LPA Solicitations

To receive email notification of postings, please send an email request to CODEConsultPreq@modot.mo.gov
Link to the MoDOT Design Build Information page.  Design-Build Information

Local Program Solicitations

Statewide

NEW Posting Date Project Number Solicitation LPA Contact LPA Phone LPA Email Due Date
  1/27/21   The City of West Plains, Notice to Airport Planning/Environmental Consultants Brian Mitchell 417-256-7176 airport@westplains.net 2/24/21
  1/27/21   The City of West Plains, Notice to Airport Engineering Consultants Brian Mitchell 417-256-7176 airport@westplains.net 2/24/21
  3/2/20   Comprehensive Market Study Crystal City Port (futhttps://www.modot.org/media/add/videoure Location) Neal Breitweiser 636-232-0484 NBreitweiser@jeffcomo.org 3/15/20
  11/1/19 2019 LPA On-Call Solicitation

 

Missouri’s Local Program representatives request the services of consulting firms to perform on-call professional services

 

Laura Ellen

Rod Braman

314-275-1542

573-526-1862

Laura.Ellen@modot.mo.gov

 

Rodney.Braman@modot.mo.gov

12/13/19
  10/25/19 WCI20000121 New Bourbon Regional Port Authority, New Mooring Cell in Harbor, Winch System, and Related Improvements Margaret Yates 573-547-8357 myates@semorpc.org 11/11/19
  10/9/19 WCI20000121 New Bourbon Regional Port Authority, New Mooring Cell in Harbor, winch system, and related improvements    Margaret Yates 573-547-8357 myates@semorpc.org 10/25/19

 

Aviation
New Posting Posting Date Project Number Solicitation LPA Contact LPA Phone LPA Email Due Date
NEW 2/26/21   City of Eldon, Notice to Airport Engineering Consultants Don Smith 573-392-2291   3/5/21
  2/4/21   Mexico, MO, Mexico Memorial Airport  (MYJ), Airfield Development, engineering, design, bidding, construction services and incidental special services.  Russell Runge 573-581-2100

rrunge@mexicomissouri.org

2/19/21
  8/18/20   Nevada Municipal Airport, AIRPORT PLANNING/ENVIRONMENTAL CONSULTANTS Randy Marti 417-448-5504 rmarti@nevadamo.gov 9/30/20
  8/18/20   Nevada Municipal Airport, AIRPORT ENGINEERING CONSULTANTS Randy Marti 417-448-5504 rmarti@nevadamo.gov 9/30/20
  6/25/20   City of Butler, Butler Municipal Airport, Airfield Development Projects Michael West 660-679-4013   8/7/20
  6/25/20   City of Butler, Butler Municipal Airport, Planning and Environmental Consultants Michael West 660-679-4013   8/7/20
  6/25/20   City of Butler, Butler Municipal Airport, Airfield Development Projects Michael West 660-679-4013   8/7/20
  6/23/20   Cameron, Cameron Memorial Airport (EZZ), RFQ  Engineering Services Drew Bontrager (816)-632-2177   7/22/20
  6/23/20   Cameron, Cameron Memorial Airport (EZZ), RFQ  Planning and Environmental Services Drew Bontrager

(816)-632-2177

  7/22/20
  6/4/20   Spirit of St. Louis Airport, Chesterfield Missouri, Taxiway Alpha Pavement Rehabilitation Robert S. Heine, P.E. 314-220-2189 Rheine@stlouisco.com 7/15/20
ADDENDUM1 6/16/20   Spirit of St. Louis Airport, Chesterfield Missouri, Taxiway Alpha Pavement Rehabilitation Addendum 1       7/15/20
  5/11/20   City of Lee Summit, Request for On-Call Engineering Services for the Lee's Summit Municipal Airport Bob Hartnett 1-816-969-1800 bob.hartnett@cityofLS.net 6/5/20
  1/17/20   City of Macon, Macon Fower Memorial Airport, Airfield Development Projects, Airport Planning and Environmental Consultants Mary Lou Craigg, City Clerk 660-385-6421   2/18/20
  1/17/20   City of Macon, Macon Fower Memorial Airport, Airport Improvement Program, Airport Engineering Consultants Mary Lou Craigg, City Clerk 660-385-6421   2/18/20
  10/23/19   City of Washington, Washington Regional Airport, Engineering Consultants John Nilges 1-636-390-1010   11/14/19
  10/23/19   City of Washington, Washington Regional Airport, Planning Environmental Consultants John Nilges 1-636-390-1010   11/14/19
High Speed Rail
New Posting Posting Date Project Number Solicitation LPA Contact LPA Phone LPA Email Due Date
               

