Pipe Replacements to Close Howard County Roads

07/28/2017

Weather permitting, Missouri Department of Transportation crews will replace culvert pipes along two Howard County roads next week:

  • Route U between County Road 232 and County Road 247. The road will be closed from 6 a.m. until 4:30 p.m. on Tuesday...

Route 32 in Iron and Dent County Reduced For Pavement Repairs

07/28/2017

Route 32 in Iron and Dent County will be reduced with an 11 foot width restriction as contractor crews pave the roadway.

This section of roadway is located from Route KK to Route 72.

Weather permitting, work will take place Monday, Aug. 14 through...

Route H in Perry County Reduced for Pavement Repairs

07/28/2017

Route H in Perry County will be reduced with a 10 foot width restriction as contractor crews resurface and add shoulders to the roadway.

This section of roadway is located from Route 61 to Route 51.

Weather permitting, work will take place Wednesday...

Sealing Operations Will Temporarily Close Knox County Route M

07/28/2017

HANNIBAL - Weather permitting, August 10, MoDOT crews will be doing sealing work on Knox County Route M. There road will be temporarily closed from Knox County Route K to the Scotland County line for sealing operations. Work will be completed between...

Bridge Work Continues on Routes in Randolph County

07/28/2017

MACON - Weather permitting, MoDOT crews will be doing bridge work on the following routes in Randolph County. Please see the dates and locations below. All work will be completed between 6:30 a.m. and 4:30 p.m.

U.S. Route 24 - July 31, one lane...

Sealing Operations Will Temporarily Close Clark County Route A

07/28/2017

HANNIBAL - Weather permitting, August 7, MoDOT crews will be doing sealing work on Clark County Route A. There road will be temporarily closed from Clark County Route D to Missouri Route 136 for sealing operations. Work will be completed between 7:00...

Bridge Work Planned for Route in Montgomery County

07/28/2017

MACON - Weather permitting, MoDOT crews will be doing bridge work on the following routes in Montgomery County. Please see the dates and locations below. All work will be completed between 8:00 a.m. and 4:00 p.m.

Montgomery County Route ZZ - July 31...

Road Work for Mid-Missouri

07/28/2017

The following is a listing of general highway maintenance and construction work in the mid-Missouri area for the two-week period of July 31-August 11, 2017. Weather conditions may postpone the work schedule. Many projects will include lane closures...