Counties Impacted
Daviess
Harrison
Route Impacted
6
N
Work Type
Bridge Rehabilitation
Highway Feature
Interstate 35
Planning Phase

Project Summary

The driving surfaces on the Harrison County Route N bridge over Interstate 35 and the Daviess County Route 6 bridge over I-35 are in poor condition and need extensive patching.

The Harrison County Route N bridge was built in 1968 and carries approximately 982 vehicles per day.

The Daviess County Route 6 was built in 1968 and carries approximately 793 vehicles per day.

Benesch, working with MoDOT, is designing a project to replace the bridge deck on both bridges over I-35.

Project Progress

Complete
Planning, Design and Right of Way Acquisition Phase

MoDOT and consultants from Benesch are working to design a bridge rehabilitation project for the bridges on Route 6 in Daviess County and Route N in Harrison County, both of which are over Interstate 35.

milestone_icon
Complete
Public Input Opportunity
MoDOT will offer the below opportunities to receive community feedback regarding the bridge rehabilitation project.

There will be two public meetings to discuss this project.

  1. Tuesday, May 14, 2024, at the Eagleville Event Center (11049 11th Street, Eagleville, MO) from 4 to 6 p.m.
  2. Tuesday, May 21, 2024, at the Gallatin High School library (602 S. Olive Street, Gallatin, MO) from 4 to 6 p.m.

These will be open house style meetings and community members are welcome to stop by anytime between 4 - 6 p.m. to speak with project experts and provide feedback. No formal presentation will be made and the information for this project will be the same at each meeting.

If you are unable to attend a meeting, you may leave feedback in one of the two following ways.

  1. View the information on this webpage and utilize the form at the bottom of the page to submit your comments and/or sign up for project-specific updates. Comments must be submitted by June 4, 2024.
  2. Mail your comments to: 
    Route 6 and Route N bridge rehabilitation project
    Missouri Department of Transportation 
    3602 North Belt Highway
    St. Joseph, MO 64506

    All comments must be postmarked by June 4, 2024.

    We are committed to providing equal access to this event for all participants. If you need a reasonable accommodation, please contact NW District Communications at 816-901-4529 by May 10, 2024.

milestone_icon
Complete
Contract Letting, Award & Notice to Proceed

This project went out for contractor bids as part of MoDOT's November 2024 letting. During their December 2024 meeting, the Missouri Highways and Transportation Commission awarded a $2,438,950.78 contract to Capital Paving & Construction, LLC to complete the bridge rehabilitation project.

The earliest date the contractor may begin construction is Jan. 6, 2025.

 

milestone_icon
Not Started
Construction Schedule

The contractor will work with MoDOT to determine the exact schedule of work.

At this time, both roadways are expected to close during construction. The exact date of the closures and the planned reopening dates have not been determined yet. 

milestone_icon
Not Started
Project Completion

By contract, all work must be complete on or before Dec. 1, 2025.

milestone_icon

Bridge Locations

Embed
Interactive Map
Is Responsive
Embedded content may not be suitable for small screens.
Embed Code

Project News

  • Planned Roadwork for Northwest Missouri, May 5-11

    05/02/2025

    St. Joseph, Mo. – The following is a list of general highway maintenance and construction work the Missouri Department of Transportation has planned in the Northwest Missouri region for the week of May5-11.

    There also may be moving operations...

  • Planned Roadwork for Northwest Missouri, April 28-May 4

    04/25/2025

    St. Joseph, Mo. – The following is a list of general highway maintenance and construction work the Missouri Department of Transportation has planned in the Northwest Missouri region for the week of April 28-May 4.

    There also may be moving operations...

  • Planned Roadwork for Northwest Missouri, April 21-27

    04/18/2025

    Andrew County

    Interstate 29 – Resurfacing from U.S. Route 59 north of the Nodaway River to Business 71 north of St. Joseph through July 2025. (Contractor: Herzog Contracting Corp.).

    Atchison County

    Route 111 – Culvert Replacement at Kettle Avenue...

Frequently Asked Questions: 

Q: Who can I contact if I have further questions?

A: Questions may be left by calling 888 ASK MODOT (888-275-6636) or emailing nwcr@modot.mo.gov

 

Q: How can I stay updated on the project's progress?

A: Sign up for project-specific updates at the bottom of this page.

 

Q: What will the impact to traffic be?

A: Both bridges will be closed for the duration of the work and east/westbound bridge traffic will be detoured on I-35. Motorists will be directed to use the ramps at the closest interchanges immediately north and south of each bridge.

See below for the proposed detour maps.

Webform
Sign up for email updates:
*
*
*
Image
bridge side view

Need More Information?

We're here to help! If you're looking for additional information, you can contact us at: 

  • nwcr@modot.mo.gov
  • 1-888-ASK-MODOT (888 275-6636) - reference Northwest District Daviess/Harrison bridge rehabilitations over I-35
  • Sign up for eUpdates: Customer Service Signon (mo.gov)