 

Northwest District:
Andrew, Atchison, Buchanan, Caldwell, Carroll, Chariton, Clinton, Daviess, DeKalb, Gentry, Grundy, Harrison, Holt, Linn, Livingston, Mercer, Nodaway, Putnam, Sullivan, Worth
New Posting Posting Date Project Number Solicitation LPA Contact LPA Phone LPA Email Due Date
  6/3/20 BRO-B041(036) Harrison County, Route 310th Place, Bridge Replacement Jack Hodge 1-660-425-6424 harrisoncounty@ymail.com 6/23/20
  7/12/19 TAP-9900(131) City of Brunswick, .5 Miles of sidewalk repair/replace and construction of crosswalk Thresa Kussman 816-589-9460 MainStreet@BrunswickMO.com 8/7/19
  6/10/19 BRO-B013(40) Caldwell County, Bridge Replacement, Cart Road 372 (John Deere Road) Bud Motsinger 1-816-586-2571 countyclerk1@gmail.com 6/21/19
Northeast District:
Adair, Audrain, Clark, Knox, Lewis, Lincoln, Macon, Marion, Monroe, Montgomery, Pike, Ralls, Randolph, Scotland, Shelby, Schuyler, Warren
New Posting Posting Date Project Number Solicitation LPA Contact LPA Phone LPA Email Due Date
  9/18/20   Marion County Port Authority, Strategic Planning and Marketing Study   573-221-1033 director@hredc.com 10/14/20
  9/1/20   Wright City, Warren County, Interstate 70 and Starks Church Road, additional interchange with I-70 Jim Schuchmann (636) 745-3101 cityadmin@wrightcity.org 9/30/20
  7/27/20 NON LPA

Adair County, Remove and Replace Bridges at Multiple Locations

**Non LPA**

Mark Shahan 660-665-2283 mshahan@adaircomo.com 8/14/20
  3/2/20  

Lewis County Requests On Call Civil and Structural Engineering

**Non LPA**

Wayne Murphy Jr. 573-767-5205 lewis@sos.mo.gov 4/13/20
  12/13/2019   CR 110, Clark County, Replace Bridge 1100037 over BNSF Railway and Approach Roadway Buddy Kattelmann 1-660-727-8241 clark.county@sos.mo.gov 01/07/2020
  8/1/19

RRP-000S(581)

Scotland County, Replace 4070007 over BNSF Railway and Approach Roadway Duane Ebeling 1-660-465-7027 Scotland@sos.mo.gov 8/14/19
 
Kansas City District:
Platte, Cass, Clay, Jackson, Johnson, Lafayette, Pettis, Ray, Saline
New Posting Posting Date Project Number Solicitation LPA Contact LPA Phone LPA Email Due Date
  11/13/20 CMAQ 3302 (424) MARC, Operation Green Light, Bi-State, Regional Project, Enhance Regional OGL Communications System Ray Webb 816-701-8358 rwebb@marc.org 12/11/20
 

7/14/20

CMAQ 3319(412)

Updated posting 11/12/20

City of Kansas City, Chouteau and I-35 Interchange

James Wang P.E.

1-816-513-7622

 

James.Wang@KCMO.ORG 11/18/20
  5/1/20

 

STP-3301 (508)

City of Kansas City, Paseo Gateway Intersection James Wang P.E. 1-816-513-7622 James.Wang@KCMO.ORG

4/15/20

5/20/20

City of Kansas City, Paseo Gateway Intersection Addendum 1
City of Kansas City, Paseo Gateway Intersection Addendum 2
City of Kansas City, Paseo Gateway Intersection Addendum 3
  3/16/20 J4S3477 J4S3347 Clay/Platte County, KC Economic Development Corporation, Interchange Improvement and bike/ped connections  Garry Hayes, 913-831-2996 garry@mdmgt.com 4/13/20
** Clay/Platte County, KC Economic Development Corporation, Interchange Improvement and bike/ped connections Addendum 1** Posted 3/30/20
  2/21/20   Pettis County, Improvements on Routes US 65, 765, H, HH and Cedar Drive, Consultant Services James Theisen 660-827-4800, Ext. 2 gis@pettiscomo.com 3/5/2020
  12/3/19 STP 3301(482) STP K921(819) Mid-America Regional Council, Operation Green Light Program, Communication Network Support Ray Webb 816-701-8358 rwebb@marc.org 1/3/2020
Addendum 1 12/24/19 STP 3301(482) STP K921(819) Mid-America Regional Council, Operation Green Light Program, Communication Network Support Addendum 1 Ray Webb 816-701-8358 rwebb@marc.org 1/3/2020
  11/18/19 STP 3301(482) STP K921(819) Mid-America Regional Council, Operation Green Light Program, for Signal Timing and Engineering Services Ray Webb 816-701-8358 rwebb@marc.org 12/13/19
  11/18/19 STP 3322(410) MoDOT Project # J4P2237 City of Grandview, I-49 Outer Roadway Conversion Design-Build Project Dennis Randolph 816-316-4855

