Bridge Rehabilitation
In Progress

Safe and Sound Bridge Rehabilitation Project

The Missouri Department of Transportation rebuilt more than 800 bridges approximately 13 years ago in the Safe & Sound Bridges program. The bridges shown in the map and list below were part of that program and each has an asphalt deck rated as fair to good condition. The lifecycle of asphalt is about 10 years. The resurfacing will act as a preservation treatment to ensure the bridges stay in as good as condition as possible.

When rebuilt during the Safe & Sound Bridges program, weep holes were built into the deck for drainage. Over time, run-off from the bridge surface erodes the painted exterior. To ensure the pre-cast, concrete portions of the supporting structures are protected, the bridges are being repainted.

This project was included in MoDOT's August 2024 contractor bid opening. The Missouri Highways and Transportation Commission awarded the project to Capital Paving and Construction, LLC at their September 2024 meeting. 

The project is expected to begin on Monday, March 31.

During construction the roadway will be narrowed to one lane.

Click on the years below to see all the bridges included in this project.

Contractor: Capital Paving & Construction, LLC

  • Route KK over Puckett Slough
  • Missouri Route 139 over Big Creek
  • Missouri Route 139 over Big Creek Drainage Ditch
  • Missouri Route 139 over Big Creek Overflow
  • Route B over Camp Creek
  • ​Route E over Fish Pond Creek
  • Route E over McCroskie Creek
  • Route J over Mound Creek
  • Route M over Big Creek
  • Route M over Wolf Creek
  • Route OO over McCroskie Creek
  • Route W over Burr Oak Creek​​​​
  • Route M over Island Creek
  • Route O over West Fork Grand River
  • Route UU over Turkey Creek
  • U.S. Route 69 over Big Creek
  • U.S. Route 69 over Big Creek Overflow
  • Missouri Route 46 over East Fork Big Creek
  • Missouri Route 46 over Shain Creek
  • Route A over Big Panther Creek
  • Route B over Branch
  • Route B over Ditch
  • Route B over Panther Creek
  • Route F over Panther Creek
  • Route KK over Shain Creek
  • Route M over West Fork Big Creek
  • Route N over Brush Creek
  • Route O over Donaby Creek
  • Route O over Indian Creek
  • Route UU over Indian Creek
  • Route Y over Trail Creek
  • Route Z over Shain Creek
  • Route A over Panther Creek
  • Route D over Goose Creek
  • Route W over East Sheep Creek
  • Route B over Camp Creek
  • Route P over Puzzle Creek
  • Missouri Route 121 over Deer Creek
  • Route CC over Dog Creek
  • Route J over Marrowbone Creek
  • Route J over Dog Creek
  • Route D over Old Channel Shoal Creek
  • Route DD over Dillon Creek
  • Route Y over Owl Creek
  • Route H over Arapahoe Creek
  • Route H over Wolfpen Creek
  • Route P over Third Fork Platte River
  • Missouri Route 116 over Little Bee Creek
  • Missouri Route 116 over Bee Creek
  • Route M over Sugar Creek
  • Route DD over Malden Creek
  • Route H over Dry Branch
  • Route E over East Fork Lost Creek
  • Route E over Lost Creek
  • Route E over Little Third Fork Platte River

Bridges included in this bundle

Embed
2025 Bridges
Summary

Purple = Western Area

Orange = Eastern Area

Is Responsive
Embed Code

Project News:

  • Planned Roadwork for Northwest Missouri, May 5-11

    05/02/2025

    St. Joseph, Mo. – The following is a list of general highway maintenance and construction work the Missouri Department of Transportation has planned in the Northwest Missouri region for the week of May5-11.

    There also may be moving operations...

  • Railroad crossing on Route T in Andrew County to close May 1-2

    04/30/2025

    St. Joseph, Mo. – The BNSF Railroad crossing on Route T northwest of Amazonia will close beginning tomorrow, Thursday, May 1, for repairs. Crews will close the crossing Thursday, May 1 and Friday, May 2 from 7 a.m. to 5 p.m. daily to make necessary...

  • Planned Roadwork for Northwest Missouri, April 28-May 4

    04/25/2025

    St. Joseph, Mo. – The following is a list of general highway maintenance and construction work the Missouri Department of Transportation has planned in the Northwest Missouri region for the week of April 28-May 4.

    There also may be moving operations...

Frequently Asked Questions: 

Q: Who can I contact if I have further questions?

A: Questions may be left by calling 888 ASK MODOT (888-275-6636) or emailing nwcr@modot.mo.gov

Q: What will the impact to traffic be?

A: During construction, there will be single lane closures in place. View MoDOT's Traveler Information Map to see what work zones are in place at http://traveler.modot.org/map/, or downloading from your smart phone’s app store.