In Progress

Project Summary

The Platte River Bridge on Nodaway VV is scheduled to be replaced. The bridge was originally built in 1962. This Missouri Department of Transportation plans to replace the bridge, rebuilt the approaches, and install erosion control measures. 

Project Progress

In Progress
Planning & Design Phase

MoDOT is designing the bridge replacement project. This phase includes designing the bridge structure, determining traffic control and the detour to be used during construction, right of way acquisition and a public input period. 

milestone_icon
In Progress
Public Input Opportunity

MoDOT will offer three opportunities to receive community feedback regarding the bridge deck replacement project.

  1. A public open-house meeting will be held on Thursday, Aug. 7 from 5-7 p.m. at Jefferson High School in Conception Junction, 37614 U.S. Route 136, Conception Junction, MO 64434. Community members may stop by anytime to learn about the project.
  2. View the information on this webpage and utilize the form at the bottom of the page to submit your comments and/or sign up for project-specific updates.
  3. Mail your comments to:             

               Nodaway County Route VV bridge replacement

               Missouri Department of Transportation

                3602 North Belt Highway

                St. Joseph, MO 64506

         All comments must be postmarked by Thursday, Aug. 21, 2025.

We are committed to providing equal access to this event for all participants. If you need a reasonable accommodation or translation services, please contact NW District Communications at 816-901-4529 by Friday, Aug. 1.

milestone_icon
Not Started
Contract Letting

Contractors may submit competitive bids during MoDOT's scheduled lettings. This project is scheduled to be a part of the December 2025 letting. The Missouri Highways and Transportation Commission will consider all submitted bids at its scheduled monthly meeting in January 2026. If the lowest submitted bid meets all necessary criteria, the MHTC may award contracts at that time.

milestone_icon
Not Started
Contruction Schedule

After the contract is awarded, MoDOT will work with the contractor to determine the construction schedule. 

milestone_icon
Not Started
Project Completion

All work must be completed on or before Dec. 1, 2026, to meet contract requirements.

milestone_icon

Project News

  • Planned Roadwork for Northwest Missouri, Aug. 4-10

    08/01/2025

    St. Joseph, Mo. – The following is a list of general highway maintenance and construction work the Missouri Department of Transportation has planned in the Northwest Missouri region for the week of Aug. 4-10.

    There may be moving operations throughout...

  • Multi-county scrub seal project to begin July 28

    07/25/2025

    ST. JOSEPH, Mo. – The Missouri Department of Transportation has contracted Vance Brother Inc. for a scrub seal project that will lengthen the lifespan of roadways in seven counties. The project is scheduled to begin Monday, July 28. The contractor’s...

Frequently Asked Questions:

Q: Who can I contact if I have further questions?

A: Questions may be left by calling 888 ASK MODOT (888-275-6636) or emailing nwcr@modot.mo.gov.

 

Q: How can I stay updated on the project's progress?

A: Sign up for project-specific updates at the bottom of this page.

Webform
Have Project Questions or Feedback? Please use the form below to let us know.
*
CAPTCHA
This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.
Image
Bridge Deck of Nodaway County Route VV

Need More Information?

We're here to help! If you're looking for additional information, you can contact us at: 

  • nwcr@modot.mo.gov
  • 1-888-ASK-MODOT (888 275-6636) - reference Nodaway County Route VV bridge replacement
  • Sign up for eUpdates: Customer Service Signon (mo.gov)