PROJECT SUMMARY
Interchange and safety improvements at the Interstate 29 and Route HH interchange in Platte City.
PROJECT MILESTONES
ABOUT THE PROJECT
Details
This project will include many interchange and safety improvements. Some of these improvements include:
- A roundabout at the intersection of the I-29 SB exit ramp and Vine Street.
- Deceleration lane added to the I-29 SB/NB exit ramps
- I-29 NB exit ramp widening for a right turn lane at the terminus of the ramp with Route HH.
- Turning radius improvements at WB Route HH to the I-29 NB entrance ramp.
- Full depth shoulder replacement on the I-29 NB entrance ramp
- Slide repair on the south side of Route HH, just east of NB ramps
- Guardrail replacement on the SB/NB I-29 exit ramps
- Drainage improvements include replacement of a pipe between Old US-71 and the I-29 SB lanes.
- Repair to a sinkhole in the median of I-29.
Traffic Impacts
- The I-29 SB exit ramp and Vine Street intersection will be closed for the construction of the roundabout. Traffic will utilize the two other interchanges nearby as a detour:
- I-29 and Route 273
- I-29 and Route 92
- The I-29 NB exit ramp will close for construction of the new deceleration lane. This will be completed in a different phase of the roundabout construction due to the need for using the NB ramps during the detour.
- Other work will require the need for lane/shoulder closures with temporary periodic closures using a detour similar to the one for the roundabout construction.
- The slide repair work may require narrowing of Route HH with some lane closures of WB Route HH and utilizing a flagger setup.
Comment Period
An online comment period will be held from Thursday, November 13 at 4:00 p.m. until Thursday November, 27 at 4:00 p.m. You can submit your comments using the form below. You can view the project displays under the milestone section above.
PROJECT CONTACTS
Ravi Neupane
Title
Area Representative
Department
Kansas City District
Contact Info
Heather Barrows
Title
Kansas City District Project Manager
Department
Design
Contact Info
Phone: (816) 607-2209
Email: Heather.Barrows@modot.mo.gov
Phone: (816) 607-2209
Email: Heather.Barrows@modot.mo.gov
NEWS RELEASES
-
REMINDER: Online Comment Period Regarding Rt. HH in Platte County, NOW - Nov. 27
REMINDER: PLATTE COUNTY – The Missouri Department of Transportation (MoDOT) is seeking public comment input regarding Route HH Interchange Improvements Along Route HH In Platte County. The comment period opened at 4 pm on Thursday, November 13. The...
-
REMINDER: MoDOT Kansas City seeking public feedback on I-70 Environmental Assessment: I-435 to 470
JACKSON COUNTY - The Missouri Department of Transportation Kansas City (MoDOT KC) is seeking public feedback on the recommended preferred alternative on the I-70 Environmental Assessment: I-435 to I-470. The second public meeting for I-70...
-
NOW OPEN: Business Hwy 50 intersection at US-50 west of Warrensburg
JOHNSON COUNTY – The Missouri Department of Transportation has reopened the Business Highway 50 intersection at U.S. Highway 50 west of Warrensburg. Access to Business 50 was closed in June 2025 as part of an intersection improvements project along...