This project along U.S. 61/67 stretches 9.7 miles, beginning at the intersection of Route M and U.S. 61/67 near Barnhart and ending at the intersection of American Legion Dr. and U.S. 61/67 in Festus. It covers the cities of Barnhart, Pevely, Herculaneum, Crystal City, and Festus.
The project is focused on maintaining the longevity of the life of this stretch of roadway.
The goal is to provide preventive maintenance by resurfacing the existing U.S. 61/67 pavement. Guardrail upgrades along portions of the corridor, pedestrian facility upgrades at the southern end of the project, and signal replacements at four intersections (Route M, Beffa St., Route A, and American Legion Dr.) are also included in the project, along with three box culvert replacements.
Project Milestones
IMPACT TO TRAFFIC
Traffic lanes will be closed to allow for pavement rehabilitation. This may include closing the northbound or southbound lanes while leaving a two-lane section that can be maintained for two-way traffic. Businesses will have entrance diversions, where possible, or partially closed entrances where access is unconnected or limited. There will never be a total shut down to a movement or access.
COST OF PROJECT
$10.1 Million
WHO TO CONTACT
Stephen O'Connor, P.E.
Title
Area Engineer
Department
St. Louis District
Contact Info
Shirley Norris
Title
Project Manager, Franklin and Jefferson Counties
Department
St. Louis District
Contact Info
Office: (314)-453-5032
Cell: (314)-565-5648
E-mail: Shirley.Norris@modot.mo.gov
Office: (314)-453-5032
Cell: (314)-565-5648
E-mail: Shirley.Norris@modot.mo.gov