Counties Impacted
Cape Girardeau
Route Impacted
K
Work Type
Corridor Upgrades
Planning Phase

About

The purpose of the project is to improve the flow of traffic and safety along the Route K corridor in Cape Girardeau County. Traffic studies completed in 2022 and 2024 looked at the corridor from County Road 319 to 0.20 miles east of County Road 317. 

Public Meeting Held April 18, 2024

The Missouri Department of Transportation held a public meeting from 4 to 6 p.m. Thursday, April 18 to discuss plans to improve the Route K corridor in Cape Girardeau, Missouri. The meeting was held at Notre Dame High School, located at 265 Notre Dame Dr. in Cape Girardeau, Missouri. 

If you missed the public meeting, the meeting handout and exhibits are included below. In addition, comments will be accepted through May 2, 2024. The online comment form is also available in the meeting materials below.

Traffic studies completed in 2022 and 2024 looked at the corridor from County Road 319 to 0.20 miles east of County Road 317. The proposed project includes widening the roadway, adding a center turn lane and constructing a roundabout at Notre Dame Drive. Construction could begin as early as spring 2026, with completion anticipated by fall 2026. It is anticipated the route would remain open throughout all phases of construction, with minor lane shifts under flagger control. 

PROPOSED IMPROVEMENTS 

Center Two-Way Left Turn Lane

Widening the roadway to accommodate a center two-way left turn through the study area

Benefit: This will allow vehicles to safely stop in center turn lane before making a left turn, which will reduce the likelihood of rear end crash occurrences within the corridor.

Widening

Widening for an additional eastbound lane starting at Notre Dame Drive and tying into existing eastbound 5-lane section near Wal-Mart's entrance in Cape Girardeau, Missouri 

Benefit: This will help during peak times and as traffic capacity increases.

Intersection Improvements

Intersection improvements at Notre Dame Drive

Benefit: This will be completed in an effort to improve safety, address capacity needs and mitigate traffic delays during peak hours at Notre Dame Drive.

SUMMARY OF OTHER PROPOSED CORRIDOR IMPROVEMENTS

Sight Distance Design Phase Analysis Recommended

  • CR 318
  • CR 203
  • CR 317
  • Notre Dame Dr/Parkwood Lake St

Pavement Markings

  • Install stop bars on minor street approaches

Signing

  • Analysis during design to determine need for curve and intersection warning signs
  • Add advance school warning signs on Route K approaches to Notre Dame Drive and replace existing School Speed Limit signs with new, high visibility fluorescent yellow signs

Right Turn Lanes

  • Greenbriar Drive
  • CR 318
  • CR 206
  • Notre Dame Dr
  • CR 317 WB

Guardrail Design Phase Analysis Recommended

  • Curve west of Notre Dame, on the northside of Route K
  • Creek east of Notre Dame, both sides of Route K
  • Curve at CR 203, both sides of Route K

Access Management Opportunities Design Phase

  • Greenbriar Dr to S Forester Dr
  • East of CR 317/Robin Lane to Walmart entrance (eastern project limits)

Meeting Materials

Project Timeline

Completed Traffic Study

Summer 2022

milestone_icon
Conceptual Plan Approval

Fall 2022

milestone_icon
Consultant Selection for Final Phase Development

Spring-Summer 2023

milestone_icon
2024 Traffic Study and Conceptual Plan

Jan.-Feb. 2024

milestone_icon
Public Meeting

Spring 2024

 

milestone_icon
Right-of-Way

Fall 2024

milestone_icon
Tentative Project Letting

Fall 2025

milestone_icon
Construction

As early as Spring 2026

milestone_icon
Anticipated Completion

Fall 2026

milestone_icon
Webform

SHARE YOUR THOUGHTS!
Route K Corridor in Cape Girardeau

Please share your thoughts by submitting the form below. Your comments will be sent directly to the project team. Please share your thoughts by May 2, 2024. 

*
*

For More Information

Contact Photo
Tim Pickett
Tim Pickett
Title
Project Manager
Department
Southeast District
Contact Info

(573) 472-9003

Contact Photo
Chris Crocker
Chris Crocker
Title
Area Engineer
Department
Southeast District
Contact Info

(573) 380-1658