Project Summary

The Missouri Department of Transportation plans to rehabilitate the Route 41 bridge over the Lamine River. A preventative maintenance treatment will be applied on the deck.

  • Built in 2014.
  • Approximately 30 calendar days of construction.
    • Route 41 will remain open at the bridge during construction.
  • The total cost, including engineering and construction, is estimated to be $306,000 (subject to change). 

Project Progress

Complete
Planning and Design Phase

A project to rehabilitate the bridge is currently being designed by the Missouri Department of Transportation.

milestone_icon
Complete
Public Outreach

MoDOT is hosted an online public meeting for this project on this webpage. Interested parties commented below during the three-week comment period starting Nov. 13, 2024, and ending Dec. 4, 2024. Additionally, comments were sent to CDCR@modot.mo.gov by Dec. 4 with the subject line: Cooper County Route 41 Bridge or comments may be mailed, postmarked by Dec. 4, to Cooper County Route 41 c/o MoDOT, 1511 Missouri Boulevard, Jefferson City, MO, 65109.

milestone_icon
Complete
Project Letting, Award, and Notice to Proceed

The project was part of MoDOT's February 2025 letting when contractors submitted competitive bids. The Missouri Highways and Transportation Commission awarded the $120,760 contract as part of their March 2025 meeting to Louis-Company, LLC. 

milestone_icon
In Progress
Project Construction, Traffic Impacts, and Completion

Construction is planned to begin July 7, 2025. After construction begins the contractor will have 30 calendar days to complete the construction although the contractor only plans to close a single lane for 10 days.  

At this time, construction is anticipated to be completed by July 22, 2025. 

milestone_icon

Bridge Location

Google Map
Google Map

Project News

  • Cooper County Route 41 bridge maintenance starting soon

    06/18/2025

    JEFFERSON CITY, Mo – A preventative maintenance project is about to begin on the Lamine River Bridge on Missouri Route 41 in Cooper County. Starting July 7, 2025, crews working with the Missouri Department of Transportation will be sealing the bridge...

  • MoDOT seeking input on Cooper County Route 41 Bridge Project

    11/13/2024

    JEFFERSON CITY, Mo – A project is in the planning stages to perform preventative maintenance and replace the approaches on the Lamine River Bridge on Missouri Route 41 in Cooper County. The Missouri Department of Transportation is seeking community...

FREQUENTLY ASKED QUESTIONS

What if I have more questions?

You may email cdcr@modot.mo.gov or call us at 888 ASK MODOT (1-888-275-6636). Please reference Cooper County Route 41 Bridge Rehabilitation on your inquiries.

Sign up for project-specific updates using the form below.

Methyl Methacrylate (MMA) crack sealing treatment. 

By email – Send your comments to CDCR@modot.mo.gov by Dec. 4 with the subject line: Cooper County Route 41 Bridge.

By mail – Comments may be mailed, postmarked by Dec. 4, to Cooper County Route 41 c/o MoDOT, 1511 Missouri Boulevard, Jefferson City, MO, 65102.