Displaying 2691 - 2700 of 70835 results

IN PERSON EXPIRED
MEETING DATE AND TIME
01/28/2026 AT 4:00pm – 06/01/2026 AT 6:00pm

The public is invited to attend informational meetings regarding an upcoming Truck Parking project included in MoDOT’s Statewide Improve I-70 Program on Tuesday, Jan. 27 in Concordia, and on Wednesday, Jan. 28, in Wright City. These informational meetings will highlight the needs for improved truck parking along the I-70 corridor, potential sites for these improvements, as well as highlight the procurement schedule and process. 

The meeting details and locations are:

  • Tuesday, Jan. 27, 2026, from 4 p.m. to 6 p.m. in the gymnasium of the Concordia Community Center located at 802 S. Gordon St. Concordia, MO 64020.
     
  • Wednesday, Jan. 28, 2026, from 4 p.m. to 6 p.m. in the cafeteria of Wright City Middle School located at 100 Bell Rd. Wright City, MO 63390.

Nearby residents, businesses, travelers, and the trucking industry are invited to attend to learn about and provide comments regarding the planned improvements. No formal presentation will be made. The public can attend the meetings any time between 4 and 6 p.m. The information will be the same at each meeting location. Engineers from the Missouri Department of Transportation will be present to answer questions. The information presented at the meetings will also be available on the project webpage soon. 

Route Impacted
70
Cities Impacted
Boonville , Concordia , Mineola , Odessa +1 More
Counties Impacted
Boone
Lafayette
Warren
IN PERSON EXPIRED
MEETING DATE AND TIME
02/04/2026 AT 3:00pm–5:00pm

This safety improvement project includes updating the outdated signal equipment, improving accessibility for pedestrians and enhancing efficiency. The pedestrian improvements are part of MoDOT’s initiative to bring roadway facilities into compliance with the current standards of the Americans with Disabilities Act (ADA).

The proposed project includes reconfiguring the direction of parking and traffic on the west side of the Dunklin County Courthouse. Currently, traffic moves in two lines to the south. The proposed project would reverse the direction to the north, and traffic would move in a single line. This would improve efficiency at the signal by allowing one less phase.

The improvements will feature a crossing in front of the courthouse to enhance pedestrian visibility, as foot traffic is common in this location. In addition, a larger island will be constructed southwest of the courthouse at the Route 84/Main Street intersection to help mitigate potential driver confusion.

Route Impacted
84
Main Street
Cities Impacted
Kennett
Counties Impacted
Dunklin
IN PERSON EXPIRED
MEETING DATE AND TIME
02/05/2026 AT 3:00pm–5:00pm

The project includes upgrading the traffic signal infrastructure at the U.S. 61 and Donna Drive intersection, addressing two closely spaced intersections, and providing a pedestrian crossing on U.S. 61. This will be accomplished by: 

  • Widening U.S. 61 with eastbound and westbound right turn lanes at Donna Drive
  • Replacing the Donna Drive span wire signals with mast arm mounted signals
  • Replacing lighting, signing and pavement markings
  • Converting the southern Kimbel Lane approach to a Right In/Right Out intersection
  • Providing a north-south pedestrian crossing

Ultimately, the improvements will separate slowing and turning traffic from U.S. 61 main lane traffic, provide dedicated turn lanes and a pedestrian connection, update aging traffic signals, and simplify traffic movements along this stretch of U.S. 61. 

Route Impacted
61
Cities Impacted
Jackson
Counties Impacted
Cape Girardeau
VIRTUAL EXPIRED
COMMENT PERIOD
03/04/2026–03/26/2026

The Missouri Department of Transportation plans to replace three bridges on U.S. Route 67 in Butler County.  

The projects include: 

  • Replacing the U.S. 67 bridge over Harviell Ditch between County Road 340 and County Road 352. Prior to the start of construction, the new four-lane section of Future I-57 will be completed just south of this structure. During construction, existing U.S. 67 will be closed in the vicinity of the bridge. Travelers will utilize the upgraded section of U.S. 67 during this time. 
  • Replacing the U.S. 67 bridge over Hart Ditch, located south of Route MM/County Road 350. A temporary bypass will be constructed adjacent to the existing bridge during construction.
  • Replacing the U.S. 67 bridge over Neelyville Ditch, located north of Route 142 near Neelyville, Missouri. A temporary bypass will be constructed adjacent to the existing bridge during construction.

Tentatively, the three bridges will be let in November 2026, with construction beginning as early as spring 2027. Construction will be underway for approximately four months at each structure.

Route Impacted
67
Cities Impacted
Neelyville
Counties Impacted
Butler
IN PERSON EXPIRED
MEETING DATE AND TIME
03/31/2026 AT 3:00pm–5:00pm

The environmental study examined options for increasing capacity, as well as the impact of those options, for the 20-mile section of U.S. 412 extending from Route AC near the Arkansas border to just east of Route Y near Kennett, Missouri.

