Counties Impacted
Taney
Route Impacted
265
Work Type
New Bridge Construction
Additional Work Types
Intersection Improvements
Planning Phase

PROJECT TIMELINE

Public Meeting
Tuesday, August 11, 2026, from 4:30 pm - 6 pm
Ozark Technical College Table Rock Campus
10698 Historic Hwy 165, Hollister, MO 65672

This is a come-and-go style meeting with no formal presentation. If you cannot attend, please review the project information and complete the comment form below by August 25.

milestone_icon
Contractor's Bid on Project
December 2026
milestone_icon
Project Awarded to Contractor
January 2027
milestone_icon
Construction Begins
Spring 2027
milestone_icon
Construction Completion
December 2027
milestone_icon

crane Project Information

  • Constructing a New Bridge over U.S. Route 65 north of the existing U.S. Route 65 and Missouri Route 265 signalized intersection
  • Adding one acceleration lane for Missouri Route 265 to southbound U.S. Route 65
  • Remove existing signals and center median at U.S. Route 65 and Missouri Route 265
  • Estimated Total Cost: $6.1 million

Traffic Impacts

  • Nighttime U.S. Route 65 short-term CLOSURE for bridge beam/girder placement over U.S. Route 65
  • Flaggers on Missouri Route 265 to direct traffic during the bridge beam/girder placement
  • Carpenter Drive and Cedar Valley Road CLOSED in 15-minute increments as crews connect the roads to the New Missouri Route 265 Bridge over U.S. Route 65

Project Updates

Frequently Asked Questions:

What is the purpose of the new bridge over Route 65?

The new bridge allows access to both the northbound and southbound lanes of U.S. Route 65 without having to cross the center median.

Why is this not becoming an interchange?

Due to current funding levels, MoDOT could not include the ramps needed to create a full interchange. However, the bridge and roadway have been designed to accommodate future ramps if funding becomes available.

Isn’t the Ozark Mountain High Road planned to connect to Route 65 in this area?

Yes, the new bridge will be built along the previously planned right-of-way alignment for the Ozark Mountain High Road. If funding becomes available to construct the High Road’s southern segment, the bridge will be positioned for the High Road to intersect with U.S. 65 at that location.

Will Route 65 be closed during construction?

U.S. Route 65 will remain open for the majority of construction. However, nighttime short-term delays and closures will occur as crews place the bridge beam/girder over U.S. Route 65. 

How will the project affect Carpenter Drive and Cedar Valley Road?

Carpenter Drive and Cedar Valley Road will connect to both the new bridge over Route 65 and to Route 265 south of the bridge. Most of the construction will occur away from these outer roads. Traffic impacts on Carpenter Drive and Cedar Valley Road will include brief closures of up to 15 minutes as crews complete work to tie the bridge into the outer roads.

How is this project supposed to improve the safety of the intersection?

This project removes signals on Route 65, allowing northbound and southbound traffic to continue without stopping at red lights. The design also eliminates the risk of a 90-degree collision with high‑speed traffic at the current intersection. By adding acceleration and deceleration lanes on Route 65—where drivers can adjust their speed before merging or turning—the project helps reduce impacts on overall traffic flow.

The last day to leave comments on this project is Tuesday, August 25.

Webform
Name:

Thank you for your feedback. The MoDOT project team carefully reviews and considers all comments. While every comment is considered, not all comments may result in changes to the final project design.

CAPTCHA
This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.
Embed
Is Responsive
Embed Code

worker Project Contacts

Contact Photo
Beth Schaller Portrait
Beth Schaller
Title
Area Engineer
Department
Southwest District
Contact Info

Forward 44: Southwest I-44 Improvements Deputy Project Director,
Ozarks Transportation Organization: Greene & Christian Counties
Southwest Missouri Council of Governments: Barry, Christian, Dade, Dallas, Greene, Lawrence, Polk, Stone, Taney, & Webster Counties
Email: Beth.Schaller@modot.mo.gov
Phone: (417) 529-4120

 

Contact Photo
Ray Cook, Project Manager
Ray Cook
Title
Transportation Project Manager
Department
Design
Contact Info

Southwest District

Email: darrell.cook@modot.mo.gov

Phone: (417) 895-7644
 

Contact Photo
Jason Evenden
Jason Evenden
Title
Branson Resident Engineer
Department
Construction and Materials
Contact Info

Southwest District 

Email: jason.evenden@modot.mo.gov

Phone: 417.335.5635