2025 Northeast District Construction Guide

For all routine maintenance and construction projects in the state, check out the Traveler Information Map at http://traveler.modot.org/map/
Scroll down to see a county specific listing of all construction projects or print  the .pdf of this information

 

Embed
Is Responsive
Embed Code

Interested in major road work in Northeast Missouri during 2025?

Click on any of the red lines or icons in northeast Missouri to learn more about major road projects planned. 

If you want a county by county listing, scroll down or print out the text version of the current annual Construction Guide. 

All projects are scheduled for completion during 2025 unless otherwise noted. 

 

Image
Pavement resurfacing

Adair County

 

Route 6: Seal Coat - 1 mile east of Route 149 at the Chariton River to Bus. Route 63 in Kirksville

Route 6: Seal Coat - 0.2 mile east of Route 63 in Adair County to Route 15 south junction near Edina in Knox County

Route 6: Seal Coat - Chariton River bridge near Novinger in Adair County to 0.3 mile west of Route D in Green Castle in Sullivan County

Route D: Resurfacing - Route 6 in Green Castle in Sullivan County to Route 149 near Green Grove in Adair County **

Route E: Bridge Replacement - Over Bear Creek, 1.6 miles west of Route V, near Gibbs

Route V: Bridge Replacement - Over North Timber Creek, 0.86 mile south of Route 6, near Brashear

Route V: Sidewalk (ADA) Improvements - Olive Street to Chicago Avenue in Gibbs

Route T: Resurfacing - Route 63 to the end of state maintenance **

 

** Included in Gov. Parson's Rural Roads Program.  These improvements will be completed by Nov. 1, 2025.  Click here for more information on Gov. Parson's Rural Roads Program.

Image
Bridge construction

Audrain County

 

Route 15: Resurfacing - Route D in Monroe County to 1.1 miles north of Route 22 near Mexico in Audrain County

Route 151: Resurfacing - 0.3 mile north of Route 36 near Clarence in Shelby County to Route 22 near Centralia in Boone County (three disconnected sections)

Route C: Resurfacing - Route 24 in Monroe County to Route 151 near Centralia at the Boone County line **

Route K: Bridge Replacement - Over Hickory Creek, 1.74 miles west of Route W, near Farber

Route Y - Resurfacing - Route M in Monroe County to Route 22 near Sturgeon in Audrain County **

Route CC: Resurfacing - Route C to Route 15 near Rowena **

Route JJ: Resurfacing - Route 54 to the end of state maintenance near Mexico **

 

** Included in Gov. Parson's Rural Roads Program.  These improvements will be completed by Nov. 1, 2025.  Click here for more information on Gov. Parson's Rural Roads Program.

Image
Sidewalks

Clark County

 

Route 136: Bridge Painting - Structure over BNSF Railway, 0.21 mile west of South Street, in Medill

Route 136: Seal Coat - Schuyler County line to 0.5 mile west of the BNSF Railroad crossing near Medill in Clark County

Image
Pavement sealing

Knox County

 

Route 6: Seal Coat - 0.2 mile east of Route 63 in Adair County to Route 15 south junction near Edina in Knox County

Route 11: Bridge Painting - Structure over North Fork South Fabius River, 1.4 miles west of Route 15, near Baring

Route 151: Resurfacing - Route 156 in Knox County to 0.3 mile north of Route 36 near Clarence in Shelby County

Route 156: Bridge Painting - Structure over North River, 0.28 mile west of Route 15, near Novelty

Route P: Bridge Painting - Structure over BNSF Railway, 3.23 miles south of Route 11, near Kenwood

Image
Bridge work

Lewis County

 

Route V: Sidewalk (ADA) Improvements - Olive Avenue to 292nd Avenue in Maywood  (Est. Completion November 2026)

Route Y: Resurfacing - Route K to Route 16 near Monticello **

 

** Included in Gov. Parson's Rural Roads Program.  These improvements will be completed by Nov. 1, 2025.  Click here for more information on Gov. Parson's Rural Roads Program.

Image
Widening Project

Lincoln County

 

Route 47: Interchange Improvements - Diverging Diamond Interchange at Route 61 in Troy

Route K: Resurfacing - Route 61 to the end of state maintenance **

Route V: Resurfacing - Route 61 to Route W **

Route W: Resurfacing - Route 79 in Pike County to Route B in Lincoln County (two disconnected sections) **

Route Y: Resurfacing - Route W to Route 79 **

 

** Included in Gov. Parson's Rural Roads Program.  These improvements will be completed by Nov. 1, 2025.  Click here for more information on Gov. Parson's Rural Roads Program.

