ST. JOSEPH, Mo. – The following is a list of general highway maintenance and construction work the Missouri Department of Transportation has planned in the Northwest Missouri region for the week of Dec. 30 – Jan 5.
Though not listed below, some routes remain closed due to flooding. View all routes closed due to flooding at http://traveler.modot.org/map/.
Inclement weather may cause schedule changes in some of the planned work. There may also be moving operations throughout the region such as pothole patching, striping, signal work, etc., in addition to the work mentioned below.
Andrew County
Route U – Shoulder work at County Road 6, Dec. 30 – Jan. 3
Atchison County
Route 111 – CLOSED for a bridge replacement project at the Mill Creek Bridge near Corning. The bridge will remain closed through spring 2020.
Route T – Shoulder work from U.S. Route 275 to one mile north of U.S. Route 275, Dec. 30 – 31
Route J – Pothole patching, Dec. 30 – Jan. 3
Route TT – Shoulder work, Jan. 2 – 3
Buchanan County
Route E – CLOSED for a culvert replacement from Malden Creek Road to 95th Road SE, Jan. 2 from 8:30 a.m. to 3:30 p.m.
Caldwell County
Route P – CLOSED for a culvert replacement from Old Highway 13 to Kendal Road, Dec. 30 – 31 from 7 a.m. to 3:30 p.m. daily
Route A – CLOSED for a culvert replacement from NE Hi Point Drive to Wishbone Drive, Jan. 2 – 3 from 7 a.m. to 3:30 p.m. daily
Carroll County
Route C – CLOSED until further notice at the Branch of Turkey Creek Bridge due to damage from flooding. A project to replace the bridge is scheduled to be a part of the February 2020 letting.
Chariton County
U.S. Route 24 – Bridge replacement project at the Mussel Fork River and Overflow Bridges west of Keytesville through early 2020. Traffic is being diverted over a one-lane, signalized bypass during the replacement of the Mussel Fork River Overflow Bridge. A 10-foot width restriction is in place.
U.S. Route 24 – Bridge replacement project at the Middle Fork Chariton River and Overflow bridges through February 2020. These bridges are part of Governor Parson’s “Focus on Bridges” program. Traffic will be directed through the work zone with temporary traffic signals. A 10-foot width restriction is in place.
Daviess County
Route B – CLOSED for bridge reconstruction at the Interstate 35 overpass. The contractor is waiting on materials to complete work on the bridge. Until the work is completed, the bridge will remain closed. More info: https://www.modot.org/clinton-and-daviess-county-bridge-deck-replacements-over-i-35
Route V – CLOSED for a culvert replacement at Quarry Road, Dec. 30 from 8 a.m. to 3:30 p.m.
Harrison County
I-35 – Pothole patching from mile marker 92 (U.S. Route 136 at Bethany) to mile marker 84 (Route AA/H), Dec. 30 – Jan. 3
U.S. Route 69 – Shoulder work from Bethany to Eagleville, Dec. 30 – Jan. 3
Holt County
Route T – CLOSED until further notice at Mill Bluff Road due to roadway damage
Route 111 – Pavement repair project from Spur 111 to Route 118 through early 2020
Linn County
U.S. Route 36 – Shoulder work from Route 5 to Route F, Dec. 30 – 31
U.S. Route 36 – Pothole patching from the Macon County line to Route 139, Dec. 30 – 31
Nodaway County
Route 46 – Pothole patching from Maryville to Route 113, Dec. 30 – Jan. 3
Route 246 – Shoulder work in Hopkins, Dec. 30 – Jan. 3
Route AF – Pothole patching, Dec. 30 – Jan. 3
Sullivan County
Route PP – CLOSED until further notice at the East Medicine Creek Bridge after a regularly scheduled inspection revealed critical deterioration to the structure. The bridge is currently scheduled for replacement in fiscal year 2020. More info: https://www.modot.org/sullivan-county-route-pp-east-medicine-creek-bridge
Worth County
Route YY – CLOSED for a bridge replacement project at the Middle Fork of the Grand River. The bridge is part of Governor Parson’s “Focus on Bridges” program. The bridge will remain closed until spring 2020. More info: https://www.modot.org/worth-county-route-yy-bridge-replacement-over-middle-fork-grand-river
###