Displaying 1901 - 1910 of 67635 results

Route 51 in Stoddard County Reduced for Bridge Maintenance

02/09/2026

SIKESTON—Route 51 in Stoddard County will be reduced to one lane with an 8-foot width restriction as Missouri Department of Transportation crews perform bridge maintenance.    

This section of roadway is located from Route DD to Route 60 in Fisk...

In Person

The project includes upgrading the traffic signal infrastructure at the U.S. 61 and Donna Drive intersection, addressing two closely spaced intersections, and providing a pedestrian crossing on U.S. 61. This will be accomplished by: 

  • Widening U.S. 61 with eastbound and westbound right turn lanes at Donna Drive
  • Replacing the Donna Drive span wire signals with mast arm mounted signals
  • Replacing lighting, signing and pavement markings
  • Converting the southern Kimbel Lane approach to a Right In/Right Out intersection
  • Providing a north-south pedestrian crossing

Ultimately, the improvements will separate slowing and turning traffic from U.S. 61 main lane traffic, provide dedicated turn lanes and a pedestrian connection, update aging traffic signals, and simplify traffic movements along this stretch of U.S. 61. 

Counties Impacted
Cape Girardeau
Route Impacted
61
MEETING DATE
02/05/2026
MEETING TIME
3 - 5 p.m.
In Person

This safety improvement project includes updating the outdated signal equipment, improving accessibility for pedestrians and enhancing efficiency. The pedestrian improvements are part of MoDOT’s initiative to bring roadway facilities into compliance with the current standards of the Americans with Disabilities Act (ADA).

The proposed project includes reconfiguring the direction of parking and traffic on the west side of the Dunklin County Courthouse. Currently, traffic moves in two lines to the south. The proposed project would reverse the direction to the north, and traffic would move in a single line. This would improve efficiency at the signal by allowing one less phase.

The improvements will feature a crossing in front of the courthouse to enhance pedestrian visibility, as foot traffic is common in this location. In addition, a larger island will be constructed southwest of the courthouse at the Route 84/Main Street intersection to help mitigate potential driver confusion.

Counties Impacted
Dunklin
Route Impacted
84
Main Street
MEETING DATE
02/04/2026
MEETING TIME
3 - 5 p.m.