REMINDER: The media is invited a groundbreaking ceremony celebrating the start of construction for Improve I-70: Rocheport to Columbia. The event will begin at 10:30 a.m. on Thursday, May 7, at the north parking lot of the former Ellis Fischel Cancer...
REVISED: CASS COUNTY- The Missouri Department of Transportation will conduct overnight lane closures on I-49 for pavement work. All work is weather permitting. See below for traffic modifications:
Friday, May 8 until Sunday, May 10 between 7 p.m. and...
JACKSON COUNTY - The Missouri Department of Transportation will conduct overnight lane and ramp closures on Interstate 49 near Missouri Route 150 for pavement work. All work is weather permitting. See below for traffic modifications:
EXTENDED...
CASS COUNTY- The Missouri Department of Transportation will conduct overnight lane closures on I-49 for pavement work. All work is weather permitting. See below for traffic modifications:
Thursday, May 7 until Friday, May 8 between 7 p.m. and 6 a.m.
...
Meeting minutes from the 2012-current Missouri Highways and Transportation Commission meetings.
The public is invited to an informational meeting to learn about the conceptual study of U.S. Route 63 corridor improvements in Schuyler and Adair counties, located between the Iowa state line and Kirksville.
This study will evaluate transportation needs and potential improvement concepts for the corridor between the Missouri/Iowa state line and 2.1 miles north of Route KK south of Kirksville. This will include opportunities for passing lanes and/or shared four-lane and other roadway improvements within the 33-mile corridor.
For the convenience of the public, two public meetings are planned in Adair and Schuyler counties at the following locations:
The public is invited to an informational meeting to learn about the conceptual study of U.S. Route 63 corridor improvements in Schuyler and Adair counties, located between the Iowa state line and Kirksville.
This study will evaluate transportation needs and potential improvement concepts for the corridor between the Missouri/Iowa state line and 2.1 miles north of Route KK south of Kirksville. This will include opportunities for passing lanes and/or shared four-lane and other roadway improvements within the 33-mile corridor.
For the convenience of the public, two public meetings are planned in Adair and Schuyler counties at the following locations:
A public comment form will open May 12, 2026 through May 25, 2026. Public comments will only be accepted during this time.
The public is invited to an informational meeting to learn about the conceptual study of U.S. Route 63 corridor improvements in Schuyler and Adair counties, located between the Iowa state line and Kirksville.
This study will evaluate transportation needs and potential improvement concepts for the corridor between the Missouri/Iowa state line and 2.1 miles north of Route KK south of Kirksville. This will include opportunities for passing lanes and/or shared four-lane and other roadway improvements within the 33-mile corridor.
For the convenience of the public, two public meetings are planned in Adair and Schuyler counties at the following locations:
A public comment form will open May 12, 2026 through May 25, 2026. Public comments will only be accepted during this time.
A public comment form will open May 12, 2026 through May 25, 2026. Public comments will only be accepted during this time.