The Missouri Department of Transportation is implementing a project to address the aging pavement on St. Charles Rock Road (Route 180) from the St. Louis City limits to west of I-270. The corridor contains numerous pavement deficiencies, aging traffic signals and lacks connectivity along and across the corridor for pedestrians.
This project has two phases. Phase one is from I-170 to the St. Louis City limits and phase 2 runs from just west of I-270 to I-170.
As part of the project, MoDOT will also upgrade existing sidewalks along the corridor to meet the Americans with Disabilities Act (ADA) requirements.
Project Timeline
Summer 2020 to Fall 2022
To Be Complete Fall 2023
PHASE 1 DETAILS (Complete)
Phase I of the project focuses on St. Charles Rock Road from the St. Louis City limits west to I-170. Proposed improvements will be made along the corridor through the following communities: Unincorporated St. Louis County, Wellston, Greendale, Pagedale, Bel-Nor, Charlack and St. John.
What are the proposed solutions for Phase I?
- A lane reduction between Normandy Ave. and the St. Louis City limits to increase safety of all modes of travel
- Pavement resurfacing and new pavement markings along the corridor
- Upgrading the existing sidewalk to meet ADA requirements
- Adding sidewalks along the corridor to accommodate pedestrians along St. Charles Rock Road.
- Improve signalized intersections from I-170 to Kienlen Avenue
- Adding mid-block pedestrian crossings along the corridor
- Drainage system improvements
- Adding dedicated bike lanes throughout most of the corridor
PHASE 2 DETAILS (Complete)
Phase II of the project focuses on St. Charles Rock Road from I-170 to west of I-270. The project will propose improvements along the corridor through the following communities: St. John, Breckenridge Hills, St. Ann and Bridgeton.
What are the proposed solutions for Phase II?
- Pavement resurfacing with new striping along the corridor
- Upgrading the existing sidewalks to meet ADA requirements
- Improving aging traffic signals at various intersections
St. Charles Rock Road (Route 180) Phase I Project Maps
St. Charles Rock Road (Route 180) Phase II Project Maps
Phase I Route 180 Construction Pictures
What company will be completing the construction?
N. B. West Construction
What is the cost of this project?
This project is estimated at $10.2 million.