Counties Impacted
Jasper
Route Impacted
BB
H
Work Type
Bridge Replacement
Planning Phase

Project Milestones

Not Started
Virtual (Online) Public Meeting

August 11-25, 2025

milestone_icon
Not Started
Project Out for Bid

January 16, 2026

milestone_icon
Not Started
Project Awarded to Contractor

March 2026

milestone_icon
Not Started
Construction Begins

Spring 2026

milestone_icon
Not Started
Project Completed

Summer 2026

milestone_icon

Purpose and Need

These two bridges were built in 1967 (Route BB) and 1933 (Route H) and are experiencing deterioration. These bridges need to be replaced to meet today's design standards.

Project Information

Contractor crews will replace these bridges with new bridges that will be longer, slightly higher and in the case of the Route H bridge, four (4) feet wider. In addition, the contractor will add barrier walls to each side of the bridges, permanent striping, guardrail on the Route BB bridge and object markers at the Route H bridge.

NEWS RELEASES

Frequently Asked Questions

Will there be any signed detours

Yes. For the Route BB bridge, drivers will be directed along Jasper County Route N, Missouri Route 37 and Missouri Route 96. On Route H, the detour will be along Missouri Route 43, Route M and Route O.

Will I be able to access my property on Route BB and Route H?

Yes. All driveways and field entrances will be accessible, however drivers will not be able to drive through the work zones when bridges have been demolished and the new bridges are under construction.

Will these bridges be closed simultaneously?

Likely, no. However, that will be up to the contractor’s schedule. Since these bridges are not on the same route, there is no reason from MoDOT’s perspective that they can’t be closed together.

How long will each bridge be closed?

Each bridge will be closed up to four (4) months for construction.

Why not have a temporary bridge alongside these bridges so the highways don’t have to be closed during construction?

To build a temporary bridge is expensive and no funds have been designated for that. In addition, the amount of traffic at these locations does not warrant a temporary bridge for this project.

Will MoDOT need to acquire any additional right of way for this project?

No. These bridges can be built within the existing right of way.

How much will this project cost?

It is estimated the cost of construction will be $1.6 million for each bridge.

How do I ask a question about this project or leave feedback?

You may submit your question or comment about this project on the comment form below during the comment period August 11-25, 2025. You also may send an e-mail to swcr@modot.mo.gov or call (417) 895-7600.

Webform

Project Contacts

Contact Photo
Bud "Warner" Sherman
Bud Sherman
Title
Transportation Project Manager
Department
Design
Contact Info

Email: Bud.Sherman@modot.mo.gov

Phone: (417) 895-7690

Contact Photo
Brittany Mitchell, Area Engineer
Brittany Mitchell
Title
Area Engineer
Department
Southwest District
Contact Info

Kaysinger Basin Regional Planning Commission, 
Harry S Truman Coordinating Council, JATSO & 
Northwest Arkansas Regional Planning Commission:
Barton, Bates, Benton, Cedar, Henry, Hickory, Jasper,
McDonald, Newton, St. Clair & Vernon Counties
Email:  Brittany.Mitchell@modot.mo.gov
Phone: (417) 340-6468