Missouri Route 59 Streambank Stabilization and Sidewalk Improvements in McDonald
This project will stabilize the streambank along the Elk River on Route 59 (Cliffside Drive) between the Elk River bridge and the Butler Creek bridge. Sidewalks and pedestrian improvements also are part of this project.