Displaying 1391 - 1400 of 66564 results

2019 Missouri Standard Plans for Highway Construction

2019 Missouri Standard Plans for Highway Construction   General  The standard plans book contains material, equipment and construction requirements for items specified in the construction of Missouri's transportation i...

2018 Missouri Standard Plans for Highway Construction

2018 Missouri Standard Plans for Highway Construction   General  The standard plans book contains material, equipment and construction requirements for items specified in the construction of Missouri's transportation i...

2017 Missouri Standard Plans for Highway Construction

2017 Missouri Standard Plans for Highway Construction   General   The standard plans book contains material, equipment and construction requirements for items specified in the construction of Missouri's transportation infrastructure....

About LPA/Contact Us

The Missouri Department of Transportation (MoDOT) provides guidance for special funding programs and other programs that impact work performed by localities, and serves as a liaison to local governments who seek federal reimbursement for their...

In Person

The project includes improving Route D (North Washington Street) from Route EE (Burks Road) to Route 32 (Karsch Boulevard). The project will widen Route D with a two-way, left-turn lane from Hillsboro Road to Route 32; extend the right-turn lane to better accommodate the southbound to westbound movement from Route D onto Route 32; rebuild the roadway (full-depth replacement) from Route EE to Route 32 to address the current pavement conditions; and improve drainage. The box culvert crossing Route D near Route 32 will also be extended to the west to provide more clearance for vehicles making a right turn onto Route 32. Additionally, it will update pedestrian facilities on the eastside of Route D to meet Americans with Disabilities Act (ADA) requirements. As part of the safety improvement project, access management measures will be implemented to reduce conflict points along the corridor. 

Counties Impacted
St. Francois
Route Impacted
D
MEETING DATE
09/04/2025
MEETING TIME
3 - 5 p.m.