PROJECT TIMELINE
Ash Grove High School Library, 100 N Maple Ln, Ash Grove
This is a come-and-go style meeting with no formal presentation. If you cannot attend, please review the project information and complete the comment form below by March 16.
Project Information
- Build a new Route 160 culvert at Hamilton Creek, between Thurmond Avenue and Perryman in Ash Grove. The new culvert is a double 8-foot-by-4-foot concrete box
- Proposed Route 160 width will be widened to accommodate 4-foot shoulders
- The proposed culvert project will widen 10 feet each side of the existing road to accommodate shoulders and future pedestrian paths along the roadway
Traffic Impact
- U.S. Route 160 CLOSED over Hamilton Creek up to 3 weeks during construction
- Signed Detour: Main Street and Route F (Calhoun Avenue)
- Short-term lane closures during construction
Culvert Facts
- Built in 1929
- Old culvert 29 feet wide, 27 feet long, triple 5-foot-by-5-foot concrete box
- Carries 2734 vehicles a day
- The current culvert is in poor condition and is in need of frequent maintenance
Estimated Total Cost: $946,000
This project is being let with the Greene County Route F Bridge Replacement Project found here.
Project Updates
-
MoDOT: U.S. Route 160 Culvert Replacement in Ash Grove & Greene County Route F Bridge Replacement
Ash Grove, Greene County – Those interested in the U.S. Route 160 Culvert Replacement Project in Ash Grove & Greene County Route F Bridge Replacement Project south of Ash Grove are invited to a public meeting to discuss proposed improvements and...
Frequently Asked Questions:
How long will Route 160 be closed during construction?
U.S. Route 160 will be CLOSED at the culvert for up to 3 weeks during construction. Detours for the project include Main Street and Route F (Calhoun Avenue).
Will I be able to get to business on either side of the culvert?
Drivers will have access to driveways and entrances on either end of the work zone, but will not be able to travel through the work zone.
The last day to leave comments on this project is March 16.
Project Contacts
Beth Schaller
Title
Area Engineer
Department
Southwest District
Contact Info
Forward 44: Southwest I-44 Improvements Deputy Project Director,
Ozarks Transportation Organization: Greene & Christian Counties
Email: Beth.Schaller@modot.mo.gov
Phone: (417) 529-4120
Ozarks Transportation Organization: Greene & Christian Counties
Email: Beth.Schaller@modot.mo.gov
Phone: (417) 529-4120
Bud Sherman
Title
Transportation Project Manager
Department
Design
Contact Info
Email: Bud.Sherman@modot.mo.gov
For the most efficient response, please contact Bud via email.
Phone: (417) 895-7690
Email: Bud.Sherman@modot.mo.gov
For the most efficient response, please contact Bud via email.
Phone: (417) 895-7690