drandolph@grandview.org

12/19/19
Clarifications 12/13/19 STP 3322(410) MoDOT Project # J4P2237 City of Grandview, I-49 Outer Roadway Conversion Design-Build Project Requests for Clarifications Dennis Randolph 816-316-4855   12/19/19
  12/6/19 STP 3322(410) MoDOT Project # J4P2237 City of Grandview, I-49 Outer Roadway Conversion Design-Build Project Addendum 1 Dennis Randolph 816-316-4855 drandolph@grandview.org 12/19/19
Central District:
Boone, Callaway, Camden, Cole, Cooper, Crawford, Dent, Gasconade, Howard, Laclede, Moniteau, Maries, Miller, Morgan, Osage, Phelps, Pulaski, Washington
New Posting Posting Date Project Number Solicitation LPA Contact LPA Phone LPA Email Due Date
NEW 2/22/2021 STBG-3100(526) City of Jefferson, Metropolitan Planning Organization (CAMPO), Transit Facilities Feasibility Study Leigh Ann Corrigan 573-634-6235 lcorrigan@jeffcitymo.org 3/9/21
NEW 2/23/21 TIDP 2700(509) City of Fulton, 2nd Street Bridge (No. 1555011) Kyle Bruemmer 573-592-3162 cityengineer@fultonmo.org 3/16/21

St. Louis District:
Franklin, Jefferson, St. Charles, St. Louis, St. Louis City

New Posting Posting Date Project Number Solicitation LPA Contact LPA Phone LPA Email Due Date
NEW 2/25/21   City of O' Fallon, Request for Qualifications – Lake St. Louis Blvd. Ph. 3.  **Non LPA Project** Thomas Kelley 1-636-379-5481  tjkelley@ofallon.mo.us 3/19/21
NEW 2/25/21 1483 City of University City, Stormwater Master Plan, **Non LPA Project**   1-314-505-8560 Sinan@ucitymo.org 3/16/21
NEW 2/18/21 STP-5613(609) North Hanley Road (F) Resurfacing

 

Pam Thebeau, P.E.

  PThebeau@stlouisco.com 3/16/21
NEW 2/18/21 STP-9901(659) Sulpher Spring Road Resurfacing Pam Thebeau, P.E.   PThebeau@stlouisco.com 3/16/21
NEW 2/18/21 STP-4901(647) West Florissant Avenue (A) Resurfacing Pam Thebeau, P.E.  

PThebeau@stlouisco.com

3/16/21
NEW 2/18/21 STP-1956(604), STP-5526(651), STP-9901(660) Lackland Road Resurfacing, Olive Boulevard Resurfacing, Woodson Road Resurfacing Pam Thebeau, P.E.   PThebeau@stlouisco.com 3/16/21
NEW 2/16/21 CMAQ-7304-(615) City of Wentzville, Route Z and Interstate Design Services Alice Winkelman 636-639-2026 Alice.Winkelman@Wentzvillemo.org 3/9/21
  1/21/21 STP-9901(653) City of Glendale and Kirkwood (St. Louis County), E. Essex Ave, Essex Ave Reconstruction and Sidewalk Installation Terry Jones 1-314-968-8157 tjones@glendalemo.org 2/17/21
Addendum 1 1/26/20 STP-9901(653) City of Glendale and Kirkwood (St. Louis County), E. Essex Ave, Essex Ave Reconstruction and Sidewalk Installation Addendum 1       2/17/21
  1/13/21 STP- 9901-(663) City of St. Louis, Union/Lindell Bridge Over Forest Park Parkway and Metrolink Reconstruction Helen Bryant Fax: 314-622-4028

BryantH@stlouis-mo.gov

Please reference project name in subject line.