After extensive review, two alternatives for increasing capacity were identified. During the public hearing, the preferred alternative of a four-lane undivided highway with a flush median will be shared. The preferred alternative includes an additional lane for turning traffic at intersections (5-lane with two-way left turn lane at intersections). Funding has not been secured for construction at this time.

The EA under the National Environmental Policy Act (NEPA), evaluated potential impacts the proposed transportation improvements could have on the project area. The study balances the need to improve the roadway with several community goals. The EA is now available for review on the project webpage:  modot.org/412. An online comment form is also available via the project webpage. Comments will be accepted through Tuesday, April 21, 2026.

Route Impacted
412
Counties Impacted
Dunklin
IN PERSON EXPIRED
MEETING DATE AND TIME
03/26/2026 AT 4:30am–6:00pm

This is a come-and-go style meeting with no formal presentation. If you cannot attend, please review the project information and complete the comment form below by April 9.

Route Impacted
44
Cities Impacted
Joplin
Counties Impacted
Newton
VIRTUAL EXPIRED
COMMENT PERIOD
03/04/2026–04/03/2026

The Missouri Department of Transportation (MoDOT) is hosting a virtual public meeting to gather input from the public on the draft Long-Range Transportation Plan (LRTP) and State Freight and Rail Plan (SFRP) updates. 

Draft documents for both plans are available for public comment as part of the virtual public meeting through 5:00 p.m. Friday, April 3, 2026.

IN PERSON EXPIRED
MEETING DATE AND TIME
04/09/2026 AT 4:30pm–6:30pm

The Missouri Department of Transportation Kansas City (MoDOT KC) will hold an open house style meeting to discuss the upcoming 291 River Bridge Design-Build Project. The project will include replacement of the northbound bridge and rehabilitation of the southbound bridge. The northbound bridge has been in use since 1949 and while safe, it is scheduled to be replaced to meet current design standards. The southbound bridge was built in 2001 and is scheduled for improvements. This project will address the condition of the northbound bridge and provide maintenance on the southbound bridge.

The Missouri Department of Transportation invites you to an upcoming public information meeting to learn more about traffic impacts associated with the upcoming design-build project.

The public meeting will be held Thursday, April 9 at the Mike Onka Memorial Building, 11520 Putnam Street, Sugar Creek, MO 64054. It will be an open-house meeting with no formal presentation. You can stop by the meeting anytime between 4:30 and 6:30 p.m. to ask questions and learn more about the project. Stay up to date with the project at 291 River Bridge Design-Build Project | Missouri Department of Transportation.

MoDOT is committed to providing equal access to this event for all participants. If you require translation services or need special assistance for the meeting, please contact the team by April 2, at kccr@modot.mo.gov.

For those unable to attend the meeting or access the project information online, project materials are available by request at the MoDOT district office located at 600 NE Colbern Rd. in Lee’s Summit, MO. Customers may contact Project Director James Pflum at james.pflum@modot.mo.gov.

Route Impacted
291
Cities Impacted
Independence , Sugar Creek
Counties Impacted
Clay
Jackson
IN PERSON EXPIRED

The meeting will focus on a three-mile section of I-270 in north St. Louis County, with projects that were not included in either the I-270 North Project or the Chain of Rocks Bridge rebuild.  Planned improvements include the rehabilitation or replacement of several bridges, the expansion of lanes on I-270, resurfacing, and signal and ADA (Americans with Disabilities Act) improvements at the Lilac and Bellefontaine interchanges.

Route Impacted
270
Cities Impacted
Bellefontaine Neighbors , Riverview , Spanish Lake
Counties Impacted
St. Louis
IN PERSON EXPIRED
MEETING DATE AND TIME
04/30/2026 AT 4:00pm–7:00pm

Interstate 64 in this area has aged. Like the portion of interstate to the west between Spoede and Kingshighway completed in 2010, much of the roadway needs to be rebuilt to keep it in good working condition. This includes major work on nine bridges, including in both directions over Vandeventer. The eastbound interstate bridge has reached the end of its useful life and needs to be replaced, while the westbound bridge is scheduled for significant rehabilitation.   Plans currently include closing eastbound I-64 over Vandeventer for roughly a year to remove and replace the bridge, with rehabilitation work planned for the westbound bridge mostly after the eastbound work is complete. Traffic will be detoured onto city streets. Since the interstate over Vandeventer will be closed, and traffic detoured on Vandeventer and Forest Park Avenue, MoDOT also plans to work with partners to make improvements around the Grand interchange with eastbound I-64.

Route Impacted
64
Cities Impacted
St. Louis