Chance Drive in Centralia to the end of state maintenance.
Image
Callaway 54 underneath

Callaway County

  • Interstate 70 and U.S. Route 54 – Improve I-70 program.
  • U.S. Route 54 – Resurfacing from the Missouri River Bridge to north of Kingdom City.
  • Route F – Resurfacing from Route J to Jefferson Street in Fulton.
  • Route H ­– Resurfacing from U.S. Route 54 to Route J.
  • Route J – Resurfacing from I-70 to U.S. Route 54.
  • Route M – Resurfacing from I-70 to the Audrain County line.
  • Route RA – Resurfacing from Route J to the end of state maintenance.
  • Route Z – Resurfacing from I-70 to Business U.S. 54 in Fulton.
Image
road

Camden County

  • U.S. Route 54 – Widening from Missouri Route 5 to Bumper Hill Road.
  • Route A – Resurfacing from U.S. Route 54 to Huston Street in Richland.
  • Route C – Resurfacing entire route from Route A to Missouri Route 17 in Miller County.
  • Route D – Shoulder widening from U.S. Route 54 to Brush Arbor Road and resurfacing entire route from U.S. Route 54 to Route E in Laclede County.
  • Route E – Resurfacing entire route from Missouri Route 7 to Route A.
  • Route H – Resurfacing entire route from Missouri Route 7 to Route T in Laclede County.
  • Route JJ – Resurfacing entire route from Route T to Route F in Laclede County.
  • Route N – Resurfacing entire route from U.S. Route 54 to the end of state maintenance.
  • Route W – Resurfacing entire route from U.S. Route 54 to the end of state maintenance. 
Image
tri level bridges

Cole County

  • U.S. Route 54 – Eastbound bridge replacement over Neighorn Branch. Westbound bridge deck replacement over Neighorn Branch.
  • U.S. Route 54 – Eight bridge rehabilitations over Business Route 50 (east and westbound), Linden Drive (east and westbound), Stadium Boulevard (east and westbound), Moreau River Overflow (westbound), and Madison Street ramp.
  • U.S. Route 50 – Bridge rehabilitation over Vetter Lane (east and westbound) and on Bolivar Street over U.S. Route 50.
  • Route V – Resurfacing entire route from Route A to Route C.

 

Image
bridge over river with ice

Cooper County

  • Missouri Route 41 – Bridge rehabilitation over the Lamine River.
  • Route BB – Resurfacing entire route from Missouri Route 135 in Clifton City to Old Route 50 in Otterville.
  • Route CC – Resurfacing entire route from Missouri Route 41 to the end of state maintenance.
  • Route H – Resurfacing entire route from U.S. Route 50 to Route O.
  • Route HH – Resurfacing entire route from Route M to the end of state maintenance.
  • Route KK – Resurfacing entire route from Route B to Old Concord Road.
  • Route NN – Resurfacing entire route from Route N to the end of state maintenance.
  • Route OO – Resurfacing entire route from Missouri Route 135 to Route M.
  • Route PP – Resurfacing entire route from Missouri Route 5 to the end of state maintenance.
  • Route T – Resurfacing entire route from Route B to the end of state maintenance.
  • Route W– Resurfacing entire route from Route J to the end of state maintenance.
Image
new bridge

Crawford County

  • Outer Road 44 – Bridge rehabilitation over the Little Bourbeuse River.
  • Route C – Bridge rehabilitation over I-44.
  • Route F – Resurfacing entire route from I-44 to Missouri Route 19.
  • Route FF – Bridge rehabilitation over I-44.
  • Route J – Bridge replacement over Boone Creek.
  • Route KK – Resurfacing entire route from Route ZZ near Cuba to South Outer Road 44 near Rosati.
  • Beamer Lane - Bridge rehabilitation over I-44.
Image
old truss bridge

Dent

  • Missouri Route 19 – Bridge replacement over Standing Rock Creek.
  • Route H – Resurfacing entire route from Missouri Route 72 to U.S. Route 63 in Phelps County.
  • Route J – Resurfacing entire route from Missouri Route 72 to Missouri Route 32.
  • Route K – Resurfacing from Missouri Route 19 to Route KK in Shannon County.
Image
Frene Creek bridge

Gasconade County

  • U.S. Route 50 – Resurfacing from Linn to Rosebud.
  • Missouri Route 19 – Resurfacing from U.S. Route 50 to the Crawford County line.
Image
bridge profile

