Update for Week of July 28
- Nighttime lane closings on Route 65 for prep work
- Detour signing and electronic message boards deployed throughout Springfield metro area
- Southbound Route 65 CLOSED between Sunshine St. and Battlefield Rd. August 4-10
Work Scheduled:
- Installing erosion control devices in areas
- Cutting concrete pavement in southbound lanes of Route 65 between Sunshine Street and Battlefield Road
- Installing detour signs along I-44, Route 125, Route 60 and Route 360
- Deploying electronic message signs in various locations throughout Springfield metro area
Traffic Impacts:
- Nighttime lane closings on Route 65 between Sunshine Street and Battlefield Road. At least one lane in each direction will remain open during the work.
- Work hours: 8 p.m. until 6 a.m. Wednesday through Friday, July 31-August 2.
- Crews and equipment entering and leaving work areas
- Temporary traffic signals flashing at Blackman Road/Battlefield Road and Greene County Route D/Missouri Route 125 intersections (Signals go into full operation around noon on Saturday, August 3.)
(Weather or construction delays could alter the work schedule.)
Project Summary:
- Wednesday-Friday, July 31-August 2
- Nighttime lane closings on southbound Route 65
- Sunday-Saturday, August 4-10
- All southbound lanes of Route 65 CLOSED between Sunshine Street and Battlefield Road
- Southbound on ramp from Sunshine Street to Route 65 CLOSED
- Southbound off ramp from Route 65 to Battlefield Road CLOSED
- Southbound Route 65 lanes will close at 12:01 a.m. on Sunday, August 4, and reopen
- Saturday-Tuesday, August 10-20
- All southbound lanes of Route 65 CLOSED between Battlefield Road and Route 60
- Southbound Route 65 OPEN between Sunshine Street and Battlefield Road, but reduced to one lane
- Southbound on ramp from Battlefield Road to Route 65 CLOSED
- Southbound Route 65-to-westbound Route 60 ramp CLOSED
All lanes of Route 65 open during the Labor Day holiday (Tuesday-Friday, August 20-September 6)
- Friday-Saturday, September 6-14
- All northbound lanes of Route 65 CLOSED between Route 60 and Battlefield Road
- Eastbound Route 60-to-northbound Route 65 ramp CLOSED
- Westbound Route 60-to-northbound Route 65 ramp CLOSED
- Northbound off ramp from Route 65 to Battlefield Road CLOSED
- Saturday-Friday, September 14-20
- All northbound lanes of Route 65 CLOSED between Battlefield Road and Sunshine Street
- Northbound Route 65 OPEN between Route 60 and Battlefield Road, but reduced to one lane
- Northbound on ramp from Battlefield Road to Route 65 CLOSED
- Northbound off ramp from Route 65 to Sunshine Street CLOSED
- Eastbound Route 60-to-northbound Route 65 ramp CLOSED
- Westbound Route 60-to-northbound Route 65 ramp CLOSED
- Route 60 crossovers CLOSED between Route 65 and Greene County Routes NN/J
- September 20-November 1
- Nighttime lane closings for shoulder construction/guardrail/striping
- Prime Contractor: Emery Sapp and Sons, Inc. of Columbia
- Completion Date: November 2019 (However, contractor plans to complete project by late September.)
- Total Project Cost: $8.1 million
END
(For more information, call MoDOT in Springfield at 417-895-7600 or visit www.modot.org/southwest)
(Follow MoDOT's Southwest District: Facebook | Twitter | Instagram |YouTube)
(For timely traffic information in the Springfield area, visit www.ozarkstraffic.com)
Districts Involved
Southwest
Published On