Counties Impacted
Callaway
Project Status
Planning Phase
Route Impacted
Missouri Route D

Project Milestones

Complete
Project Awarded

Winter 2019

Not Started
I-70 Closure for Construction

In order to remove the existing bridge, I-70 will need to be temporarily closed. The contractor will be allowed an 8-hour period to close I-70 for one night only. During this time, traffic will be detoured from the Routes A/Z interchange onto the I-70 North Outer Road to the Routes D/YY interchange.

Not Started
Route D Bridge Closure for Construction

Construction will take place in 2020. During construction Route D will be closed at the bridge location for up to three months. Signs will alert motorists of the closed road. Drivers are asked to seek alternate routes around the construction.

 

Not Started
Route D Bridge and Roadway Improvements Completion

The project will be completed in 2020.

What is the purpose of the online meeting?

The purpose of the online meeting is to provide information on plans to replace the bridge over I-70 on Missouri Route D, approximately 2.3 miles southwest of Williamsburg.

Why is this work necessary?

The existing bridge over I-70 was built in 1963 and is fifty-six years old. The condition of the bridge has reached a point where a bridge replacement is necessary.

How will traffic be affected?

During construction Route D will be closed at the bridge location for up to three months. Signs will alert motorists of the closed road. Drivers are asked to seek alternate routes around the construction.

In order to remove the existing bridge, I-70 will need to be temporarily closed. The contractor will be allowed an 8-hour period to close I-70 for one night only. During this time, traffic will be detoured from the Routes A/Z interchange onto the I-70 North Outer Road to the Routes D/YY interchange.

When will the work take place?

The project is scheduled to be awarded in the winter of 2019, with construction taking place in 2020.

Will additional right of way be needed to construct this project?

No additional right of way will be required for the construction of the bridge.

What will the project cost?

The total construction cost is approximately $2.1 million.