2/18/21
  1/12/21  

Terminal Railroad Association of St. Louis Request for Proposal On-Call Construction Materials Testing and QA  Audit

Eric Fields 618-451-8428

efields@terminalrailroad.com

1/28/21
  1/12/21   Statement of Qualification On-Call Structural Steel Fabrication Inspection Services Eric Fields 618-451-8428 efields@terminalrailroad.com 1/28/21
  12/11/20 STP-5502(610) SL District, City of Kirkwood (St. Louis County Route: West Essex Ave David Wiedler 314-822-8550   1/12/21
  12/10/20 CMAQ-5529(615) SL District, City of Ladue, Warson Road at Conway Road - Traffic Signal and Intersection Improvements Anne Lamitola PE 1-314-993-5665 alamitola@cityofladue-mo.gov 1/5/21
  11/10/20 STP-5403(695) SL District, Jefferson County Department of Public Works, Allen Road Bridge Over Sandy Creek Daniel Naunheim 636-797-5569 dnaunheim@jeffcomo.org 12/18/20
  10/28/20 CMAQ-5456(617) SL District, Increase Ridership on the St. Louis Transit System Kimberly Cella 314-231-7272 kcella@cmt-stl.org info@cmt-stl.org 11/12/20
  10/28/20 STP-5410(633) SL District, City of Sunset Hills, West Watson Road, Resurfacing, Shared Use Path/Sidewalk and Shared-use Path Crossing with RRFB Bryson E. Baker 1-314-849-3400 bbaker@sunset-hills.com 12/18/20
  10/23/20 STP-5403 (697) SL District, Jefferson County, South Jefferson County Bridge Replacement Program Dan Naunheim 1-636-797-5569 dnaunheim@jeffcomo.org 11/30/20
  10/16/20 STP-5526(649) SL District, City of Creve Coeur, Intersection of Lindbergh Boulevard at Old Olive Street Road, Reconfiguring the intersection Matt Wohlberg, P.E. 1-314-442-2084 mwohlberg@crevecoeurmo.gov 11/6/20
  9/28/20 STP-5403(696) SL District, Jefferson County, Hunning Road Safety Improvement Project Jason Jonas 1-636-797-5369 jjonas@jeffcomo.org 10/30/20
  8/27/20 on projects to let by others STP-7305(619)     bids@stpetersmo.net 9/18/20
  9/11/20 STP-7304(613) City of Wentzville, Improvements to West Pearce Blvd. (I-70 NOR), 2' Aggregate Pavement Edge Treatment, Resurfacing, Guardrail Replacement and Fencing Alice Winkelman 636-639-2026 Alice.Winkelman@Wentzvillemo.org 10/2/20

Addendum 1 posted 9/18/20

Addendum 2 posted 9/18/20

  9/9/20 STP-7304(612) City of Wentzville, Peine Road - Stewart Springs Drive to Forest Way Drive Alice Winkelman 636-639-2026 Alice.Winkelman@Wentzvillemo.org 9/25/20

Addendum 1  posted 9/18/20

Addendum 2 posted 9/18/20

  9/9/20 STP 5419(613) City of Pacific, Preliminary Engineering and Construction Inspection Services Highway N phase 4 Improvements Steve Roth 636-271-0500 ex 213 sroth@pacificmissouri.com 9/28/20
  9/8/20   Terminal Railroad Association of St. Louis (TRRA), Replace the Mac Arthur Bridge Truss, over South Broadway, in St. Louis MO

Eric Fields

618-451-8428 efields@terminalrailroad.com 9/29/20
Addendum 1 9/15/20   Addendum #1

ftp://trra-ftp2.terminalrailroad.com

User ID: contractor

Password: C0ntr@ctor

If you cannot get the page to load please call Eric Fields at 1-618-451-8428.

Short List

Goodwin Brothers

Millstone Weber

       
  8/13/20 CMAQ-5414(634) St. Charles County, Gateway Green Light (GGL) Phase 6 PE Package A Assisting in System Operations, Maintenances, and Management of the GGL Kurt Mandernach   kmandernach@sccmo.org 9/3/20
Addendum 1 8/28/20 Addendum 1 St. Charles County, Gateway Green Light (GGL) Phase 6 PE Package A Assisting in System Operations, Maintenances, and Management of the GGL
Addendum 2 8/28/20 Addendum 2 St. Charles County, Gateway Green Light (GGL) Phase 6 PE Package A Assisting in System Operations, Maintenances, and Management of the GGL
Addendum 3 9/4/20   Addendum 3 St. Charles County, Gateway Green Light (GGL) Phase 6 PE Package A Assisting in System Operations, Maintenances, and Management of the GGL        
  8/12/20 CMAQ-5414(634)

