Displaying 12391 - 12400 of 70674 results

Information on Local Bridge Program Changes

06/01/2022

Information on Local Bridge Program Changes

MoDOT has updated the process to distribute local bridge funds to a regional approach.  2022 BRO program bridge eligibility listings were recently added to the MoDOT website.  We recommend that local...

Changes to the BRO Program

08/13/2021

Beginning October 2021, the BRO program will transition the eligible bridges for funding, along with the distribution of funds, from deficient to poor.  This change is intended to focus the limited funds available on bridges needing the most...

Route 95 in Wright County Reduced for Erosion Work

06/20/2023

SIKESTON – Route 95 in Wright County will be reduced to one lane with a 10-foot width restriction as contractor crews perform erosion work. 

This section of roadway is located between Thornhill Drive and Elliott Road near Mountain Grove, Missouri.   ...

EB U.S. Route 60 in Howell County Reduced for Erosion Work

06/20/2023

SIKESTON – Eastbound U.S. Route 60 in Howell County will be reduced to one lane with a 12-foot width restriction as contractor crews perform erosion work. 

This section of roadway is located between Route AM and Route 76 near Willow Springs, Missouri...

Route 38 in Wright County Reduced for Erosion Work

06/20/2023

SIKESTON – Route 38 in Wright County will be reduced to one lane with a 10-foot width restriction as contractor crews perform erosion work. 

This section of roadway is located between Route 95 and Tom Creek Road near Mountain Grove, Missouri.        ...

Route Z in Wright County Reduced for Erosion Work

06/20/2023

SIKESTON – Route Z in Wright County will be reduced to one lane with a 10-foot width restriction as contractor crews perform erosion work. 

This section of roadway is located between Route 5 and Indian Grove Road near Hartville, Missouri.  

Weather...