Displaying 4751 - 4760 of 70505 results

2025 Statewide Eligibility Listings for LPA Website

2025 1-NW BRO Eligible Local Agency Bridges with Construction Cost and GPS - Non-FA Routes2025 1-NW BRO Eligible Local Agency Structures List Based on Poor Condition2025 2-NE BRO Eligible Local Agency Bridges with Construction Cost and GPS - Non-FA Routes2...

NB I-55 in New Madrid County Reduced for Shoulder Repairs

12/16/2025

SIKESTON—Northbound Interstate 55 in New Madrid County will be reduced to one lane with a 12-foot width restriction as Missouri Department of Transportation crews perform shoulder repairs.  

This section of roadway is located from mile marker 50.4 to...

U.S. Route 62 in New Madrid County Reduced for Drainage Work

12/16/2025

SIKESTON—Route 62 in New Madrid County will be reduced as Missouri Department of Transportation crews perform drainage work.  

This section of roadway is located from County Road 527 to County Road 529 near Risco, Missouri.  

Weather permitting, work...

New Lenoir Street now open

12/16/2025

JEFFERSON CITY, Mo. – As part of the interchange improvements at U.S. Route 63 and Boone County Route AC (Grindstone Parkway), the new alignment of Lenoir Street is now open. Lenoir Street’s connection with New Haven Road has been moved slightly east...

Planning and Performance Support Contacts

Bootheel Regional Planning & Economic Development Commission 573-614-5178 Harry S Truman Coordinating Council 417-782-3515 Joplin Area Transportation Study Organization 417-624-0820 Kaysinger Basin Regional Planning Commission ...

U.S. Route 61 in New Madrid County Closed for Culvert Replacement

12/16/2025

SIKESTON—Route 61 in New Madrid County will be closed as Missouri Department of Transportation crews replace a culvert under the roadway.  

This section of roadway is located from Route 62 to Route D near Lilbourn, Missouri. 

Weather permitting, work...