Counties Impacted
Atchison
Holt
In Progress

Atchison and Holt County Flood Damage Repairs

A listing of the planned projects to repair numerous routes in Atchison and Holt counties damaged during the flooding throughout 2019.

Embed
Interactive Statewide Transportation Improvement Program Map
Summary

The interactive map below can be utilized to view planned improvement projects, including flood damage repairs in Atchison and Holt counties.  Clicking on a specific route or bridge icon will produce a pop-up box with more information specific to the planned project.  

 

Is Responsive
Embed Code

Flood Repair Project Status:

Atchison County

The status of the following projects to repair the damage caused by the 2019 flooding in Atchison County were updated 12/14/2021:

Under construction
  • Route D - Awarded to Herzog Contracting Corp. Grading, rock fill and patching are complete. An overlay is scheduled for spring 2022.
  • Route U from U.S. Route 136 to Route E - Awarded to Herzog Contracting Corp. Grading and patching are complete. An overlay is scheduled for spring 2022.
  • Route E - Awarded to Herzog Contracting Corp. Grading and the asphalt base course are complete. An overlay is scheduled for spring 2022.
  • Route V - Awarded to Herzog Contracting Corp. Rock fill/base rock has been placed in the scour holes and patching is complete. An overlay is scheduled for spring 2022.
  • Route U - Awarded to Herzog Contracting Corp. Grading and the asphalt base course are complete. An overlay is scheduled for spring 2022.
Future construction
  • U.S. Route 136 from the Missouri River to I-29 - Flood resiliency permanent repair: scheduled to be let for contractor bidding April 15, 2022
Complete
  • Route Z - Complete
  • Route A from Route D to Interstate 29 - Complete
  • Route A from Route D to the end of the route - Complete
  • Route BB from Route A to the end of the route - Complete
  • Route TT from U.S. Route 59 to Q Avenue - Complete
  • Route B from I-29 to U.S. Route 59 - Complete
  • Route 111 from Route E to Corning - Complete
  • U.S. Route 136 bridge over the Missouri River at Brownsville - Complete

Holt County

The following are planned projects to repair the damage caused by the 2019 flooding in Holt County:

Future construction:
  • U.S. Route 159 from Missouri River to Route P - Flood resiliency permanent repair: scheduled to be let for contractor bidding Jan. 15, 2022
  • U.S. Route 159 from Little Tark to Route 111 south - Flood resiliency permanent repair: scheduled to be let for contractor bidding Jan. 15, 2022
  • Route 111 from Craig to Route 118 - Flood resiliency permanent repair: scheduled to be let for contractor bidding Jan. 15, 2022
Complete:
  • Route W - Complete
  • Route 111 from 118 to Route 159 - Complete
  • Route 111 from Route 111 Spur to U.S. Route 59 - Complete
  • Route 111 from Corning to Craig - Complete
  • Route 111 from Route E to Corning - Complete

NEWS: Atchison and Holt County Flood Damage Repair Projects

  • Holt County U.S. Route 159 pavement improvement project resumes

    02/22/2023

    ST. JOSEPH, Mo. – A pavement improvement and flood remediation project on Holt County U.S. Route 159 is expected to resume Monday, Feb. 27. The Missouri Department of Transportation has contracted with Phillips Hardy, Inc., to complete the project...

  • Three Atchison and Holt county routes to close

    07/14/2021

    St. Joseph, Mo. – Three routes in Atchison and Holt counties are scheduled to close periodically over the next two weeks as part of a flood repair and resurfacing project. Crews from Herzog Contracting Corp.,working with the Missouri Department of...