Counties Impacted
Greene
Route Impacted
F
Work Type
Bridge Replacement
Planning Phase

PROJECT TIMELINE

Public Meeting
4:30-6 p.m. on Monday, March 2, 2026
Ash Grove High School Library, 100 N Maple Ln, Ash Grove

This is a come-and-go style meeting with no formal presentation. If you cannot attend, please review the project information and complete the comment form below by March 16.

milestone_icon
Construction Begins
Winter 2026
milestone_icon
Project Completion
November 2027
milestone_icon

Project Information

  • Replace the Greene County Route F bridge over Sac River between County Route 114 and County Route 116 south of Ash Grove
  • New bridge will be 10 feet wider and 9 feet longer than the current bridge

 Traffic Impacts

  • Route F over Sac River will be Closed to traffic for up to 4 months
  • Signed Detour: Route T and Route 266

Bridge Facts

  • Built in 1936
  • Old bridge is 22 feet wide, 335 feet long
  • Carries 874 vehicles a day
  • Current bridge is in need of frequent maintenance

 Estimated Total Project Cost: $4.1 million

 

This project is being let with the U.S. Route 160 Culvert Replacement Project in Ash Grove found here.

Project Updates

Frequently Asked Questions:

Will there be a signed detour?

Yes, a signed detour for the Route F bridge closure includes Route T and Route 266.

How long will the Route F bridge be closed?

The Greene County Route F Bridge over Sac River will be closed for up to 4 months.

Will I be able to access my property on Route F?

Drivers will have access to driveways and entrances on either end of the work zone, but will not be able to travel through the work zone.

Will MoDOT need to acquire additional right-of-way for these projects? 

Yes. Additional right-of-way will be needed to construct the project. The new construction will require the acquisition of right-of-way and temporary easements from property owners. Please review the exhibits for additional information. A Right of Way representative will be contacting affected landowners to begin the acquisition process. For more information on the acquisition process, please see the Pathways of Progress display above. 

The last day to leave comments on this project is March 16.

Webform
Name:

Thank you for your feedback. The MoDOT project team carefully reviews and considers all comments. While every comment is considered, not all comments may result in changes to the final project design.

Embed
Is Responsive
Embed Code

Project Contacts

Contact Photo
Beth Schaller Portrait
Beth Schaller
Title
Area Engineer
Department
Southwest District
Contact Info
Forward 44: Southwest I-44 Improvements Deputy Project Director,
Ozarks Transportation Organization: Greene & Christian Counties
Email: Beth.Schaller@modot.mo.gov
Phone: (417) 529-4120
Contact Photo
Bud "Warner" Sherman
Bud Sherman
Title
Transportation Project Manager
Department
Design
Contact Info

Email: Bud.Sherman@modot.mo.gov

For the most efficient response, please contact Bud via email.

Phone: (417) 895-7690