Project Facts:
- Replace Route 123 bridge over Barren Creek
- Widen bridge to 26 feet
Construction: 2021
Estimated total project cost: $1,047,000
Bridge Facts:
- Bridge built in 1948
- Bridge carries 514 vehicles a day
- Old bridge 22 feet wide, 102.5 feet long
-
This bridge is included in Gov. Mike Parson’s $351 million Focus on Bridges program, which will repair or replace 250 bridges across the state
Traffic Impacts:
-
Route 123 CLOSED at Barren Creek for up to 3 months during construction
- Signed detour: Route 123, Route 32, Route 245, Route 215 and Route 123
Project Updates
-
MoDOT TRAFFIC ALERT: Missouri Route 123 Bridge over Barren Creek Near Fair Play is OPEN
Where: Missouri Route 123 Bridge over Barren Creek near Fair Play is OPEN to traffic
When: 2 p.m. Today, Friday, May 28
Details: Contractor crews closed the bridge the week of March 15 for a bridge replacement project. Striping, seed and mulch are...
-
MoDOT: Missouri Route 123 Bridge over Barren Creek
Polk County – The Missouri Route 123 bridge over Barren Creek near Fair Play will CLOSE the week of March 15 for a bridge replacement project, the Missouri Department of Transportation said.
The bridge replacement will requiring Route 123 to be...
-
MoDOT: Missouri Route 123 Bridge over Barren Creek Near Fair Play
Polk County – The public is invited to a virtual (online) public meeting starting Monday, August 3, to learn more about plans for replacing the Missouri Route 123 bridge over Barren Creek south of Fair Play in 2021, the Missouri Department of...