JACKSON AND CLAY COUNTIES – Crews with the Buck O’Neil Bridge project will make the following closures:
8 p.m. on Friday, Sept. 27 until 11 p.m. on Sunday, Sept. 29
- Crews will close the ramp from WB I-70 to SB I-35.
- Crews will close the right lane of NB I-35 at 12th St. to 6th St.
- Crews will close the ramp from NB I-35 to 6th St.
- Crews will close the ramp from Beardsley Rd. to 6th St.
- Crews will close the ramp from EB I-70 to 6th St.
- Crews will close Washington St. at 6th St.
8 p.m. on Friday, Sept. 27 until 3 p.m. on Monday, Sept. 30
- Crews will close NB U.S. 169 at 6th St. to Richards Rd.
- Crews will close the ramp from WB I-70 to U.S. 169.
- Crews will close 5th St./Independence Ave. at Wyandotte St. to U.S. 169.
RAMP CLOSURE: ONGOING through mid Sept. 2024
- The ramp from eastbound I-70 to southbound I-35 will be closed for repair and rehabilitation as part of the Buck O'Neil Bridge project.
The current Buck O’Neil Memorial Bridge is a triple arch bridge carrying U.S. Route 169 over the Missouri River and serves as a key regional connection between downtown Kansas City and communities north of the river. While safe, the bridge is nearing the end of its projected service life.
#BuckBridge
Motorists are reminded to slow down and pay attention while driving in work zones. Not all work zones look alike. Work zones can be moving operations, such as striping, patching or mowing. They can also be short term, temporary lane closures to make quick repairs or remove debris from the roadway.
For more information about MoDOT news, projects or events, please visit our website at www.modot.org/kansascity. For instant updates, follow MoDOT_KC on X, or share posts and comments on our Facebook at www.facebook.com/MoDOT.KansasCity/. MoDOT Kansas City maintains more than 7,000 miles of state roadway in nine counties. Sign up online for workzone updates or call 888-ASK-MODOT (275-6636).