Image
Sealing project

Macon County

 

Route 36 (Eastbound): Pavement Resurfacing and Bridge Rehabilitation - 0.5 mile west of Route O to 0.1 mile east of Kellogg Avenue near Macon  (Est. Completion Fall 2026)

Route 36 (Westbound): Pavement Resurfacing and Bridge Rehabilitation - Kellogg Avenue in Macon to 1.7 miles west of Route O  (Est. Completion Fall 2026)

Route 36 (Westbound): Resurfacing - 0.5 mile west of Route Z near Monroe City in Marion County to 0.3 mile west of the Macon County line near Clarence

Route 63: Interchange Improvements - Bridge rehabilitation and signalize intersections at Route 36 and intersection safety improvement at Route 36 and Kellogg Avenue in Macon  (Est. Completion Fall 2026)

Route 63 (Northbound and Southbound): Resurfacing - 0.6 mile south of Route YY in Macon County to 1.8 miles north of Route 24 near Moberly in Randolph County (five disconnected sections)

Route 149: Sidewalk (ADA) Improvements - North Commercial Street to Walnut Street in Ethel  (Est. Completion September 2026)

Route 156: Sidewalk (ADA) Improvements - South Hastings Street to just east of Tremont Street in La Plata  (Est. Completion September 2026)

Route 156: Sidewalk (ADA) Improvements - 50 feet west of South Macon Street to South Main Street in South Gifford  (Est. Completion September 2026)

Route C: Sidewalk (ADA) Improvements - Route T north junction to Route T south junction in College Mound  (Est. Completion September 2026)

Route J: Bridge Replacement - Over Mussel Fork, 0.03 mile east of the Linn County line, near New Boston

Route J: Sidewalk (ADA) Improvements - East Missouri Avenue to South Elm Street in Elmer  (Est. Completion September 2026)

Image
Pavement sealing

Marion County

 

Route 6: Bridge Rehabilitation - Over Routes 24/61, 7.6 miles north of Route 168, near Taylor

Route 36 (Eastbound): Pavement Resurfacing and Diamond Grinding - 0.9 mile east of Route H to 1.8 miles east of Route 24 east junction

Route 36 (Westbound): Pavement Resurfacing and Diamond Grinding - 0.7 mile west of Route 61 at Hannibal in Marion County to 0.5 mile west of Route Z near Monroe City in Marion County

Route 36 (Westbound): Resurfacing - 0.5 mile west of Route Z near Monroe City in Marion County to 0.3 mile west of the Macon County line near Clarence

Route I-72: Bridge Washing - Mark Twain Memorial Bridge, over the Mississippi River at Hannibal

Route F: Resurfacing - Route E to 0.2 mile west of Route 61 near Palmyra **

Route P: Resurfacing - Route A to the end of state maintenance near Durham **

 

** Included in Gov. Parson's Rural Roads Program.  These improvements will be completed by Nov. 1, 2025.  Click here for more information on Gov. Parson's Rural Roads Program.

Image
Pavement construction

Monroe County

 

Route 15: Resurfacing - Route D in Monroe County to 1.1 miles north of Route 22 near Mexico in Audrain County

Route 15: Seal Coat - Route 154 north junction to Route D near Paris

Route 151: Resurfacing - 0.3 mile north of Route 36 near Clarence in Shelby County to Route 22 near Centralia in Boone County (three disconnected sections)

Route 154: Seal Coat - Route 24 at Paris in Monroe County to 0.04 mile west of Route 19 near Perry in Ralls County (two disconnected sections)

Route C: Resurfacing - Route 24 in Monroe County to Route 151 near Centralia at the Boone County line **

Route M: Resurfacing - Route 151 to Route 15 **

Route U: Resurfacing - Route 24 to the end of state maintenance **

Route Y - Resurfacing - Route M in Monroe County to Route 22 near Sturgeon in Audrain County **

 

** Included in Gov. Parson's Rural Roads Program.  These improvements will be completed by Nov. 1, 2025.  Click here for more information on Gov. Parson's Rural Roads Program.

Image
Intersection project

Montgomery County

 

Route 19: Intersection Improvements - Stave Mill Road and Route 19 intersection, 0.4 mile south of the I-70 and Route 19 interchange  (Cost Share Project)

Route 19: Resurfacing - 0.2 mile north of Montgomery City to 1.7 miles south of I-70

Route 19: Resurfacing - 1.7 miles south of I-70 to 1.2 miles south of Route 94 near McKittrick

Route I-70 (Eastbound and Westbound): Resurfacing - 1.4 miles east of Route F in Montgomery County to east of Route MM in Warrenton in Warren County

Route 94: Seal Coat - Route 19 near McKittrick in Montgomery County to the Warren and St. Charles County line (two disconnected sections)

Route E: Bridge Replacement - Over I-70 in Jonesburg  (Est. Completion December 2026)

Route K: Bridge Replacement - Over Dry Fork Creek, 1.8 miles west of Route 19, near Big Spring  (Est. Completion September 2026)

Route K: Bridge Replacement - Over Loutre River, 0.4 mile west of Route 19, near Big Spring  (Est. Completion September 2026)

Route RA: Bridge Rehabilitation - Over Little Loutre Creek, 0.44 mile west of Route ZZ, near Wellsville

Route ZZ: Bridge Replacement - Over Little Loutre Creek, 0.46 mile south of Route RA, near Wellsville

Route CRD Stave Mill Road: Resurfacing - Route 19 to Bantys Lane  (Cost Share Project)

