Project Summary

The Missouri Route 47 bridge over Mill Creek in Washington County, north of Potosi, was constructed in 1965, is narrow, and the deck is in poor condition. A project is currently in the planning and design stage that will replace the current bridge deck with a wider one, bring the bridge rails up to current safety standards, and install new guardrail at the ends of the bridge. These improvements will enhance safety, drivability, and traffic flow.

Project Progress

Complete
Planning, Design, and Right of Way Acquisition Phase
milestone_icon
Complete
Public Input
milestone_icon
Complete
Project Letting, Award, and Notice to Proceed

This project was part of MoDOT's March 2025 letting when contractors submitted competitive bids. The Missouri Highways and Transportation Commission awarded the contract as part of their April 2025 meeting. The $798,000 contract was awarded to UTD, LLC. The notice to proceed was May 5, 2025.

milestone_icon
Not Started
Project Construction, Traffic Impacts, and Completion
Sept. 15 - mid-November

Construction is expected to begin Tuesday, Sept. 16, 2025. The contractor will close Route 47 at the bridge with a signed detour over Routes 67, 8, and 21. The roadway is expected to reopen in mid-November. 

milestone_icon

Project News

FREQUENTLY ASKED QUESTIONS

Why is MoDOT replacing the bridge?

The existing Route 47 bridge over Mill Creek was built in 1965, and the deck needs to be replaced.  The bridge width, bridge rail, and guardrail need to be upgraded. The deck is in poor condition, but the substructure is in good condition. The new bridge deck and rail will improve the drivability and safety for motorists.

The current plan will close the bridge to all traffic through the completion of the project up to 60 calendar days (updated from the previously announced 110 calendar days). The contractor plans to close the road Sept. 16, 2025, through mid-November. A signed detour will be posted over Routes 67, 8, and 21. 

What if I have further questions?

You may email CDCR@modot.mo.gov or call us at 888 ASK MODOT (1-888-275-6636). Please reference Washington County Missouri Route 47 Mill Creek Bridge Project on your inquiries.

How can I stay updated on the project’s progress?

Sign up for project-specific updates using the form below.