St. Joseph, Mo. – The following is a list of general highway maintenance and construction work the Missouri Department of Transportation has planned in the Northwest Missouri region for the week of Nov. 17-23.

There may be moving operations throughout the region, in addition to the work mentioned below. Inclement weather may cause schedule changes in some of the planned work. Check the MoDOT Traveler Information Map at http://traveler.modot.org, or download the app for updated information.

MoDOT asks drivers to work with us by buckling up, putting your phone down, slowing down and moving over in work zones.

Andrew County

Interstate 29 – Narrowed to one lane in each direction at the Mill Creek Bridges, north of Exit 60 (Amazonia), for a bridge rehabilitation project through December 2025. (Contractor: Emery Sapp & Sons, Inc.)

Atchison County

Route F – CLOSED at the Rock Creek Bridge for a bridge rehabilitation project through December 2025. (Contractor: Emery Sapp & Sons, Inc.)

Route 46 – Pothole patching from U.S. Route 59 to Route EE, Nov. 10-21.

Buchanan County

Gene Field Road Bridge – CLOSED due to damage from being struck by an oversized load. The bridge is scheduled to be let for contractor bidding in the spring of 2026. https://www.modot.org/projects/gene-field-road-bridge-replacement-over-interstate-29-buchanan-county

Route 752 (Alabama Street) – CLOSED from U.S. Route 59 to Sherman Street for an intersection improvement project through 2025. (Contractor: Amino Bros. Co., Inc.) https://www.modot.org/projects/route-u-missouri-route-59-and-missouri-route-752-intersection-improvements-buchanan-county.

I-29 – Message board replacement near mile marker 40, Nov. 17-20. (Contractor: Reinhold Electric).

Caldwell County

Route D – CLOSED for a bridge replacement project at the Shoal Creek Bridge through December 2025. (Contractor: Cale Seymour Construction, LLC) https://www.modot.org/route-d-bridge-replacement-caldwell.

U.S. Route 36 – Concrete replacement westbound from Route J to Grandview Drive, Nov. 19-20. The roadway will be narrowed to one lane around-the-clock, traveling westbound.

Carroll County

Route JJ – CLOSED at the West Fork Wakenda Creek Bridge, northwest of Norborne, through mid-December 2025 for a bridge deck replacement project.(Contractor: E&C Bridge, LLC.) https://www.modot.org/projects/route-b-route-d-route-jj-and-route-kk-bridge-deck-replacement-multiple-counties

Route B – CLOSED at the Sambo Creek Bridge, beginning Nov. 17 through mid-January 2026 for a bridge deck replacement project. (Contractor: E&C Bridge, LLC.) https://www.modot.org/projects/route-b-route-d-route-jj-and-route-kk-bridge-deck-replacement-multiple-counties.

Chariton County

Route CC – CLOSED at the Yellow Creek Bridge for a replacement project through the Northwest Bridge Bundle through December 2025. (Contractor: Capital-Horner & Shifrin) *1

Route PP – CLOSED at the Mid-Fork Chariton River Bridge and Chariton River Overflow Bridge for replacement projects through the Northwest Bridge Bundle through March 2026. (Capital-Horner & Shifrin) *1

Route KK – CLOSED at the Puzzle Creek Bridge for a replacement project through the Northwest Bridge Bundle through mid-March 2026. (Capital-Horner & Shifrin) *1

Clinton County

I-35 – Concrete replacement southbound at the 49-mile marker, Nov. 17-19. The roadway will be narrowed to one lane around-the-clock, traveling southbound.

Route A – CLOSED around-the-clock for utilities permit/gas main repair at 284th Street, Nov. 17-20.

Daviess County

Route 190 – CLOSED for a bridge replacement project at the Clear Creek Bridge, north of Lock Springs, through November 2025. A detour is in place directing motorists to use U.S. Route 65 and Missouri Route 6 around the closure. (Contractor: Capital Paving & Construction, LLC.) https://www.modot.org/projects/missouri-route-190-bridge-replacement-daviess-county

Route 13 – CLOSED for pavement repair from Rustic Avenue to Route HH, Nov. 19, 8 a.m. to 4 p.m.

