The U.S. Route 160 bridge over North Fork Spring River in Barton County was built in 1928 and is in deteriorating condition in need of frequent maintenance.
Project Information
The contractor will demolish the current bridge and rebuild it with a bridge that is 117 feet longer and 8 feet wider than the current bridge. In addition, the contractor will add permanent pavement marking, guardrail and rumble strips to the ends of the new bridge.
NEWS RELEASES
-
Route 160/North Fork Spring River Bridge Replacement in Barton Co. Focus of Virtual Public Meeting
Barton County – The public is invited to a virtual (online) public meeting starting Friday, October 16, to learn more about plans to replace the U.S. Route 160 bridge over the North Fork Spring River in Barton County, the Missouri Department of...
Frequently Asked Questions
Why is this bridge being replaced?
The U.S. Route 160 bridge over North Fork Spring River was built in 1928 and is in deteriorating condition in need of frequent maintenance.
Will access to the entrances, county roads and state routes near the bridge be restricted during construction?
No. The bridge itself will be closed for up to five (5) months during construction, however the entrances, county roads, and state routes on either ends of the bridge will remain open throughout the duration of the project.
How will residents, farm equipment, tourists and commercial traffic get around the closure?
A detour will be signed over Route 126 and Interstate 49. Detour signs and changeable message boards will direct traffic onto the detour.
How can I ask a question or leave feedback about the project?
MoDOT will be hosting a virtual (online) public meeting from October 16-29, 2026. During that time, you may return to this website and fill out a feedback form found here. You may also send us an e-mail at swcr@modot.mo.gov or call us at (417) 895-7600.
Project Contacts
Craig Switzer
Title
Transportation Project Manager
Department
Southwest District
Contact Info
Email: Craig.Switzer@modot.mo.gov
Phone: (417) 621-6331
Email: Craig.Switzer@modot.mo.gov
Phone: (417) 621-6331
Michael Wake
Title
Area Engineer
Department
Southwest District
Contact Info
Harry S Truman Coordinating Council, JATSO & Northwest Arkansas Regional Planning Commission: Barton, Jasper, McDonald, & Newton Counties
Kaysinger Basin Regional Planning Commission: Bates, Benton, Cedar, Henry, Hickory, St. Clair & Vernon Counties
Email: Michael.Wake@modot.mo.gov
Phone: (417) 872-2224
Harry S Truman Coordinating Council, JATSO & Northwest Arkansas Regional Planning Commission: Barton, Jasper, McDonald, & Newton Counties
Kaysinger Basin Regional Planning Commission: Bates, Benton, Cedar, Henry, Hickory, St. Clair & Vernon Counties
Email: Michael.Wake@modot.mo.gov
Phone: (417) 872-2224