Displaying 1031 - 1040 of 66504 results

Commission Awards Contracts for Southeast District Projects

09/04/2025

SIKESTON – The Missouri Highways and Transportation Commission awarded contracts for the Southeast District during its regular meeting on Sept. 4. The contracts included construction of a roundabout, a bridge replacement, and replacement of a low...

Route 21 in Reynolds County Reduced for Pavement Repairs

09/04/2025

SIKESTON—Route 21 in Reynolds County will be reduced as Missouri Department of Transportation crews perform pavement repairs.  

This section of roadway is located from Route 34 to Route H near Ellington, Missouri.  

Weather permitting, work will take...

Missouri Highways and Transportation Commission Meeting

Troubleshooting / Frequently Asked Questions (FAQs) Is the sound distorted or garbled?If you are using your built in computer speakers, try plugging in headphones or an external speaker.Try turning down the volume. Some of the presenters or speak...

Route N in Dunklin County Closed for Box Culvert Replacement

09/04/2025

SIKESTON― Route N in Dunklin County will be closed as contractor crews replace a box culvert.  

This section of roadway is located from County Road 541 to Route 164 near Hornersville, Missouri. 

Weather permitting, work will begin Monday, Sept. 15 at...

Pre-Bid Notices

DocumentsMeeting DateUpdated 250919-H02 Job JSE0083 Route 67 WAYNE County. Bridge replacement over Otter Creek 11 miles north of Poplar Bluff, the total length of improvement being 1.57 miles.250516 H07 JSE0083 Pre Bid Meeting Minutes PDF250516_H07_JS...

U.S. Route 50 and U.S. Route 54 Bridge Rehabilitations in Cole County

This bundle will address driving surface issues on 11 bridges in Jefferson City, including and deck repairs and overlays, as needed. Included in this project is the removal of a bridge that is no longer in use. Traffic control plans include single...

Districts Impacted
Central
Counties Impacted
Cole
Route Impacted
50
54
In Progress

Missouri Route N West Dunklin County FUTURE WORK ZONE

BRIDGE RECONSTRUCTION
Future work zone begins 0.003 mile(s) after Missouri Route 164 East
Future work zone ends 0.002 mile(s) after 659 South
Schedule from to
DISTRICT IMPACTED
Southeast
COUNTY IMPACTED
Dunklin
ROUTE IMPACTED
Missouri Route N West

Missouri Route N East Dunklin County FUTURE WORK ZONE

BRIDGE RECONSTRUCTION
Future work zone begins 0.002 mile(s) before 659 South
Future work zone ends 0.003 mile(s) before Missouri Route 164 East
Schedule from to
DISTRICT IMPACTED
Southeast
COUNTY IMPACTED
Dunklin
ROUTE IMPACTED
Missouri Route N East

Missouri Route YY North Harrison County ALL LANES CLOSED

RESURFACING PAVEMENT
Road closure begins Missouri Route 46 East
Road closure ends W 110 ST East
Schedule from to
DISTRICT IMPACTED
Northwest
COUNTY IMPACTED
Harrison
ROUTE IMPACTED
Missouri Route YY North