St. Charles County, Gateway Green Light (GGL)https://www.modot.org/media/add/image Phase 6 PE Package C Implementation of Emergency Vehicle Preemption

Kurt Mandernach   kmandernach@sccmo.org 9/10/20
**Addendum 1 St. Charles County, Gateway Green Light (GGL) Phase 6 PE Package C Implementation of Emergency Vehicle Preemption **Posted 8/17/20**
  7/21/20 STP 5532(611) Town & Country, Topping Road Resurfacing & Pedestrian Improvements, Topping Road Timothy Randick   randickt@town-and-country.org 8/19/20
  6/29/20 CMAQ-5414(637) St. Charles County, Gateway Green Light (GGL) Signal Optimization Kurt Mandernach   kmandernach@sccmo.org 7/21/20
  6/1/20 STP-5574(606) Saint Louis County, Mason Road Resurfacing and Multi-Use Trail Kori Neely, P.E.   Kneely@stlouisco.com 6/16/20
  5/4/20 STP-4989(615)

City of Fenton, Larkin Williams Road, Roadway Improvements      This posting has the wrong date

Matthew Budd 1-636-8155 mbudd@fentonmo.org 5/26/20
City of Fenton, Larkin Williams Road, Roadway Improvements, Updated to correct date on the RFQ letter
  4/1/20 STP-7302(682) City of Dardenne Prairie, Stump Road Luke Kehoe P.E. 1-636-561-1718 x7 engineer@dardenneprairie.org 4/27/20
  3/25/20 STP 5613(608) City of Dardenne Prairie, Hanley Road Reconstruction and Improvements Luke Kehoe P.E. 636-561-1718 x7 engineer@dardenneprairie.org 4/20/20
**Addendum 1 City of Dardenne Prairie, Hanley Road Reconstruction and Improvements** Posted 4/1/2020**
  3/13/20 STP-6006(604) Franklin County, Elmont Road Bridge Replacement Ronald Williams P.E. 1-636-583-6361

rjwilliams@franklinmo.net

4/2/20
Addendum 1 Franklin County Elmont Road Bridge Replacement **Posted 3/25/20**
  3/12/20 STP 5622(602) City of Florissant, Improvement of Rue St Denis Street - St Ferdinand St to N Lafayette St Roadway reconstruction including installation of storm sewers, sidewalks and crosswalks Thomas Goldkamp 1-314-839-7643 tgoldkamp@florissantmo.com 4/8/20

**Addendum 1 posted 3/25/20**

City of Florissant, Improvement of Rue St Denis Street - St Ferdinand St to N Lafayette St Roadway reconstruction including installation of storm sewers, sidewalks and crosswalks Addendum 1

  3/12/20 CMAQ-5456(617) Citizens for Modern Transit (CMT) requesting the services for a graphics design firm Kimberly Cella 314-231-7272 kcella@cmt-stl.org info@cmt-stl.org 3/31/20
  1/29/20 STP-5536(613) City of Maplewood, Manchester Road - Big Bend to City Limits Anthony Traxler 314-646-3635 a-traxler@cityofmaplewood.com 2/28/20
  1/28/20 STP-5627-(605) City of Ladue Department of Public Works, Dielman Road Improvements: Sidewalk and Resurfacing Anne Lamitola, PE 314-993-5665 alamitola@cityofladue-mo.gov 2/19/20
  1/22/20 STP-5418(620) - J6S3508 City of Lake Saint Louis, Design for Old Highway N - Phase 2 Terry Rigdon 1-636-695-4221 trigdon@lakesaintlouis.com 2/13/20
  1/14/20 STP-5408(608) City of Hazelwood, Phantom Drive, reconstruction of Phantom Drive between Missouri Bottom Road and James S. McDonnell Boulevard Nikki Miller 314-513-5031 mmmiller@hazelwoodmo.org 2/5/2020
  1/14/20 J5S3509 STP-7302(684) City of O-Fallon and St. Charles County, Route DD from the intersection of Winghaven Boulevard and Technology Drive to approximately 1,100 feet east of Castlewood Estates Drive Jeff Schuepfer 636-379-5491 jschuepfer@ofallon.mo.us 1/24/2020
  1/9/2020 CMAQ-5456(617) Moving the Right Way Ridership Program Kimberly Cella 314-231-7272 kcella@cmt-stl.org info@cmt-stl.org 1/24/2020
Addendum 1 1/22/20 CMAQ-4556(617) Moving the Right Way Ridership Program Addendum 1 Kimberly Cella 314-231-7272 kcella@cmt-stl.org info@cmt'stl.org 1/24/2020
  1/8/2020 STP-5461(611) Jefferson County, Old Lemay Ferry Road, Safety Improvements Jason Jonas 636-797-5369 jjonas@jeffcomo.org 2/7/2020
  1/3/2020 STP-5583(607) City of Ferguson, Florissant Road, Resurfacing Florissant Road from Thoroughman Avenue to Woodstock Avenue Matthew Unrein 314-524-4724 munrein@fergusoncity.com 1/10/20
Addendum 1 1/7/2020   City of Ferguson, Florissant Road, Addendum 1, Changed the due date 1/17/20 Mathew Unrein 314-524-4724 munrein@fergusoncity.com 1/17/2020
  1/3/2020 STP-5583(608) City of Ferguson, Frost Avenue, Resurfacing Frost Avenue From Ford Drive to Florissant Road Matthew Unrein 314-524-4724 munrein@fergusoncity.com 1/10/20
Addendum 1 1/7/2020   City of Ferguson, Frost Avenue, Addendum 1, changed the due date to 1/17/20 Matthew Unrein 314-524-4724 munrein@fergusoncity.com 1/17/2020
  12/11/19 STP-7302(675) City of O'Fallon, Main St. Phase I Project, Roadway Resurfacing, Sidewalk/Pedestrian Improvements to Meet ADA Compliance Anthony Friedman, Ph.D., P.E. 636-379-5492 tfriedman@ofallon.mo.us 12/30/19
  12/10/19 CMAQ 9901(656) City of St. Louis, Traffic Management Enhancements Phase 4,

