Districts Impacted
PROJECT DETAILS
MoDOT will be making safety improvements along U.S. 24 just east of east of Wilson Ave. to just west of Sterling Ave. Improvements include a 5-lane typical section with curb and gutter, enclosed drainage storm sewers, raised concrete islands, traffic signal improvements, and signing and pavement marking improvements. A 10-foot multi-use path is also proposed along the south side of the roadway with a 5-foot sidewalk along the north side of the roadway.
The main goal of this project is to improve safety and mobility along the U.S. 24 Highway just east of Wilson Ave. to just west of Sterling Ave. After reviewing the types and locations of crashes within the corridor, it was determined that the best way to address the concerns and improve safety is to modify the roadway to a 5-lane section with a two-way left turn lane. In addition, there are intersections that will be improved with upgrading or replacing traffic signals. In order to improve bicycle and pedestrian safety, this project will include additional crossings at traffic signals, a new shared use path, and new sidewalks and existing sidewalk upgrades. Drainage will be improved through the corridor. Access to businesses along the corridor will also be improved.
This is the third and final phase of the project. Phases 1 and 2 were let in combination in May 2023. Construction is scheduled to begin in the summer of 2023 and the project is scheduled to be completed in the summer of 2026.
TRAFFIC IMPACTS AND COSTS
Lane closures on U.S. 24 and some side street closures will occur during construction. Local businesses may see impacts to their access during construction.
This project is funded through a partnership between the City of Independence and MoDOT and is currently estimated at $5 million.
This is the third and final phase of the project.
Online Comment Period Information
MoDOT will host an online comment period for the third and final phase of the project. The comment period will be open from 4 p.m. Tuesday, July 25 until 4 p.m. on Tuesday, Aug. 8. If you need more information, please refer to the contact information and comment form available below.

Project Plans & Timeline
- Project Plans
- Timeline
-
This is the third and final phase of the project. Phases 1 and 2 were let in combination in May 2023. Construction is scheduled to begin in the summer of 2025 and the project is scheduled to be completed in the summer of 2026.
-
Please note preliminary plans are subject to change.
-

Need More Information?
We're here to help. If you need additional information, you may contact MoDOT Kansas City Area Engineer Jill Bruss or Project Manager Chris West.
- Jill Bruss, MoDOT Area Engineer
- Email: jill.bruss@modot.mo.gov
- Christopher West, Project Manager
- MoDOT Customer Service Line: 1-888-275-6636

Share Your Comments!
Online Comment Information
MoDOT accepted comments on Phase 3 of this project (U.S. 24 just east of east of Wilson Ave. to just west of Sterling Ave.) from 4 p.m. on Tuesday, July 25 until 4 p.m. on Tuesday, Aug. 8. The comment form is now closed. If you need more information, please refer to the contact information above to request more information.
NEWS RELEASES
-
Kansas City area maintenance work for June 16-20
LEE’S SUMMIT, MO – The Missouri Department of Transportation will be performing maintenance work throughout the Kansas City region from June 16-20. All work is weather permitting.
JACKSON COUNTY
Interstate 435 at Front Street: lane and ramp closures...
-
Lane closures scheduled for NB/SB I-35 in downtown Kansas City, evening/overnight, June 17-July 26
JACKSON COUNTY – Crews will perform repaving work requiring double lane closures on NB/SB I-35 from the state line (Cambridge Cir.) to the I-670 interchange, evening and overnight, 7 p.m. until 6:30 a.m., June 17 – July 26 (approximately).
Evening...
-
NOW OPEN: Platte County Route H north of Weston has reopened
PLATTE COUNTY - Crews have reopenned Platte County Route H north of Weston. The roadway was closed between Countryside Rd. and Taulbee Rd. due to a culvert failure on June 4. Repairs have been completed and motorists may now access the roadway.
For...
-
Double lane closure scheduled for SB I-35 over Summit St. and W. 27th St., June 13-16
JACKSON COUNTY – Crews will continue to perform bridge deck repairs requiring a double lane closure on SB I-35 over Summit St. and W. 27th St., beginning at 8 p.m. on Friday, June 13 until 6 a.m. on Monday, June 16. This is a continuation of the work...
-
Improve I-70 KC: Lane closures scheduled on I-70 near 27th St. for geotechnical work, June 17-18
JACKSON COUNTY – Crews will be conducting lane closures on Interstate 70 near 27th St. on Tue., June 17 and Wed., June 18, for geotechnical work. The work will also take place in ongoing lane closures for the construction of the 23rd St. bridge and...