JACKSON COUNTY – Crews will perform resurfacing operations requiring various lane closures in both directions on MO 150 (between MO 291 and U.S. 50) and on Raintree Dr., evening and overnight, 7 p.m. to 6 a.m., March 17-July 1. Lane closures will be in place during the work hours of 7 p.m. until 6 a.m., evening and overnight, March 17-July 1. All work is weather permitting. This work will take place on MO 150 between MO 291 and U.S. 50 in the following phases.
7 p.m. to 6 a.m., evening and overnight, March 17- April 7 (anticipated)
- Crews will make repairs to prepare for repaving operations.
7 p.m. to 6 a.m., evening and overnight, May 1 – July 1 (anticipated)
- Work will resume and crews will perform repaving operations.
Motorists are reminded to slow down and pay attention while driving in work zones. Not all work zones look alike. Work zones can be moving operations, such as striping, patching or mowing. They can also be short-term, temporary lane closures to make quick repairs or remove debris from the roadway.
For more information about MoDOT news, projects or events, please visit our website at www.modot.org/kansascity. For instant updates, follow MoDOT_KC on X, or share posts and comments on our Facebook at www.facebook.com/MoDOT.KansasCity/. MoDOT Kansas City maintains more than 7,000 miles of state roadway in nine counties. Sign up online for workzone updates or call 888-ASK-MODOT (275-6636).