Goodfellow Boulevard Corridor, from Delmar Boulevard to the Halls Ferry Circle

Helen Brryant 314-622-4028 BryantH@stlouis-mo.gov 1/10/2020
  12/9/19 STP 9901 (651) City of Valley Park, St. Louis Avenue Improvement Phase 3 Gerald Martin 636-225-5171 gmartin@valleyparkmo.org 12/24/19
  11/18/19 CMAQ 5555(615) City of Des Peres, Des Peres Road, Roundabout Including Approaches, Sidewalks, Crosswalks, Ect. Steve Meyer 314-835-6130 smeyer@desperesmo.org 12/11/19
  11/8/19 STP-5419(612) City of Pacific, Denton Road over Brush Creek, Replacement of existing bridge; realignment of existing roadway Steve Roth 1-636-271-0500 ext 213 sroth@pacificmissouri.com 12/2/19

Southwest District:
Barry, Barton, Bates, Benton, Cedar, Christian, Dade, Dallas, Greene, Henry, Hickory, Jasper, Lawrence, McDonald, Newton, Polk, St. Clair, Stone, Taney, Vernon, Webster

New Posting Posting Date Project Number Solicitation LPA Contact LPA Phone LPA Email Due Date
NEW 2/24/21 STBG-9901(833) City of Nixa,  Engineered Plan Preparation for North Street Travis Cossey, Asst. Director Nixa Utilities & Public Works 417-725-2353

tcossey@nixa.com

 

3/12/21
  12/22/20 STP-5903(803) City of Springfield Public Works, Jefferson Avenue and Commercial Street, Rehabilitation of the Jefferson Avenue Footbridge Andrew Flippin

417-864-1946

aflippin@springfieldmo.gov

1/8/21
  12/7/20 RRP-000S(628) City of Monett, Chapell Drive Grade Separated Structure over the BNSF Railroad Dennis Pyle   dpyle@cityofmonett.com 12/22/20
  7/28/20 STBG 6900(813) City of Republic, Elm Street/Farm Road 182, Design and Engineering for 10ft Asphalt Trail/Side Path Garrett Brickner 1-417-732-3405 Gbrickner@repubicmo.com 8/17/20
  5/10/20 BUILD-5901(816) City of Springfield Public Works, Grant Avenue Parkway Project Leree Reese 417-864-2069 lreese@springfieldmo.gov 6/8/20
Southeast District:
Bollinger, Butler, Cape Girardeau, Carter, Douglas, Dunklin, Howell, Iron, Madison, Mississippi, New Madrid, Oregon, Ozark, Scott, Pemiscot, Perry, Reynolds, Ripley, Shannon, St. Genevieve, St. Francois, Stoddard, Texas, Wayne, Wright
New Posting Posting Date Project Number Solicitation LPA Contact LPA Phone LPA Email Due Date