Districts Impacted
Project Summary
The Business Route 240 bridge over CPKC Railroad in Howard County, east of Glasgow, is slated for replacement in 2027 or 2028, dependent on contractor scheduling. Built in 1934, the bridge is in poor condition and showing signs it has reached the end of its useful life.
Construction of a new bridge will require a full roadway closure. A signed detour is planned over Missouri Route 240, 5, and Business Route 240.
PUBLIC MEETING
An in-person public meeting will be held on Thursday, Sept. 3, 2026, at the Armstrong City Hall from 4:30 to 6 p.m. Members of the project team will be on hand to provide information and answer questions from the community. There will be no formal presentation, so members of the public can come and go as they please. By participating and commenting, the public can help MoDOT determine the design and construction plan that best serves the needs of the roughly 700 motorists who use the bridge on an average day, while being responsible stewards of available funding.
Meeting Materials
Bridge Location
Business Route 240 bridge
Project Progress
The Missouri Department of Transportation is in the process of designing a new bridge on Business Route 240 bridge over CPKC railroad in Howard County. The new bridge will be 28 feet wide, 1 foot wider than the current structure. The project also includes new approach pavement, barriers, pavement marking, and raising the bridge to meet current railroad requirement.
The project is expected to be constructed on existing right of way.
The estimated total cost (engineering and construction) for this project is $5.1 million. This cost may change.
During the three-week comment period running Aug. 27 – Sept. 17, 2026, the community and interested parties will have multiple avenues to learn about, ask questions, and submit input regarding the planned work and associated traffic impacts.
-
In-person - An open-house-style public meeting will be held Thursday, Sept. 3, 2026, from 4:30 to 6 p.m. at the Armstrong City Hall, located at 106 Halley Street in Armstrong. The project team will be on hand to answer questions, provide information, and receive input about the project. There will be no formal presentation, so attendees may come and go as they please at any time during the advertised hours.
-
Online - All meeting exhibits are available on this website, and feedback may be submitted using the form below by Sept. 17, 2026.
-
By email – Send comments to CDCR@modot.mo.gov by Sept. 17, 2026, with the subject line: Business Route 240 Bridge Replacement over CPKC Railroad in Howard County.
-
By traditional mail – Comments may be mailed to Missouri Department of Transportation, 1511 Missouri Boulevard, Jefferson City, MO 65109, postmarked by Sept. 17, 2026. Please reference: Business Route 240 Bridge Replacement over CPKC Railroad in Howard County.
The project is currently scheduled to be part of MoDOT's May 2027 letting, when contractors may submit competitive bids. The Missouri Highways and Transportation Commission may award the contract as part of their June 2027 meeting and, if the contract is awarded, a notice to proceed date will also be given. That is the earliest date the contractor may begin work.
Construction is expected to take place in 2027 or 2028, dependent on contractor scheduling. The roadway is expected to be closed up to 150 days, subject to change.
A signed detour is planned to direct motorists to use Missouri Routes 240, 5, and Business Route 240.
This project will be included in the same contract as the Missouri Route 3 Bridge Replacement over CPKC Railroad in Howard County, in Armstrong. For more details on this project visit here: Missouri Route 3 Bridge Replacement over CPKC Railroad in Howard County.
At this time, the new bridge is expected to be completed by Dec.1, 2028.
FREQUENTLY ASKED QUESTIONS
Why is MoDOT replacing the bridge?
Built in 1934, the bridge is in poor condition, showing signs it has reached the end of its useful life, and in need of replacement.
How will this bridge work affect traffic?
Construction of a new bridge will require a full roadway closure. A signed detour is planned to direct motorists to use Missouri Routes 240, 5, and Business Route 240.
What is the expected completion date for this project?
At this time, the new bridge is expected to be completed by Dec. 1, 2028.
What if I have further questions?
You may email cdcr@modot.mo.gov or call us at 888 ASK MODOT (1-888-275-6636). Please reference Business Route 240 Bridge Replacement over CPKC Railroad in Howard County on your inquiries.
How can I stay updated on the project’s progress?
Sign up for project-specific updates using the form below.
Project News
-
Public input sought on two Howard County bridge projects
JEFFERSON CITY, Mo. – The Missouri Department of Transportation is seeking community input on plans to replace the Business Route 240 and Missouri Route 3 bridges over CPKC Railroad in Howard County, east of Glasgow. Built in 1934 and 1941...
-
Planned Road Work for Mid-Missouri
JEFFERSON CITY, Mo. – The following is a list of general highway maintenance and construction work planned in the mid–Missouri area Aug. 17 - 23, 2026.
In addition to the work listed below, other moving operations such as pothole patching, mowing, ...
-
Planned Road Work for Mid-Missouri
JEFFERSON CITY, Mo. – The following is a list of general highway maintenance and construction work planned in the mid–Missouri area Aug. 10 - 16, 2026.
In addition to the work listed below, other moving operations such as pothole patching, mowing...