Howard County

  • Missouri Route 5 – Bridge replacement and ADA improvements over Bear Creek in Glasgow.
  • Missouri Route 5 and U.S. Route 40 intersection - Intersection improvements south of New Franklin.
  • Route A – Resurfacing from Missouri Route 124 to Route B in Randolph County and from Missouri Route 124 to Route EE.
  • Route AA – Resurfacing entire route from Missouri Route 87 to Route E.
  • Route EE – Resurfacing entire route from Route A to Route J in Boone County.
Image
deck pour

Laclede County

  • Outer Road 44 – Bridge replacement over Bear Creek.
  • Route AC – Resurfacing entire route from Route N to Route K.
  • Route C – Resurfacing entire route from I-44 to Missouri Route 5.
  • Route D – Resurfacing entire route from U.S. Route 54 in Camden County to Route E.
  • Route E – Resurfacing entire route from Missouri Route 5 to the end of state maintenance in Dallas County.
  • Route H – Resurfacing from Route BB to Route T in Camden County.
  • Route HH – Resurfacing entire route from Missouri Route 5 to the end of state maintenance.
  • Route JJ – Resurfacing entire route from Route F to Route T in Camden County.
  • Route PP – Resurfacing entire route from Route C to Route J.
Image
42 over fly creek

Maries County

  • Missouri Route 42 – Bridge rehabilitations over the Maries River and Fly Creek.
  • Route AA – Bridge rehabilitations over the Piney River and Little Piney River.
Image
Mill Creek Bridge

Miller County

  • U.S. Route 54 – Resurfacing and guard cable improvements from Missouri Route 242 to the Cole County line.
  • Route C – Resurfacing entire route from Missouri Route 17 to Camden County Route A.
  • Route V – Resurfacing entire route from U.S. Route 54 to the end of state maintenance.
Image
intersection

Moniteau County

  • Missouri Route 87 – Intersection improvements at Route C near High Point.
  • Missouri Route 179 – Bridge rehabilitation over Moniteau Creek south of Sandy Hook.
  • Route MM – Resurface entire route from Route F to the end of state maintenance.
  • Route P – Resurface entire route from Missouri Route 179 to the end of state maintenance near Lupus.
  • Route U – Bridge rehabilitation over Howard Creek.
  • Route V – Resurface entire route from Route A to Route C in Cole County.
Image
52 Surface

Morgan County

  • Missouri Route 52 – Intersection improvements at Missouri Route 5 and widening Missouri Route 52 from Brown Road to Missouri Route 5.
  • Route PP – Resurface entire route from Route D to the end of state maintenance.
Image
Resurfaced road

Osage County

  • U.S. Route 50 – Intersection improvements at Route CC in Linn and resurfacing from Loose Creek Highway west of Linn to Route C in Franklin County.
  • Route E – Bridge rehabilitation over Town Creek.
Image
Phelps nighttime resurfacing

Phelps County

  • I-44 – Pavement rehabilitation and reconstruction eastbound between Rolla and St. James.
  • I-44 – Bridge rehabilitation over Little Piney Creek and BNSF Railroad near Jerome.
  • Business Loop 44 – Bridge rehabilitation over I-44.
  • North Outer Road 44 – Resurfacing in Doolittle, east and west of Routes C and T; in Rolla from Route V west to the end of state maintenance; and from Route V in Rolla to Missouri Route 68 in St. James.
  • South Outer Road 44 – Resurfacing from west of Route V in Rolla to Missouri Route 68 in St. James.
  • U.S. Route 63 – Bridge rehabilitation over Mill Creek.
  • Route CC – Resurfacing entire route from U.S. Route 63 to the end of state maintenance.
  • Route D – Bridge rehabilitation over I-44.
  • Route E – Bridge rehabilitation over I-44.
  • Route EE – Resurfacing entire route from Route B to the end of state maintenance.
  • Route J – Bridge rehabilitation over I-44.
  • Route M – Resurfacing from U.S. Route 63 to Route J.
  • Route T – Resurfacing entire route from I-44 to Route P.
  • County Road 8490 – Bridge rehabilitation over I-44.
Image
route 66/44

Pulaski County

  • Missouri Route 28 – Bridge rehabilitation over I-44.
  • North Outer Road 44 – Resurfacing in St. Robert from Missouri Route 28 to Route Y.
  • Route NN – Resurfacing entire route from Missouri Route 17 to the end of state maintenance.
  • Route PP – Resurfacing entire route from Missouri Route 28 to the end of state maintenance.
Image
Route A complete

Washington County

  • Missouri Route 8 – Bridge rehabilitation over the Union Pacific Railroad.
  • Missouri Route 47 – Bridge rehabilitation over Mill Creek.
  • Route C – Bridge replacement over Big River.