Districts Impacted
Project Summary
MoDOT is implementing a project to address aging pavement and traffic signals, the lack of connectivity for pedestrians and all modes of transportation, and drainage improvements on Page Avenue (Route D) from I-170 to east of Pennsylvania Ave. The sidewalks no longer meet the Americans with Disabilities Act (ADA) requirements and need to be replaced.
Project Timeline
4-6 p.m.
Vinita Park City Hall
8374 Midland Blvd. 63114
What improvements will be made?
The project will include:
- Pavement resurfacing and new pavement markings.
- Upgraded sidewalks to meet ADA requirements.
- Additional sidewalks along the corridor to accommodate pedestrians.
- Upgraded traffic signals at intersections to meet ADA standards from I-170 to Midland.
- Drainage system improvements
- Improve existing midblock crossings between Gulf Dr. and Ermes Dr. and at Liberty Ave. Midblock improvements will include:
- Rectangular Rapid Flash Beacon (RRFB) View VIDEO
- Lighting
- Raised Refuge Island
- Continued pavement markings and signage
- Evaluating new midblock crossing at Walton Ave. and Crystal Industrial Ave.
What will be the impact to traffic?
MoDOT will make every reasonable effort to reduce delays due to construction. Customers using the route can anticipate daily lane closures and some night operations.
How much will the project cost?
This project is anticipated to cost $11 million.
Route D Displays
WHO TO CONTACT

Tabitha Locke
Title
Area Engineer, North St. Louis County
Department
St. Louis District
Contact Info
Office: (314) 453-1749
Email: Tabitha.Locke@modot.mo.gov
Office: (314) 453-1749
Email: Tabitha.Locke@modot.mo.gov

Daniel Savageau
Title
Project Manager, North St. Louis County
Contact Info
St. Louis District
Phone: 314-453-5089
Email: daniel.savageau@modot.mo.gov
St. Louis District
Phone: 314-453-5089
Email: daniel.savageau@modot.mo.gov