Jasper & Newton Counties – Those interested in a planning study for the Missouri Routes 171/249 corridor and the Joplin West Corridor are invited to attend one of two public meetings on Tuesday, July 21 or Thursday, July 23, the Missouri Department...
The Caldwell County Route U bridge over Tom Creek was built in 1958 and carries approximately 196 vehicles per day. MoDOT is designing a project to replace the bridge, rebuild the approaches and install guardrail.
Where:
The deck of the Caldwell County Route 116 bridge over the UP Railroad, located between Polo and Cowgill, was in poor condition. A project in spring of 2023 replaced the bridge deck and brought the bridge railing up to current standards.
Joplin – A project to make pavement, sidewalk, traffic and safety improvements along Missouri Route 66 (7th Street) in Joplin is underway. Here is an update of the work scheduled for the week of July 13.
Work scheduled:
SIKESTON – Interstate 55 in Pemiscot County will be reduced to one lane with a 10-foot width restriction as Missouri Department of Transportation crews perform bridge maintenance.
This section of roadway is located from mile marker 16 to mile...
The Gene Field Road Bridge over Interstate 29 in St. Joseph carries approximately 6,500 vehicles per day. The current bridge was built in 1962 and is scheduled to be replaced in 2026. The new bridge will include a decorative form liner and sidewalks...
The intersection of U.S. Route 169 and Southeast Riverside Terrace in Buchanan County was identified as a safety-improvement project due to sight distance. In order to help improve sight distance, the Missouri Department of Transportation is planning...