Counties Impacted
Carroll
Chariton
Linn
Livingston
Mercer
Putnam
Sullivan
Project Status
Planning Phase
Route Impacted
CC
J
11
O
JJ
PP
KK
D
F
HH
WW
C
139
36
DD
K
E
129
N
M
U
T

Last updated: 5/23/2023

Northwest Bridge Bundle Logo

The Northwest Bridge Bundle will replace or rehabilitate up to 34 poor condition bridges in north central Missouri and bring them up to current standards. The majority of these bridges are on low-volume roads with less than 400 vehicles per day, though some carry a much higher traffic load. These bridges connect and serve the communities and citizens of rural northern Missouri. On average, these bridges have been in place for 71 years, with one bridge in Sullivan County reaching the 100-year mark in 2022.

 

Project Goals: 

  1. Safely deliver the project within the program budget of $30 million on or before December 31, 2026.
  2. Use innovation and practical design to maximize the number of locations to be addressed.
  3. Provide quality, low maintenance structures and roadway approaches.
  4. Minimize the traveling public’s inconvenience through diligent construction efforts, flexibility in scheduling, and proactive communication.

Project Timeline

Complete
Public Open House Meetings

Four open house public meetings were held in March. A public comment period was available through April 11, 2023. 

  • Tuesday, March 7, 2023 – Keytesville High School, Keytesville
  • Tuesday March 14, 2023 – Chillicothe High School, Chillicothe
  • Tuesday, March 21, 2023 – Milan High School, Milan
  • Tuesday, March 28, 2023 - Putnam County Library, Unionville

Click the links below to view all meeting materials: 

 Handout | Information Displays | County Map Displays 

 

Complete
Project Advertisement

Spring 2023

Complete
Request for Letters of Interest

Firms interested in receiving Northwest Bridge Bundle information sent a letter of interest to MoDOT by May 15, 2023.

Complete
Virtual Industry Meeting

The virtual industry meeting was held on May 23, 2023, at 10 a.m.

Presentation | Meeting Recording | Attendance Sheet | Q&A

In Progress
Statement of Qualification (SOQ) Shortlist

MoDOT's Northwest Bridge Bundle team will evaluate the SOQs and create a short list of teams to further develop proposals for the project. The short list will be announced in June 2023.

Not Started
Request for Proposal (RFP)

The Request for Proposals will be released in July 2023 and will be due in the Fall of 2023.

Not Started
Commission Selects Design-Build Team

After MoDOT's Northwest Bridge Bundle team scores the proposals, the Missouri Highways and Transportation Commission will award the Design-Build team contract at their December 2023 meeting to the team with the highest scoring proposal. 

Not Started
Construction

Once the Design-Build contractor is selected, a construction schedule will be developed and posted on this webpage, as well as in news releases and on social media.

Project News

  • Public invited to discuss bridge projects during final meeting

    03/27/2023

    ST. JOSEPH, Mo. – The Missouri Department of Transportation (MoDOT) is planning a project to replace or rehabilitate up to 34 poor-condition bridges in north central Missouri, bringing them up to current standards. Known as the Northwest Bridge...

  • Public invited to discuss bridge projects

    03/20/2023

    ST. JOSEPH, Mo. – The Missouri Department of Transportation (MoDOT) is planning a project to replace or rehabilitate up to 34 poor-condition bridges in north central Missouri, bringing them up to current standards. Known as the Northwest Bridge...

Northwest Bridge Bundle Map

Embed
Is Responsive
Embed Code
Webform
Sign up for email updates:
*
*
*

Project Manager

Contact Photo
Michael Marriott Northwest District Area Engineer
Michael Marriott
Title
Area Engineer
Department
Northwest District
Contact Info

Counties: Caldwell, Carroll, Chariton, Daviess, Grundy, Harrison, Linn, Livingston, Mercer, Putnam, Sullivan and the City of Cameron.

Email: michael.marriott@modot.mo.gov
Phone: 660-646-3218