Last section of Route 6 to be resurfaced in Trenton

10/01/2020

TRENTON, Mo. – Resurfacing on the final section of Grundy County Route 6 in Trenton will begin soon. Contractors from Emery Sapp & Sons, Inc., working with the Missouri Department of Transportation, were waiting for the sidewalk work to conclude...

US 160 in Howell County CLOSE to Seal Roadway

10/01/2020

WILLOW SPRINGS - U.S. 160 (Independence Drive) in Howell County will be closed as Missouri Department of Transportation crews seal the roadway with a mixture of rock and oil.

This section of roadway is located from Route BB to Gibson Ave in West...

Interstate 29 to close for emergency repairs this evening

10/01/2020

AMAZONIA, Mo. – Emergency roadway repairs will once again close a section of southbound Interstate 29 in Andrew County this evening. After attempts to temporarily repair the roadway, contractors from Capital Paving and Construction, LLC., working...

Week of October 5 - Route 160 Widening Willard to Springfield

10/01/2020

UPCOMING TRAFFIC PATTERN CHANGES:

  • New roundabout to OPEN on Route 160 at Greene County Farm Road 94 Wednesday, October 7
  • Drivers can expect flaggers directing them through work zones at Farm Road 123, Farm Road 115 and Hughes Road

Work Schedule...

Repairs planned for two Nodaway County routes

10/01/2020

MARYVILLE, Mo – The work to repair two Nodaway County routes damaged during the installation of the White Cloud wind farm project is scheduled to begin next week. Enel Green Power, the contractor installing the White Cloud wind farm, contracted with...

Interstate 29 to narrow in Buchanan County this week

09/30/2020

St. Joseph, Mo. – Rumble strip installation will narrow Interstate 29 tomorrow and Friday. The Missouri Department of Transportation contracted with Herzog Contracting Corp. to resurface I-29 from just south of Route O to the Platte County line.

The...

Subscribe to