St. Joseph, Mo. – The following is a list of general highway maintenance and construction work the Missouri Department of Transportation has planned in the Northwest Missouri region for the week of March 2-8.
There may be moving operations throughout the region, in addition to the work mentioned below. Inclement weather may cause schedule changes in some of the planned work. Check the MoDOT Traveler Information Map at http://traveler.modot.org, or download the app for updated information.
MoDOT asks drivers to work with us by buckling up, putting your phone down, slowing down and moving over in work zones.
Andrew County
U.S. Route 169 – Shoulder work from County Line Road to Route D, March 3-6.
Atchison County
U.S. Route 136 – Shoulder work from Route M to the Nodaway County line, March 2-6.
I-29 – Pavement repair, northbound at the 110 mile marker, March 4-5. The roadway will be narrowed to one lane with a 14-foot width restriction, 7 a.m. to 3 p.m. daily.
Buchanan County
Gene Field Road Bridge – CLOSED for a bridge replacement project through July 2026. https://www.modot.org/projects/gene-field-road-bridge-replacement-over-interstate-29-buchanan-county
U.S. Route 59/Route 752/Route U – Intersection improvement project through spring 2027. (Contractor: Amino Bros. Co., Inc.) https://www.modot.org/projects/route-u-missouri-route-59-and-missouri-route-752-intersection-improvements-buchanan-county.
U.S. Route 169 (Belt Highway) – Traffic signal upgrade project at Messanie Street, through March 8.
- Traffic on Messanie Street will not be able to access the Belt Highway.
- Traffic on the Belt Highway will not be able to access Messanie Street.
- Traffic will be able to continue to use the Belt Highway in both directions.
U.S. Route 169 – CLOSED for an intersection improvement project at Southeast Riverside Terrace through mid-July 2026. (Contractor: Hoy Excavating, LLC) https://www.modot.org/projects/us-route-169-intersection-improvements-buchanan-county.
Route 759 – Shoulder work from Cedar Street to Lower Lake Road, March 2-6.
Carroll County
Route 10 – Pavement repair and resurfacing project from Route FF to Route C in Ray County, March 2-May 15. The road will be narrowed to one lane with flaggers guiding motorists through the work zone. (Contractor: Emery Sapp and Sons LLC).
Chariton County
Route PP – CLOSED at the Mid-Fork Chariton River Overflow Bridge for replacement projects through the Northwest Bridge Bundle through March 2026. (Capital-Horner & Shifrin) *1
Route KK – CLOSED at the Puzzle Creek Bridge for a replacement project through the Northwest Bridge Bundle through mid-March 2026. (Capital-Horner & Shifrin) *1
Route O – CLOSED at the Bee Creek Bridge for a replacement project through the Northwest Bridge Bundle through April 2026. (Capital-Horner & Shifrin) *1
Route KK – CLOSED at the Little Chariton River Bridge for a deck replacement project through March 2026. (Contractor: E&C Bridge, LLC.) https://www.modot.org/projects/route-b-route-d-route-jj-and-route-kk-bridge-deck-replacement-multiple-counties.
Linn County
Route 11 – CLOSED at the Badger Creek Bridge, north of New Boston, for a bridge replacement project through the Northwest Bridge Bundle through May 2026. (Capital-Horner & Shifrin) *1
Route 139 - CLOSED at the Parson Creek Bridge, north of Meadville, for a bridge replacement project through the Northwest Bridge Bundle through May 2026. (Capital-Horner & Shifrin) *1
Route U – CLOSED at the Long Branch Bridge, northwest of Bucklin, beginning March 2-early May for a deck replacement project. (Contractor: Louis-Company, LLC). https://www.modot.org/projects/route-b-route-e-and-route-u-bridge-deck-replacement-grundy-and-linn-counties-0
Livingston County
Route K – CLOSED at the North Fork Crooked Creek Bridge for a bridge replacement project through the Northwest Bridge Bundle through April 2026. (Capital-Horner & Shifrin) *1
Mercer County
Route JJ – CLOSED at the West Honey Creek Bridge for a deck replacement project through early April 2026. (Contractor: E&C Bridge, LLC). https://www.modot.org/projects/route-e-route-ff-route-jj-and-route-oo-bridge-deck-replacement-multiple-counties
Route E – CLOSED at the West Honey Creek Bridge for a bridge replacement project through the Northwest Bridge Bundle through July 2026. (Capital-Horner & Shifrin)*1
Route EE – CLOSED for a culvert replacement from 190th Street to 200th Street, March 2, 7 a.m. to 3 p.m.
Route EE – CLOSED for a culvert replacement from 205th Street to 210th Street, March 3, 7 a.m. to 3 p.m.
Route EE – CLOSED for a culvert replacement from 210th Street to 220th Street, March 4, 7 a.m. to 3 p.m.
Route EE – CLOSED for a culvert replacement from 220th Street to 230th Street, March 5-6, 7 a.m. to 3 p.m. daily.
Sullivan County
Route PP – CLOSED at the West Locust Creek Bridge through June 2026, for a bridge replacement project through the Northwest Bridge Bundle through April 2026. (Capital-Horner & Shifrin) *1
Route T – CLOSED at the East Locust Creek bridge due to deterioration. The bridge is scheduled to be replaced in the spring of 2026 through the Northwest Bridge Bundle. https://www.modot.org/projects/northwest-missouri-design-build-bridge-bundle
Worth County
Route 46 – CLOSED at Marlowe Branch Creek for a bridge replacement project through May 2026. (Contractor: Emery Sapp & Sons) https://www.modot.org/projects/missouri-route-46-and-route-w-bridge-replacement-worth-county.
---
*1 This bridge is part of the NWBB (Northwest Bridge Bundle) program. The design-build team is Capital-Horner & Shifrin. More info: NWBB program web page.
###