36 Bridge Rehabilitation in Livingston

The driving surface (bridge deck) of the Blackwell Creek Bridge on U.S. Route 36 in Livingston County is in poor condition.

The bridge is scheduled to be rehabilitated during the 2023 construction season.

Districts Impacted
Northwest
Counties Impacted
Livingston
Route Impacted
36
Completed

Route M Bridge Rehabilitation in Carroll

The Grand River Bridge on Carroll County Route M was built in 1983, and carries approximately 300 vehicles per day. The driving surface of the 1,620-foot long bridge needs a preventive maintenance treatment and the supporting structures are showing...

Districts Impacted
Northwest
Counties Impacted
Carroll
Route Impacted
M
Planning Phase

Route D and Truman Boulevard Bridge Rehabilitation in Cole

Completed Nov. 15, 2023

Rehabilitation work to extend the life of two bridges: Truman Boulevard over U.S. Route 50 and Cole County Route D over U.S. Route 50. Once the rehabilitation is complete, motorists will have a smoother surface on which to travel. 

Truman Boulevard...

Districts Impacted
Central
Counties Impacted
Cole
Route Impacted
D
Truman Boulevard
Completed

U.S. Route 24 Bridge Rehabilitation in Carroll

The expansion joints, driving surfaces and substructures of seven bridges along U.S. Route 24 in Carroll County are in need of rehabilitation.

Districts Impacted
Northwest
Counties Impacted
Carroll
Route Impacted
24
Completed

Route UU Bridge Rehabilitation in Carroll

The driving surfaces (bridge decks) of the Big Creek and Shootman Creek bridges on Carroll County Route UU, east of Carrollton, were in poor condition. Both bridges were striped as a one-lane bridge and the Big Creek Bridge's condition limited...

Districts Impacted
Northwest
Counties Impacted
Carroll
Route Impacted
UU
Completed

Missouri Route 6 and U.S. Route 65 Bridge Rehabilitation in Grundy

Completed 1/27/2023

The driving surface of the U.S. Route 65 bridge over Route 6 is in need of a new wearing surface. A project to complete a latex overlay is planned for the 2022 construction season.

Districts Impacted
Northwest
Counties Impacted
Grundy
Route Impacted
6
65
Completed

Northwest Missouri Design-Build Bridge Bundle

The Northwest Bridge Bundle will replace or rehabilitate 31 poor condition bridges in north central Missouri and bring them up to current standards. The majority of these bridges are on low-volume roads with less than 400 vehicles per day, though...

Districts Impacted
Northwest
Counties Impacted
Mercer
Livingston
Linn
+ 4 MORE
Route Impacted
11
129
139
36
C
+ 17 MORE
Planning Phase

Missouri Route 30 and Missouri Route 47 Bridge Rehabilitation in Franklin

MoDOT will rehabilitate and redeck bridges over Interstate 44 on Routes 30 and 47 in St. Clair, MO and replace pavement on all four ramps at the Route 47 interchange. This project is needed to replace the deteriorating bridge decks on Route 30 and...

Districts Impacted
St. Louis
Counties Impacted
Franklin
Route Impacted
30
47
In Progress

46 Bridge Rehabilitation in Nodaway

The Nodaway River Bridge on  Route 46 in Nodaway County is scheduled to be replaced in 2022. The bridge, built in 1933, is being replaced in order to bring the bridge, a nearby culvert and the surrounding guardrail up to current standards.

 

This...

Districts Impacted
Northwest
Counties Impacted
Nodaway
Route Impacted
46
Completed