Districts Impacted
Project Summary
This project will replace the U.S. Route 50 eastbound bridge over South Fork of the Blackwater River, 0.1 miles east of Route W/Z and 1 mile west of NW 1601 Rd.
Project Milestones
Elm Springs Baptist Church
567 NW 1601st Rd, Kingsville, MO 64061
Latest Project News
-
REMINDER: Public comment period OPEN for US-50 bridge replacement near Powell Gardens, NOW - Nov. 10
JOHNSON COUNTY - The Missouri Department of Transportation (MoDOTKC) is seeking public input regarding a planned bridge replacement on U.S. Route 50 eastbound at the South Fork of the Blackwater River near Powell Gardens. The public comment period...
-
Public comment period OPEN for US-50 bridge replacement near Powell Gardens, NOW - Nov. 10
JOHNSON COUNTY - The Missouri Department of Transportation (MoDOTKC) is seeking public input regarding a planned bridge replacement on U.S. Route 50 eastbound at the South Fork of the Blackwater River near Powell Gardens. The public comment period...
-
REMINDER: MoDOT to host public meeting for US-50 bridge project near Powell Gardens, TODAY (Oct. 27)
JOHNSON COUNTY – The Missouri Department of Transportation will host a public meeting regarding a bridge replacement on U.S. Route 50 eastbound over the South Fork of the Blackwater River, 0.1 miles east of the Route W/Z intersection near Powell...
FREQUENTLY ASKED QUESTIONS
Why is this project happening?
The eastbound bridge over the South Fork of the Blackwater River was constructed in 1965. Although safe to drive on, the bridge has reached the end of its service life.
What will be the traffic implications?
U.S. Route 50 will remain open in both directions but be reduced to one lane in each direction. Temporary crossovers will be utilized to move traffic through the area on the westbound lanes of Route 50.
Some movements at the Route W/Z intersection will be restricted:
- The right turn from US-50 EB to Route W South will remain open.
- The right turn from Route W to US-50 EB will be closed (detour using Route W, MO-58, & MO-131 to US-50).
- The left turn from US-50 WB to Route W South will be closed (detour using the J-turn on US-50 just west of Route Z).
- The right turns to/from US-50 WB at Route Z will remain open.
How much will this project cost?
This project will cost roughly $3 million and will use federal funds.
Project Contacts
Christopher West
Title
Project Manager
Department
Kansas City District
Contact Info
Marisela Ward
Title
Area Representative
Department
Kansas City District
Contact Info
Public Comment Form