Grundy County

Route 6 – Concrete replacement from 62nd Avenue to 20th Street, Nov. 17-21. The road will be narrowed to one lane around-the-clock.

Harrison County

Route N – CLOSED at the bridge over Interstate 35 near Eagleville for a bridge deck replacement through early December 2025 (Contractor: Capital Paving & Construction, LLC.) https://www.modot.org/projects/missouri-route-6-and-route-n-bridge-rehabilitation-over-interstate-35-daviess-and-harrison.

Route W – CLOSED for a culvert replacement from 220th Street to Falcon Road, Nov. 17-18, 7 a.m. to 3:30 p.m. daily.

Route W – CLOSED for a culvert replacement from 200th Street to 190th Street, Nov. 19, 7 a.m. to 3:30 p.m.

Route W – CLOSED for a culvert replacement from 180th Street to Route M, Nov. 19, 7 a.m. to 3:30 p.m.

Linn County

Route M – CLOSED for a culvert replacement from Route C to Hollow Road, Nov. 17, 8 a.m. to 3 p.m.

Route 139 – CLOSED for a culvert replacement from Argo Road to Brook Road, Nov. 18, 7 a.m. to 3 p.m.

Livingston County

Route D – CLOSED at the Shoal Creek Drainage Ditch bridge, south of Ludlow, for a bridge deck replacement project through early December 2025. (Contractor: E&C Bridge, LLC.) https://www.modot.org/projects/route-b-route-d-route-jj-and-route-kk-bridge-deck-replacement-multiple-counties

Route W – CLOSED for a culvert replacement from County Road 500 to County Road 502, Nov. 19, 7 a.m. to 3:30 p.m.

Mercer County

U.S. Route 136 – Bridge maintenance at the Weldon River Bridge, Nov. 17-20, 8 a.m. to 2 p.m. daily. The bridge will be narrowed to one lane during working hours, with temporary traffic signals in place to guide motorists through the work zone.

Route A – Scrub seal project, Nov. 17-21. The roadway may be narrowed to one lane with a pilot car directing motorists through the work zone. (Contractor: Vance Brothers, Inc.).

Nodaway County

Route NN – CLOSED for resurfacing project, Nov. 10-21. (Contractor: Above & Below Contracting, LLC.)

Route EE – CLOSED for a culvert replacement from 230th Street to 240th Street, Nov. 17-18, 7 a.m. to 3 p.m. daily

Sullivan County

Route T – CLOSED at the East Locust Creek bridge due to deterioration. The bridge is scheduled to be replaced in the spring of 2026 through the Northwest Bridge Bundle. https://www.modot.org/projects/northwest-missouri-design-build-bridge-bundle

Worth County

U.S. Route 169 – CLOSED for a bridge deck replacement project at the Middle Fork Grand River Bridge through October 2025. (Contractor: Capital Paving & Construction, LLC.) https://www.modot.org/projects/us-route-169-route-b-and-route-m-bridge-rehabilitation-gentry-and-worth.

Route W – CLOSED for a bridge replacement at the West Fork Grand River Bridge through December 2025. (Contractor: Emery Sapp & Sons, Inc.) https://www.modot.org/projects/missouri-route-46-and-route-w-bridge-replacement-worth

---

*1 This bridge is part of the NWBB (Northwest Bridge Bundle) program. The design-build team is Capital-Horner & Shifrin. More info: NWBB program web page.

*2 In 2024, the Governor signed the Fiscal Year 2025 budget, including an additional $100 million to continue low-volume road improvements. This funding will be used to improve conditions on 1,985 lane miles of rural roads at 149 locations, including the ones listed below. For more information on the Governor’s Rural Roads Program, visit Governor's Rural Roads Program | Missouri Department of Transportation (modot.org)

 

###

Districts Involved
Northwest
MODOT Newsroom

The newsroom is a one-stop shop for media partners to find their local and statewide communications contacts and news releases, as well as download department leadership portraits and other media.

Visit the Newsroom
Media Inquiries
Real Time Traffic

Monitor real time traffic with our online traffic map.