Image
Resurfacing pavement

Pike County

 

Route B: Bridge Replacement - Over Peno Creek, 0.4 mile west of Route 61, near Frankford  (Est. Completion December 2026)

Route D: Bridge Painting - Structure over Route 61 in Eolia

Route W: Bridge Replacement - Over Little Ramsey Creek, 0.5 mile north of Route H, in Paynesville  (Est. Completion December 2026)

Route W: Resurfacing - Route 79 in Pike County to Route B in Lincoln County (two disconnected sections) **

Route WW: Resurfacing - Route 61 to Route W **

 

** Included in Gov. Parson's Rural Roads Program.  These improvements will be completed by Nov. 1, 2025.  Click here for more information on Gov. Parson's Rural Roads Program.

Image
Bridge work

Ralls County

 

Route 154: Seal Coat - Route 24 at Paris in Monroe County to 0.04 mile west of Route 19 near Perry in Ralls County (two disconnected sections)

Route D: Bridge Painting - Structure over Lick Creek, 1.2 miles west of Route 19

Route EE: Resurfacing - Route J to Route 19 **

 

** Included in Gov. Parson's Rural Roads Program.  These improvements will be completed by Nov. 1, 2025.  Click here for more information on Gov. Parson's Rural Roads Program.

Image
Building pavement

Randolph County

 

Route 63 (Northbound and Southbound): Resurfacing - 0.6 mile south of Route YY in Macon County to 1.8 miles north of Route 24 near Moberly in Randolph County (five disconnected sections)

Route 63 (Southbound): Resurfacing - 0.3 mile south of Route 24 at Moberly to the Boone County line

Route D: Resurfacing - Route C near Huntsville to Route BB

Route O: Resurfacing - Route C to the end of state maintenance **

Route T - Resurfacing - Route F at Rucker in Boone County to Route B near Clark in Randolph County

Route U: Resurfacing - Route 3 to the end of state maintenance **

Route W: Resurfacing - Route 129 in Chariton County to Route 3 near Thomas Hill in Randolph County

Route BB: Resurfacing - Route 3 to Route A near Moberly

Route DD: Resurfacing - Route 24 in Moberly to the end of state maintenance

 

** Included in Gov. Parson's Rural Roads Program.  These improvements will be completed by Nov. 1, 2025.  Click here for more information on Gov. Parson's Rural Roads Program.

Image
Bridge work

Schuyler County

 

Route 136: Resurfacing - Route 63 in Schuyler County to 0.3 mile west of Route N near Livonia in Putnam County

Route 136: Seal Coat - Route 63 at Lancaster in Schuyler County to the Scotland County line near Downing

Route H: Resurfacing - Route 136 near Livonia to Route W near Worthington **

Route K: Sidewalk (ADA) Improvements - Washington Steet to Walnut Street in Greentop

Route M: Sidewalk (ADA) Improvements - Fifth Street to Route 202/Route AA in Glenwood

Route W: Sidewalk (ADA) Improvements - Route W/Main Street to Second Street in Queen City

Route W: Resurfacing - Route 63 in Queen City to the Putnam County line near Worthington **

 

** Included in Gov. Parson's Rural Roads Program.  These improvements will be completed by Nov. 1, 2025.  Click here for more information on Gov. Parson's Rural Roads Program.

Image
Bridge construction

Scotland County

 

Route 136: Seal Coat - Schuyler County line to 0.5 mile west of the BNSF Railroad crossing near Medill in Clark County

Image
Road work

Shelby County

 

Bus. Route 36: Resurfacing - 0.03 mile east of Grand Street to Route 151 in Clarence

Bus. Route 36: Resurfacing - Route 36 west junction to Route 36 east junction in Shelbina

Route 36 (Westbound): Resurfacing - 0.5 mile west of Route Z near Monroe City in Marion County to 0.3 mile west of the Macon County line near Clarence

Route 151: Resurfacing - Route 156 in Knox County to 0.3 mile north of Route 36 near Clarence in Shelby County

Route 151: Resurfacing - 0.3 mile north of Route 36 near Clarence in Shelby County to Route 22 near Centralia in Boone County (three disconnected sections)

Route J: Bridge Replacement - Over Tiger Fork, 0.6 mile west of Route W, near Bethel

Route K: Resurfacing - Route 151 to Route 15 in Shelbyville

Image
Pavement work

Warren County

 

Improve I-70 Project #2 - Warrenton to Wentzville: Safety and Capacity Improvements - Route MM/West Warrenton Boulevard interchange, west of Route 47 in Warrenton in Warren County, to the I-64/I-70 interchange at Wentzville in St. Charles County

Route I-70 (Eastbound and Westbound): Resurfacing - 1.4 miles east of Route F in Montgomery County to east of Route MM in Warrenton in Warren County

Route 94: Seal Coat - Route 19 near McKittrick in Montgomery County to the Warren and St. Charles County line (two disconnected sections)

Route A: Bridge Replacement - Over I-70 near Pendleton  (Est. Completion May 2026)

Image
Thumbnail