Counties Impacted
Bates
Completed

Project Facts:

  • Replace Route B bridge over Shaw Branch west of Rockville
  • Replace existing single-lane bridge with new two-lane structure over Shaw Branch
  • New bridge will be 26 feet wide, six feet wider than current bridge
  • New bridge will be approximately 15 feet longer than current bridge
  • Current bridge built in 1935
  • Approximately 300 vehicles per day cross the bridge
  • Bridge deteriorating, too narrow for current traffic

Construction: Summer 2019

Estimated total project cost: $707,000

Traffic Impacts:

  • Route B CLOSED for up to four months at the bridge during construction
  • Drivers will have access to property at both ends of the bridge
  • No signed detour, drivers should use alternate routes