Counties Impacted
Cass
Project Status
Planning Phase
Route Impacted
U.S. Route 24

PROJECT DETAILS

MoDOT will be replacing various bridges along U.S. Route 24 near Buckner, MO. Four westbound bridges on the west side of Buckner, as well as the eastbound bridge over the railroad on the east side of Buckner will be replaced. These bridges are nearing the end of their service life and must be replaced. 

 

PROJECT TIMELINE

Construction is currently scheduled to begin in spring 2021 with an estimated completion in fall 2022.

TRAFFIC IMPACTS DURING CONSTRUCTION

Westbound traffic will be moved over to the  eastbound lanes resulting in two-way traffic during construction of the bridges on the west side of Buckner.  Eastbound traffic will be moved over to the westbound lanes resulting in two-way traffic during the construction of the railroad bridge on the east side of Buckner.  

 

PROJECT FUNDING

The current estimated cost of this project is $10,800,000 through federal and state funds