Project Plans
- I-70 Typical Section (Urban & Rural)
- I-70 Maintenance of Traffic
- U.S. 40 and I-70 Interchange (Midway)
- Stadium Blvd. and I-70 Interchange
- Providence Rd. and I-70 Interchange
- Rangeline St. and I-70 Interchange
- Paris Rd. and Business Loop 70 Intersection
- Heriford Rd. Connection to Collector Distributor Road
- U.S. Route 63 and I-70 Interchange
Construction Segments & Schedule
Each of these displays highlights a portion of the project limits. To see a full project schedule chart, click the Total Project Schedule option.
Collector-Distributor (CD) Roads
This project includes Collector-distributor (CD) roads. CD Roads are separated from the freeway’s main driving lanes. Their primary purpose is to allow the entry and exit movements, or weaves, to occur away from the high-speed traffic on the main driving lanes. A CD Road is similar to an exit ramp, but is typically longer, and has the advantage of allowing drivers to bypass traffic signals at intersections. The collector lanes are usually separated by a barrier wall from the main driving lanes of the highway.
Auxiliary Lanes
This project also includes auxiliary lanes, which connect the entrance ramp at one interchange to the exit ramp at the next interchange. The additional lane allows more space to merge onto or off of the interstate in its own lane, instead of in one of the main highway through lanes.
Collector-Distributor Road Info Video
Auxiliary Lane Info Video
Planned Improvements for Vulnerable Road Users
- U.S. 40 Interchange at Midway
- New U.S. 40 overpass with 10-foot shoulder on west side for future sidewalk connection.
- New U.S. 40 overpass with 10-foot shoulder on west side for future sidewalk connection.
- I-70 at Perche Creek
- New North and South Outer Road bridges crossing Perche Creek.
- New North and South Outer Road bridges crossing Perche Creek.
- Stadium over I-70
- New 10-foot sidewalk in center of bridge.
- Reconstructed all sidewalks tying into interchange.
- I-70 at Garth Ave.
- Reconstructed 6-foot sidewalk under I-70.
- Reconstructed 6-foot sidewalk under I-70.
- Providence Rd. over I-70
- New 6-foot sidewalk on west side of Providence Rd.
- Reconstructed 8-foot sidewalk on east side of Providence Rd.
- I-70 over Rangeline St.
- Reconstructed 6-foot sidewalk on east side of Rangeline St.
- Modified right-turn lanes at Rangeline St. ramps to improve crossing safety.
- Paris Rd., Heriford Rd., and Business Loop 70
- New 6-foot sidewalk on north side of Heriford Rd. between Burlington St. and Paris Rd.
- New crosswalk at Paris Rd. & Heriford Rd./Whitegate Rd. intersection.
- Reconstructed 6-foot sidewalk on east side of Paris. Rd. bridge over I-70.
- New pedestrian bridge over I-70 on COLT RR alignment.
- I-70 at Clark Lane
- Reconstructed sidewalk on north side of Clark Ln. from Sylvan Ln. to the Hinkson Creek bridge.