Project Milestones

May 2022
U.S. 60 Widening between U.S. 65 and National to be Completed
milestone_icon
June 2022
U.S. 60 Widening Project between National Avenue & Kansas Expressway Awarded to Contractor
milestone_icon
September - November 2022
Construction to replace Route 60 and Route 360 eastbound bridge approaches
milestone_icon
Spring 2023
Route 60 Widening construction begins
milestone_icon
November 2024
Construction complete
milestone_icon

Project Facts:

  • Add lane in Route 60 median in each direction between National Avenue & Kansas Expressway
  • Widen Route 60 bridges over Campbell Avenue
  • Build two sound walls north of Route 60:
    • Between Republic Road bridge over Route 60 and National Avenue along Kickapoo Prairie Estates
    • Between Campbell Avenue and Republic Road bridge over Route 60 along Parkwest Village
  • Replace eastbound bridge approaches:
    • Republic Road bridge over US 60 between Campbell Avenue and National Avenue
    • Missouri Route 360 (James River Freeway) between Route MM and Sunshine Street
  • Resurface Route 60 southbound ramps  between Campbell Avenue and Kansas Expressway
  • Fog seal Route 60 shoulders
  • Intersection improvements at Campbell Avenue and Republic Road
  • Contractor: Capital Paving & Construction LLC, Jefferson City
  • Construction of bridge approaches to begin September 2022 - November 2022
  • Route 60 Widening Construction Beings: Spring 2023
  • Completion date: November 1, 2024
  • Estimated Total Cost: $21 million
    • Intersection Improvements at Campbell Ave are a cost share with the City of Springfield

 

 Traffic Impacts:

  • Narrowed lanes and traffic shifts on Route 60 between National Avenue and Kansas Expressway
  • Eastbound left inside lane closures on two bridges: Monday, September 12 until Sunday, October 9
    • Eastbound Route 60 left lane closure on bridge west of West Bypass
    • Eastbound Missouri Route 360 left lane closure on bridge between Greene County Route MM and Missouri Route 413 (Sunshine Street) over railroad
    • Expect narrow driving lane with a 9 foot width restriction and 9 foot shoulder
  • Eastbound right outside lane closures on two bridges: Monday, October 10 until Sunday, November 13
    • Eastbound Route 60 right lane closure on bridge west of West Bypass
    • Eastbound Missouri Route 360 right lane closure on bridge between Greene County Route MM and Missouri Route 413 (Sunshine Street) over railroad
    • Expect narrow driving lane with an 11 foot width restriction and use of shoulder
  • Nighttime lane closures on Route 60 between National Avenue and Kansas Expressway
  • Drivers should not pass in the work zone due to narrowed driving lanes on Route 60 between National Avenue and Kansas Expressway
  • Traffic shifts on Campbell Avenue and Republic Road
  • Crews and equipment close to traffic in areas
  • Signs and message boards will alert drivers approaching the work zone
  • Drivers should look for alternate route