Counties Impacted
St. Charles
Route Impacted
94
D
Work Type
Intersection Improvements
Planning Phase

Project Milestones

In Progress
Project Design
milestone_icon
Not Started
Public Meeting
Spring 2026
milestone_icon
Not Started
Project Acquires Land
Spring 2026 – Mid 2027
milestone_icon
Not Started
Contract Awarded
Summer 2027
milestone_icon
Not Started
Construction Complete
End of 2028
milestone_icon

Route 94 and Route D Public Meeting

The Missouri Department of Transportation invite the public to an open house-style meeting to discuss the Route 94 and Route D Improvement Project. The meeting will be held Wednesday, July 8, 2026, from 4 p.m. to 6 p.m. at the Weldon Spring Site Interpretive Center, 7295 South Highway 94, St. Charles, MO 63304.

MoDOT is implementing two projects to improve intersection and corridor operations on Route 94 and Route D in St. Charles County in the vicinity of Francis Howell High School. 

Route 94 and Route D Improvements include the following:  

  • Providing a second westbound Route 94 through lane at the Route D intersection and extending that approximately 0.25 miles to the east Francis Howell High School entrance. 
  • On Route D, add a second left turn lane from southbound Route D to eastbound Route 94. 
  • Converting the rear Francis Howell High School entrance into a three-quarter access driveway (left-in; right-in/right-out) while widening Route D to add left-turn lanes at the same intersection. 
  • Installing new signals and lighting at the intersection of Route 94 and Route D. 

Route 94 Widening includes the following: 

  • Widening Route 94 from two lanes to four lanes for approximately 1.0 miles from Route D to the I-64 interchange.

To make these improvements, provide drainage and safe slopes, and maintain a utility corridor, additional right of way will be required, including a 0.80-acre section from the August A. Busch Conservation Area (Conservation Commission of Missouri) and a 0.13-acre section of Weldon Spring Conservation Area. MoDOT will begin outreach to affected property owners soon.

Access will be maintained during construction, and no direct impacts are expected to the nearby Hamburg Trail and Busch Greenway. Travel delays and short-term detours may be encountered during construction.  

No formal presentations will be made during the open-house style meeting. Attendees can stop by at any time during the meeting to view the project details and speak with representatives from MoDOT and project consultants.

Access for people with disabilities is available. People with disabilities who require special services at the public meeting should notify Senior Communications Specialist Jack Wang at 314-453-1814 so arrangements for those services can be made.

For those who are unable to attend the meeting in person, the information shared during the meeting as well as a comment form will be available at: https://www.modot.org/projects/missouri-route-94-and-route-d-intersection-improvements-st-charles-county beginning on the day of the meeting. People are welcome to view the information and provide comments about the project until Wednesday, July 29.

Project Summary

MoDOT is implementing two projects to improve intersection and corridor operations on Route 94 and Route D in St. Charles County in the vicinity of Francis Howell High School. 

Intersection improvements at and near the Route 94 and Route D intersection are being funded in part by a Congestion Mitigation and Air Quality Improvement (CMAQ) grant. Improvements include the following: 

  • Providing a second westbound Route 94 through lane at the Route D intersection and extending that approximately 0.25 miles to the east Francis Howell High School entrance. 

  • On Route D, add a second left turn lane from southbound Route D to eastbound Route 94. 

  • Converting the rear Francis Howell High School entrance into a three-quarter access driveway (left-in; right-in/right-out) while widening Route D to add left-turn lanes at the same intersection. 

  • Installing new signals and lighting at the intersection of Route 94 and Route D. 

Route 94 Widening includes the following: 

  • Widening Route 94 from two lanes to four lanes for approximately 1.0 miles from Route D to the I-64 interchange. 

Project Impacts 

The project will require additional narrow sections of right of way in select locations along Route 94 and Route D. Temporary construction easements will be required for construction and permanent drainage easements will be needed for future maintenance of stormwater pipes and outlets. This includes minor impacts to the August A. Busch Memorial Conservation Area and the Weldon Spring Conservation Area which will be presented for public input at an upcoming public meeting. 

Project News Releases

What if I have questions?

Contact Photo
Andy Tuerck
Andy Tuerck, P.E.
Title
Area Engineer, St. Charles County
Contact Info

314-453-5046
Email: andrew.tuerck@modot.mo.gov

Michael Blattner, P.E.
Title
St. Charles County Transportation Project Manager
Department
St. Louis District
Contact Info

314-453-1751 

Email: michael.blattner@modot.mo.gov